NRC 2010-0144, License Amendment Request 261, Supplement 8 Extended Power Uprate

From kanterella
(Redirected from NRC 2010-0144)
Jump to navigation Jump to search
License Amendment Request 261, Supplement 8 Extended Power Uprate
ML102520327
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 09/09/2010
From: Meyer L
Point Beach
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2010-0144
Download: ML102520327 (5)


Text

September 9,201 0 ENERGY@

POINT BEACH 7

NRC 2010-0144 10 CFR 50.90 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units I and 2 Dockets 50-266 and 50-301 Renewed License Nos. DPR-24 and DPR-27 License Amendment Request 261, Su~plement 8 Extended Power Uprate

References:

(I)

FPL Energy Point Beach, LLC letter to NRC, dated April 7,2009, License Amendment Request 261, Extended Power Uprate (ML091250564)

(2)

NextEra Energy Point Beach, LLC letter to NRC, dated June 11,201 0, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Information, (ML101650075)

(3)

NextEra Energy Point Beach, LLC letter to NRC, dated July 8, 201 0, License Amendment Request 261, Supplement 5, Extended Power Uprate (MLI 01 890785)

NextEra Energy Point Beach, LLC (NextEra) submitted License Amendment Request (LAR) 261 (Reference I ) to the NRC pursuant to 10 CFR 50.90. The proposed amendment would increase each unit's licensed thermal power level from 1540 megawatts thermal (MWt) to 1800 MWt, and revise the Technical Specifications to support operation at the increased thermal power level.

In a teleconference on August 27, 2010, the NRC requested that NextEra provide proposed license conditions that address Reference 1 Regulatory Commitments 13, 14, and 15.

Enclosure I provides new proposed license conditions that correspond to Regulatory Commitments 14 and 15. NextEra proposed a final resolution of Regulatory Commitment 13 in Reference 2. Therefore, no corresponding license condition is proposed for Regulatory Commitment 13.

NextEra Energy Point Beach, LLC, 6610 Nuclear Road, Two Rivers, WI 54241

Document Control Desk Page 2 This letter contains no new regulatory commitments and closes two regulatory commitments that are superseded by the License Conditions proposed in Enclosure 1. Attachment 4 to Reference 1 includes these two regulatory commitments as follows:

"14. Eliminate the reliance on local manual action to gag the motor-driven and turbine-driven AFW pump mini-recirculation valves open prior to operation of either unit at EPU conditions.

15. A self-cooled (i.e., air-cooled) air compressor will be installed to supply Instrument Air. The compressor will be independent of service water cooling and aligned for automatic operation. It will be installed prior to operation of either unit at EPU conditions."

In Reference 3, NextEra revised the no significant hazards consideration (NSHC) evaluation regarding the Auxiliary Feedwater System upgrade. The NSHCs provided in Reference I and Reference 3 are not altered by the information in this supplement. The proposed changes continue to satisfy the criteria of 10 CFR 51 -22 for categorical exclusion from the requirements for an environmental assessment.

The proposed license conditions have been reviewed by the Plant Operations Review Committee.

In accordance with 10 CFR 50.91, a copy of this letter is being provided to the designated Wisconsin Official.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on September 9,2010.

Very truly yours, NextEra Eneryy-Bqnt Beach, LLC Larry Meyer Site Vice President Enclosure cc:

Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC PSCW

ENCLOSURE I NEXTERA ENERGY POINT BEACH, LLC POINT BEACH NUCLEAR PLANT, UNITS I AND 2 LICENSE AMENDMENT REQUEST 2611, SUPPLEMENT 8 EXTENDED POWER UPRATE PROPOSED APPENDIX C LICENSE CONDITIONS 2 pages follow

APPENDIX C ADDITIONAL CONDITIONS OPEFWTING LICENSE DPR-24 NextEra Energy Point Beach, LLC shall comply with the following conditions and the schedules noted below:

Amendment Number Additional Conditions Implementation Date -

228 At the time of the closing of the transfer of the lic%nses from Wisconsin Electric Immediately Power Company (WEPCO) to FPLE Point Beach, WEPCO shall transfer to FPLE Point Beach WEPCO's decommissioning funds in an aggregate minimum value of $200.8 million for Point Beach Unit 1. FPLE Point ~each' shall deposit such fun9s in an external decommissioning trust fund established by FPLE Point Beach for Point Beach Units 1 and 2. The trust agreement shall be in a form acceptable to the NRC.

