OPERATING DATA REPORT DOCKET NO.

50-341 COMPLETED BY P. M. Anthony DATE January 15, 1988 TELEPHONE M )586-1617 OPERATING STATl]

1.

UNIT NAME:

Fermi 2 l Notes i

2.

REPORTING PERIOD: December, 1987 l

l 3

LICENSED THERMAL POWER (MWt):

3292 I *To be deternined i

4.

NAMEPLATE RATING (GROSS MWe):

1154 l

l S.

DESIGN ELECT RATING (Net MWe): 1093 I

I 6.

MAX DEPENDABLE CAP (GROSS MWe):

l l

7 MAX DEPENDABLE CAP (Net MWE):

l l

8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: None 9

POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):

819.7

10. REASONS FOR RESTRICTION, IF ANY: Fermi 2 is in the startup test phase and is currently authorized to operate at power levels below 75% of rated th_ernal power.

THIS MONTH YR TO DATE CUMULATIVE

11. HRS IN REPORTING PERIOD 744 8760 24384
12. HRS REACTOR WAS CRITICAL 738.9 5147 5 6017.3
13. REACTOR RESERVE SHUTDOWN HRS 0

0 0

14. HOURS GENERATOR ON-LINE 738.9 4084.2 4213 7
15. UNIT RESERVE SHUTDOWN HOURS 0

0 0

16. GROSS THrRMAL ENERGY GEN (MWH) 1,515,768 5,988,912 6,212,160
17. GROSS ELECT ENERGY GEN (MWH) 479,050 1,573,593_

1,584,043

18. NET ELECT ENERGY GEN (MWH) 452,683 1,547,226 1,366,842
19. UNIT SERVICE FACTOR N/A N/A N/A
20. UNIT AVAILABILITY FACTOR N/A N/A N/A
21. UNIT CAP FACTOR (USING MDC NET)

N/A N/A N/A

22. UNIT CAP FACTOR (USING DER NET)

N/A N/A N/A

23. UNIT FORCED OUTAGE RATE N/A N/A N/A
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURAT JN OF EAC.J There is a LLRT outage scheduled for March 1988. The outage will last forty five days.
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

N/A

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CBITICALITY 06/20/85 06/21/85 INITIAL ELECTRIC!TY 10/01/86 09/21/86 COMMERCIAL OPERATION

-} t l' Af 8801200348 871231 PDR ADOCK 05000341

'lt R

DCD

~*

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-341 UNIT FERMI 2 DATE January 15, 1988 COMPLETED BY P. M. Anthony TELEPHONE (313) 586-1617 Nonth December, 1987 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGP DAILY POWER LEVEL (NWe-Net)

(MWe-Net) 1 441 17 710 2

441 18 697

+

3 444 19 688 4

433 20 737 5'

438 21 718 6

442 22 760 7

441 23 541 8

432 24 583 i

9 512 25 722 I

10 626 26 711 4

11 594 27 779 12 551 28 752 13 567 29 706 14 608 30 747 15 691 31 779 16 691 1

[

i i

UNIT SPCJ1 DOWNS AND POWEN NEDUCIIONS DOCMET NO.

50-341 DATE January 15, l'387 UNIT NAME Feret 2 COMPLETED By P.

M.

Anthony TELEPHONE (313)S66-1617 REPORT MONTH December 1987 I

i i

I I

I i

l I

I i

l I

l l

l METHOD OF l

LER l Sv5 l COMP l

CAUSE & CORRECTIVE I

l NO.

l DATE l TYPE !

OUR l REASON l SMUTTING DOWN l NO.

1 CODE l CODE l

ACTION TO PREVENT l

l l

l (1) l (HRS)]

(2) l THE REACTOR l

l (4) l (5) l RECURRENCE l

1 i

i I

l l

(3) l 1

l l

1 i

l l

l l

1 I

i I

1 1

I I

I I

I I

I

! 87-18 l 12/31/87 l F

l 5.13 l G

l 3

187-056 l SJ l FIT During the Installation of a l

1 l

l l

l l

l l

l Temporary modification. a lead I

8 j

j

[

]

l l

l

[

l l grounded in error caused a false l

l l

l l

l l

l l

l l demand signal for Increased Fecd-1 l

l l

l l

l l

l l

l water flow.

This resulted in m

[

]

l l

l l

l l

l l High Reactor Water Level. Turbine l

l g

l l

l l

l l

l Control valve Fast Closure and l

l 1

l l

l l

l l Reactor Trip.

The Persunnel i

l l

l l

l l

l l

l l involvwo.wre counseled.

{

1 I

I I

1 1

I l

__l (1) F: FORCED (2) REASON:

( 3 ) METHOD:

(4) ENHIBIT G-INSTRUCTIONS S: SCHEDULED A - EQUIPMENT FAILURE fEXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE CR TES:

2 - MANUAL SCRAM ENTRV SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER) FILE D - REGULATORY RESTRICTION 4 - CONTINUED (NUREG-0161)

E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE 9 - OTMER G.- OPERATIONAL ERROR (EMPLAIN)

H - OTHER (EXPLAIN)

(5) EXHIBIT 1 - SAME SOURCE 9

O

4-E'uMm S. OrSee Ec*da'IEf$xni Re. ouide 1.16 v.:

Detrol,t

~~

r.,m ea30 Nar*h Due H,gh*ay Nuclear IVO lQ Ne port. M.cnigan 491f4 Operatsons P 3 566'53*

January 15, 1998 NCC-88-0010 S.

Nuclear Regulatory Commission

<ttention:

Document Control Desk Washington, D.C.

20555

Reference:

Fermi 2 NRC Dochet No.

50-341 NRC Jperating License Nu.

NPF-43

Subject:

Monthly Operating. Status Report f,o r %e,ceber. 1987 Enclosed for your information and use is the Termi 2 Honthly Operating Status Report for December, 1987.

This report Ircludee the Operating Data Report, A*/ e r a g e Dr. il y Unit Power Level, and ti Summary of Unit 3butdowos and Power Reductions identitied in NRC Regulatory Guide 1.16 and Fermi 2 Technical S pec if ic a tio n 6. 9.1. 6 If you have any questions, please contact Patricia Anthony at (313) 586-1617.

Sincerely)

' fuW W.

S.

Orser Vice President Nuclear Operations Enclosure cc A.

B.

Davie J.

R.

Eckert E.

G.

Greenman D.

R.

Hahn W.

G.

Rogers J.

J.

Stefano f,

II

.