Letter Sequence Request |
|---|
|
|
MONTHYEARML0510504842005-04-15015 April 2005 RAI, Licensing Basis for Control of Heavy Loads Project stage: RAI NRC 2005-0055, Units I and 2, Request for Review of Heavy Load Analysis2005-04-29029 April 2005 Units I and 2, Request for Review of Heavy Load Analysis Project stage: Request NRC 2005-0063, To Request for Exigent Review of Heavy Load Analysis2005-05-13013 May 2005 To Request for Exigent Review of Heavy Load Analysis Project stage: Request ML0515803372005-05-19019 May 2005 Calculation M-11165-048-1, Rev 00, Evaluation of Bottom-Mounted Instrument (Bmi) Conduits for Postulated Reactor Vessel Displacement Project stage: Request ML0514702992005-05-27027 May 2005 Ral, Proposed License Amendment for Reactor Vessel Head Handling Project stage: Other NRC 2005-0067, Response to Request for Additional Information Regarding Request for Exigent Review of Heavy Load Analysis2005-06-0101 June 2005 Response to Request for Additional Information Regarding Request for Exigent Review of Heavy Load Analysis Project stage: Response to RAI ML0515404652005-06-0303 June 2005 Request for Additional Information Regarding Proposed License Amendment for Reactor Vessel Head Handling Project stage: RAI ML0602403642005-06-20020 June 2005 Westinghouse Report Plastic Analysis of Point Beach Reactor Coolant Piping for Reactor Vessel Head Drop, Revision 1 Dated June 20, 2005 Project stage: Request 05000301/LER-2005-001, Regarding Main Steam Safety Valve 2MS-02008 Lift Set Point Exceeds Acceptance Criteria2005-06-20020 June 2005 Regarding Main Steam Safety Valve 2MS-02008 Lift Set Point Exceeds Acceptance Criteria Project stage: Request ML0518702992005-06-23023 June 2005 Enclosure, Sargent & Lundy Calculation, Analysis of Postulated Reactor Head Load Drop Onto the Reactor Vessel Flange, Revision 3, Dated June 23, 2005 Project stage: Request ML0517801752005-06-24024 June 2005 6/24/05, Point Beach, Unit 1 and Unit 2 - Withdrawal of an Amendment Request Project stage: Withdrawal ML0517506782005-06-24024 June 2005 License Amendment 225 Incorporation of Reactor Pressure Vessel Head Drop Analysis Into the Final Safety Analysis Report Project stage: Approval ML0517904092005-08-11011 August 2005 Errata to Safety Evaluation for Amendment No. 225, Dated June 24, 2005 Project stage: Approval NRC 2005-0079, Request for Withholding of Proprietary Information from Public Disclosure2005-09-0101 September 2005 Request for Withholding of Proprietary Information from Public Disclosure Project stage: Request NRC 2005-0117, Request for Withholding of Proprietary Information from Public Disclosure2005-09-0707 September 2005 Request for Withholding of Proprietary Information from Public Disclosure Project stage: Request ML0601200792006-01-23023 January 2006 Withholding Information from Public Disclosure, WEP-05-318-P - Attachment, Point Beach Unit 2 Reactor Vessel CMTRs Project stage: Other ML0602400292006-02-0909 February 2006 Document Reclassified as Non-Proprietary Project stage: Other ML0603000432006-02-13013 February 2006 Document Reclassified as Non-Proprietary Project stage: Other ML0605304542006-02-20020 February 2006 Fax from Licensee Regarding 2005 Steam Generator Tube Inspections at Salem, Unit 2 Project stage: Other 2005-06-24
[Table View] |
Text
Committed to Nuclear Excellence Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC September 1, 2005 NRC 2005-0114 10 CFR 2.390 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Request for Withholdina of Proorietarv Information from Public Disclosure
References:
- 1. Letter from NMC to NRC dated August 26,2005 (NRC 2005-0110)
- 2. Letter from NMC to NRC dated June 20, 2005 (NRC 2005-0079)
In Reference 1, Nuclear Management Company, LLC (NMC), submitted the reclassified non-proprietary version of Westinghouse Calculation Note Number CN-RCDA-05-68, Revision 2, "Plastic Analysis of Point Beach Reactor Coolant Piping for Reactor Vessel Head Drop", dated July 18, 2005. Reference 2 had submitted an earlier version of this calculation (Revision 1) as a proprietary document. Revision 2 superseded Revision 1.
Westinghouse Electric Company ("Westinghouse"), the owner of the information, has informed NMC that CN-RCDA-05-68, Revision 2, consisted of additions and clarifications to Revision 1. Westinghouse stated that since CN-RCDA-05-68, Revision 2, was reclassified by Westinghouse as non-proprietary, previous revisions of CN-RCDA-05-68, including Revision 1, also contain no proprietary information and may be released for public disclosure by the NRC.
This letter contains no new commitments and no revisions to existing commitments.
I declare under penalty of perjury that the foregoing is true and correct. Executed on September 1, 2005.
Dennis L. Koehl Site Vice-President, Point Beach Nuclear Plant Nuclear Management Company, LLC 6590 Nuclear Road
- Two Rivers, Wisconsin 54241 Telephone: 920.755.2321
OD
Document Control Desk Page 2 cc:
Project Manager, Point Beach Nuclear Plant, USNRC Regional Administrator, Region IIl, USNRC Resident Inspector, Point Beach Nuclear Plant, USNRC