NRC-92-0055, Monthly Operating Rept for April 1992 for Fermi 2
| ML20096E050 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 04/30/1992 |
| From: | Orser W, Stone B DETROIT EDISON CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| CON-NRC-92-0055, CON-NRC-92-55 NUDOCS 9205190041 | |
| Download: ML20096E050 (4) | |
Text
.
)
Ul,l*M, l'L -t
. v.y Detroit u-Eclison is!BF" Reg Cuide i.is ut.
May 15, 1992 NRC-92-0055 U. S. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.C.
20555
)
i
Reference:
Fermi 2 i
NRC Docket No. 50-341 NRC Operating License No. NPF-43 Subject; Honthly Operating Status Report for April, j
1992 i
Enclosed for your information and use is the Fermi 2 Honthly Operating Status Report for April, 1992. This report includes the Operatint; Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Sperification 6.9 1.6.
If you have any questions, please contact Brian Stone, at (313) 536-5148.
Sincerely, f)
Enclosure cc:
T. G. Colburn A. B. Davis D. R. Hahn H. P. Phillips S.
Stasek 3
P. L. Torpey
- 1),
,annso 9205190041-920430
[
OPERATING DATA REPORT DOCKET NO.
50-341 COMPLETED BY B. J. Stone DATE May 15, 1992 TELEPHONE (313) 586-5148 OPERATING STATUJ 1.
UNIT NAME:
Fermi 2, __ _
l Notes (1) Calculated using l
P.
REPORTING PERIOD: April,1372 l weighted av3 rages to reflect l
3 LICENSED THERMAL POWER (HWt),. 3293 l variations in MDC.
I 4.
NAMEPLATE RATING (GROSS MWe):
1854 l-l 5.
DESIGN ELECT RATING (Net MWe) _JQ23 l
l 6.
MAX DEPENDABLE CAP (GROSS MWe):1110 l
l 7.
MAX DEPENDABLE CAP (Net MWe):1060 l
,j, 8.
IF CilANGES OCCUR IN CAPACITY RATINGS (ITEMS-NUMBER 3 TilROUGil 7)_ SINCE LAST REPORT, GIVE REASONS: N/A 9.
POWER LEVEL TO WilICll RESTRICTED, IF ANY (MWe Net):
N/A
- 10. REASONS FOR RESTRICTION, IF / Y:
Tills MONTil YR TO DATE CUMULATIVE
- 11. IIRS IN REPORTING PER10D 719 2,903-37,429
- 12. HRS REACTOR WAS CRITICAL 649.1 2,797.2 28,060 9
- 13. REACTOR RESERVE SHUTDOWN HRS 0
0 0
1
- 14. Il0VR' GENERATOR ON-LINE 626.2 2,764.6 26,791.4
- 15. UNIT RESERVE SIIUTDOWN HOURS 0
0-0
- 16. GROSS TilERMAL ENERGY GEN (MWil) 2,018,808
__8,967,312 80.448,503.4
- 17. GROSS ELECT. ENERGY GEN (MW11) 691,840 3,078,140 26,726,177
- 18. NET ELECT ENERGY GEN (MWH) 662,198 2,956,023__ 25,548,259
- 19. UNIT SERVICE FACTOR 87.1 95.2 71.6
- 20. UNIT AVAILABILITY FACTOR 87.1 95.2 71.6
- 22. UNIT CAP FACTOR (USING DER NET) 84.3 93.2 62.5
- 23. UNIT FORCED OUTAGE RATE 12.9-4.8 8.7
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6' MONTHS (TYPE, DATE,. DURATION OF EACil):
Refueling: Starts September 12, 1992: Duration 50 days.-
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A
-3 COMMERCIAL OPERATION N/A N/A
cVERAGE DAILY UNIT POWEH LEVEL DOCKET NO.
50-341 UNIT FERMI 2 DATE Hay 15. 1992 COMPLETED BY E. Dawson TELEPHONE (313) 586-5027 Honth April, 1992 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEI.
(HWe-Net)
(HWe-Net) 1 1091 17 1087 2
1094 18 1081___
3 1091 19 1083 4
1091 20 1074 5
1092 21 1069 6
1088 22 1081 7
1008 23 1083 8
0 24 1082 9
0 25 1085 __
10 0
26 1084 11
'48 27 1084 l
~
12 670 28 1088 13 1096 29 1080 It!
1095 30 1081 1
15 1091 31 N/A l
l 16 1079
19
<e UNIT SHUTDOWNS AND PCwER REDUCTIONS DOCAET NO.
50-341 DATE rav 15. 1992 UNIT NAMI Fermi 2 COMPLETED BV B.
J.
Ston.
T E'.E PHON E (3t3) 586-51A8 REPORT MONTH Aprit. 1992 1
1 I
i 1
i j
i
.i j
l NETHOD OF j LER SYS COwp CAUSE & CORRECTIVE I
NO.
I DATE I TYPE DUR l REASOM l SHUTTING DOWN I NO.
CODE CODE ACTION TO pnEVENT f
l l (1)
(HRS)
(2)
THE DEACTOR i
(4) I (5) l RECURRENCE I
(6) i (3) l
(
l f
I I
i i
i 592-02 04/07/92 F
92.8 A
t l 92-003 NH VACB l During performance of a routine 1
l l
sueveillance on drywell and j
I I
suppression cha=cer vacuum breamer 8
{
l j
l operabi l i t y. a vacuum breater did
]
}
j l
l not close after being opeaed.
I-l l
(he vacuum breaker actuator
}
l l
l l
(utilizad during testing enly) l i
j l
j j
l I
bound in the cpen position.
l 1
1 I
i f
i f
(1) Fr FORCED (2) REASON:
(3) METHOD:
(4) EXHIBIT G - INSTRUCTIONS t - WANUAL FOR PREPARATION 08 DATA S: SCwEDULED A - EQUIPWENT FAILURE 'EXPLAINf B - WAINTENANCE OR TEST 2 - MANUAL SCRAW ENTRY SHEETS FCR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAW EVENT R F PORT (LER) F*LE D - REGULATORY RESTRICTION 4 - CONTINUED (NUREG-Otst)
E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F - ATMINISTRATIVE 9 - OTHER G.- ODERATIONAL ERROR (EXPLAIN)
M - OTHER (EXPLAIN)
(5) EXHIBIT 1 - SAME SOURCE (6) 4 - PREFIX INDICATES POWER REDUCTION.
5 - PREFIX INDICATES PLANT SHUTDOaN.
i I
1 J
.ma q