NRC 2012-0112, Notification of Readiness for NRC 95001 Inspection
| ML12340A491 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 12/05/2012 |
| From: | Meyer L Point Beach |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| EA-12-106, IR-12-504, NRC 2012-0112 | |
| Download: ML12340A491 (1) | |
Text
December 5,2012 BEACH NRC 2012-01 12 EA-12-106 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 Notification of Readiness for NRC 95001 lnspection
Reference:
NRC letter to NextEra Energy Point Beach, LLC, dated July 24, 2012, Final Significance Determination of a White Finding with Assessment Followup and Notice of Violation; NRC lnspection Report Nos. 05000266/2012504 and 05000301/2012504; Point Beach Nuclear Plant, Units 1 and 2 (ML12206A514)
By letter dated July 24, 2012 (Reference), the Nuclear Regulatory Commission (NRC) informed NextEra Energy Point Beach, LLC (NextEra) of plans for a future inspection of Point Beach Nuclear Plant (PBNP), in accordance with lnspection Procedure 95001, "Supplemental lnspection for One or Two White Inputs in a Strategic Performance Area," for the logic error in a NextEra Emergency Plan Implementing Procedure. Additionally, the NRC determined that NextEra did not initiate protective action recommendations when the projected dose to an individual was 1 rem beyond the 10-mile plume exposure pathway.
This letter is to notify the NRC that PBNP is ready for the 95001 inspection. Accordingly, NextEra requests the NRC to commence the 95001 inspection on March 4,2013.
This letter contains no new Regulatory Commitments and no revisions to existing Regulatory Commitments.
Very truly yours, NextEra Ener Point Beach, LLC A
iaR Larry Meyer Site Vice President Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Branch Chief, Plant Support, Region Ill, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC Senior Emergency Preparedness Inspector, Region Ill, USNRC Branch Chief, Reactor Projects Branch 5, Region Ill, USNRC NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241