NRC-88-0010, Monthly Operating Rept for Dec 1987
| ML20147D895 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 12/31/1987 |
| From: | Anthony P, Orser W DETROIT EDISON CO. |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| CON-NRC-88-0010, CON-NRC-88-10 NUDOCS 8801200348 | |
| Download: ML20147D895 (4) | |
Text
.
OPERATING DATA REPORT DOCKET NO.
50-341 COMPLETED BY P. M. Anthony DATE January 15, 1988 TELEPHONE M )586-1617 OPERATING STATl]
1.
UNIT NAME:
Fermi 2 l Notes i
2.
REPORTING PERIOD: December, 1987 l
l 3
LICENSED THERMAL POWER (MWt):
3292 I *To be deternined i
4.
NAMEPLATE RATING (GROSS MWe):
1154 l
l S.
DESIGN ELECT RATING (Net MWe): 1093 I
I 6.
MAX DEPENDABLE CAP (GROSS MWe):
l l
7 MAX DEPENDABLE CAP (Net MWE):
l l
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: None 9
POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):
819.7
- 10. REASONS FOR RESTRICTION, IF ANY: Fermi 2 is in the startup test phase and is currently authorized to operate at power levels below 75% of rated th_ernal power.
THIS MONTH YR TO DATE CUMULATIVE
- 11. HRS IN REPORTING PERIOD 744 8760 24384
- 12. HRS REACTOR WAS CRITICAL 738.9 5147 5 6017.3
- 13. REACTOR RESERVE SHUTDOWN HRS 0
0 0
- 14. HOURS GENERATOR ON-LINE 738.9 4084.2 4213 7
- 15. UNIT RESERVE SHUTDOWN HOURS 0
0 0
- 16. GROSS THrRMAL ENERGY GEN (MWH) 1,515,768 5,988,912 6,212,160
- 17. GROSS ELECT ENERGY GEN (MWH) 479,050 1,573,593_
1,584,043
- 18. NET ELECT ENERGY GEN (MWH) 452,683 1,547,226 1,366,842
- 19. UNIT SERVICE FACTOR N/A N/A N/A
- 20. UNIT AVAILABILITY FACTOR N/A N/A N/A
N/A N/A N/A
- 22. UNIT CAP FACTOR (USING DER NET)
N/A N/A N/A
- 23. UNIT FORCED OUTAGE RATE N/A N/A N/A
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURAT JN OF EAC.J There is a LLRT outage scheduled for March 1988. The outage will last forty five days.
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
N/A
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CBITICALITY 06/20/85 06/21/85 INITIAL ELECTRIC!TY 10/01/86 09/21/86 COMMERCIAL OPERATION
-} t l' Af 8801200348 871231 PDR ADOCK 05000341
'lt R
~*
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-341 UNIT FERMI 2 DATE January 15, 1988 COMPLETED BY P. M. Anthony TELEPHONE (313) 586-1617 Nonth December, 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGP DAILY POWER LEVEL (NWe-Net)
(MWe-Net) 1 441 17 710 2
441 18 697
+
3 444 19 688 4
433 20 737 5'
438 21 718 6
442 22 760 7
441 23 541 8
432 24 583 i
9 512 25 722 I
10 626 26 711 4
11 594 27 779 12 551 28 752 13 567 29 706 14 608 30 747 15 691 31 779 16 691 1
[
i i
UNIT SPCJ1 DOWNS AND POWEN NEDUCIIONS DOCMET NO.
50-341 DATE January 15, l'387 UNIT NAME Feret 2 COMPLETED By P.
M.
Anthony TELEPHONE (313)S66-1617 REPORT MONTH December 1987 I
i i
I I
I i
l I
I i
l I
l l
l METHOD OF l
LER l Sv5 l COMP l
CAUSE & CORRECTIVE I
l NO.
l DATE l TYPE !
OUR l REASON l SMUTTING DOWN l NO.
1 CODE l CODE l
ACTION TO PREVENT l
l l
l (1) l (HRS)]
(2) l THE REACTOR l
l (4) l (5) l RECURRENCE l
1 i
i I
l l
(3) l 1
l l
1 i
l l
l l
1 I
i I
1 1
I I
I I
I I
I
! 87-18 l 12/31/87 l F
l 5.13 l G
l 3
187-056 l SJ l FIT During the Installation of a l
1 l
l l
l l
l l
l Temporary modification. a lead I
8 j
j
[
]
l l
l
[
l l grounded in error caused a false l
l l
l l
l l
l l
l l demand signal for Increased Fecd-1 l
l l
l l
l l
l l
l water flow.
This resulted in m
[
]
l l
l l
l l
l l High Reactor Water Level. Turbine l
l g
l l
l l
l l
l Control valve Fast Closure and l
l 1
l l
l l
l l Reactor Trip.
The Persunnel i
l l
l l
l l
l l
l l involvwo.wre counseled.
{
1 I
I I
1 1
I l
__l (1) F: FORCED (2) REASON:
( 3 ) METHOD:
(4) ENHIBIT G-INSTRUCTIONS S: SCHEDULED A - EQUIPMENT FAILURE fEXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE CR TES:
2 - MANUAL SCRAM ENTRV SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER) FILE D - REGULATORY RESTRICTION 4 - CONTINUED (NUREG-0161)
E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE 9 - OTMER G.- OPERATIONAL ERROR (EMPLAIN)
H - OTHER (EXPLAIN)
(5) EXHIBIT 1 - SAME SOURCE 9
O
4-E'uMm S. OrSee Ec*da'IEf$xni Re. ouide 1.16 v.:
Detrol,t
~~
r.,m ea30 Nar*h Due H,gh*ay Nuclear IVO lQ Ne port. M.cnigan 491f4 Operatsons P 3 566'53*
January 15, 1998 NCC-88-0010 S.
Nuclear Regulatory Commission
<ttention:
Document Control Desk Washington, D.C.
20555
Reference:
Fermi 2 NRC Dochet No.
50-341 NRC Jperating License Nu.
Subject:
Monthly Operating. Status Report f,o r %e,ceber. 1987 Enclosed for your information and use is the Termi 2 Honthly Operating Status Report for December, 1987.
This report Ircludee the Operating Data Report, A*/ e r a g e Dr. il y Unit Power Level, and ti Summary of Unit 3butdowos and Power Reductions identitied in NRC Regulatory Guide 1.16 and Fermi 2 Technical S pec if ic a tio n 6. 9.1. 6 If you have any questions, please contact Patricia Anthony at (313) 586-1617.
Sincerely)
' fuW W.
S.
Orser Vice President Nuclear Operations Enclosure cc A.
B.
Davie J.
R.
Eckert E.
G.
Greenman D.
R.
Hahn W.
G.
Rogers J.
J.
Stefano f,
II
.