NextEra Energy Point Beach shall take no actions to cause FPL Group Immediately Capital, or its successors and assigns, to void, cancel, or modify its $70 million Support Agreement (Agreement) to NextEra Energy Point Beach, as presented in its application dated January 26, 2007, or cause it to fail to perform or impair its performance under the Agreement, without the prior written consent from the NRC. The Agreement may not be amended or modified without 30 days prior written notice to the Director of Nuclear Reactor Regulation or his designee. An executed copy of the Agreement shall be submitted to the NRC no later than 30 days after the completion of the license transfers. Also, NextEra Energy Point Beach shall inform the NRC in writing anytime it draws upon the $70 million Agreement.

Prior to O~eration Of XXX NextEra Point Beach. LLC shall eliminate the reliance on local manual action Either Unit At to aaa the Motor-Driven and Turbine-Driven AFW Dump mini-recirculation valves open.

Conditions XXX NextEra Point Beach, LLC shall install a self-cooled (i.e.. air-cooled) air Prior to com~ressor capable of suo~lvina Instrument Air. The compressor shall be Ooeration Of inde~endent of Service Water coolina and normallv alianed for automatic Either Unit At operation.

EPU Conditions

  • On April 16,2009, the name "FPLE Point Beach, LLC was changed to "NextEra Energy Point Beach, LLC."

Point Beach Unit I C-2 Amendment No. 2%

APPENDIX C ADDITIONAL CONDITIONS OPERATING LICENSE DPR-27 NextEra Energy Point Beach, LLC shall comply with the following conditions and the schedules noted below:

Amendment Number Additional Conditions Implementation Date -

233 At the time of the closing of the transfer of the lic2nses from Wisconsin Electric Immediately Power Company (WEPCO) to FPLE Point Beach, WEPCO shall transfer to FPLE Point Beach* WEPCO's decommissioning funds in an aggregate minimum value of $189.2 million for Point Beach Unit 2. FPLE Point ~each*

shall deposit such fungs in an external decommissioning trust fund established by FPLE Point Beach for Point Beach Units 1 and 2. The trust agreement shall be in a form acceptable to the NRC.

NextEra Energy Point Beach shall take no actions to cause FPL Group Immediately Capital, or its successors and assigns, to void, cancel, or modify its $70 million Support Agreement (Agreement) to NextEra Energy Point Beach, as presented in its application dated January 26, 2007, or cause it to fail to perform or impair its performance under the Agreement, without the prior written consent from the NRC. The Agreement may not be amended or modified without 30 days prior written notice to the Director of Nuclear Reactor Regulation or his designee. An executed copy of the Agreement shall be submitted to the NRC no later than 30 days after the completion of the license transfers. Also, NextEra Energy Point Beach shall inform the NRC in writing anytime it draws upon the $70 million Agreement.

Prior to Oeeration Of XXX NextEra Point Beach, LLC shall eliminate the reliance on local manual action Either Unit At to aaa the Motor-Driven and Turbine-Driven AFW pume mini-recirculation EPU valves open.

Conditions XXX NextEra Point Beach. LLC shall install a self-cooled (i.e.. air-cooled) air Prior to compressor caaable of suaplvinq Instrument Air. The comaressor shall be Oeeration Of independent of Service Water coolina and normallv alianed for automatic Either Unit At operation.

Conditions

  • On April 16,2009, the name "FPLE Point Beach, LLC" was changed to "NextEra Energy Point Beach, LLC."

Point Beach Unit 2 C-2 Amendment No. 24.4