Keith J. Poison Senior Vice President and CNO DTE Energy Company 6400 N. Dixie Highway, Newport, MI 48166 Tel: 734.586. 6515 Fax: 734.586. 1431 Email: keith.polson@dteenergy.com DTE Energy RIS 2018-02 May 15, 2018 NRC-18-0031 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, DC 20555-0001
Reference:
Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
Subject:
Preparation and Scheduling of Operator Licensing Examinations Attached is a completed NRC Form 536 for Fermi 2. This form is being submitted in response to NRC Regulatory Issue Summary 2018-02, "Preparation and Scheduling of Operator Licensing Examinations," and represents the updated plan for operator licensing needs for 2020 - 2023. As there is no current data for examinations in 2023, the field is left blank. Fermi 2 will support Region III to levelize examiner workload and provide mutually agreeable exam schedules through 2023. Fermi 2 intends to prepare all license operator examinations during this period.
No new commitments are made in this letter.
Should you have any questions, please contact Mr. Bryan Crone, General Supervisor
- Operations Training, at 734-586-4173.
Sincerely, KeitoV Pesn Senior Vice President and CNO
USNRC NRC-18-0031 Page 2
Enclosure:
NRC Form 536, "Operator Licensing Examination Data" cc:
NRC Project Manager NRC Regional Administrator, Region III NRC Resident Office Reactor Projects Chief, Branch 5, Region III Michigan Public Service Commission Regulated Energy Division (kindschl@michigan.gov)
Enclosure to NRC-18-0031 Fermi 2 NRC Docket No. 50-341 Operating License No. NPF-43 NRC Form 536 Operator Licensing Examination Data
NRC FORM 536 U. S. NUCLEAR REGULATORY COMMISSION APPROVED BY OMB: NO. 3150-0131 EXPIRES: 11/30/2020 (11-2017) acou Estimated burden per response to comply wilh this voluntary information collection request:
1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br />. This OPERATOR LICENSING information collection is used to plan budgets and resources for operator examinations.
Send comments regarding burden estimate to the Information Services Branch (T-2 F43), U.S. Nuclear EXAMINATION DATA Regulatory Commission, Washington, DC20555-0001, or by e-mail to infocollects.Resource@nrc.gov, and to the Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0131), Office of Management and Budget, Washington, DC 20503.
If a means used to impose an information collection does not display a currently valid OMB control number, the NRC may not conduct or sponsor, and a person is not required to respond to, the information collection.
FACILITY NRC REGION Fermi 2, NRC Docket No. 50-341 Rgo I
Region Ill NRC License No. NPF-43 A. PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY2019 CY 2020 CY 2022 CY ESTIMATED NUMBER OF LICENSEE-PREPARED 1
1 1
EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0
0 0
EXAMINATIONS B. INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSED NUMBER CY2019 CY 2020 CY 2022 CY NUMBER OF REACTOR 11 10 4
OPERATORS NUMBER OF SENIOR REACTOR 6
6 4
OPERATORS - INSTANT NUMBER OF SENIOR REACTOR OPERATORS - UPGRADE NUMBER OF SENIOR REACTOR 0
0 0
OPERATORS - LIMITED PROPOSED DATES PRIMARY DATE 6/17/2019 12/07/2020 06/06/2022 ALTERNATE DATE 6/24/2019 12/14/2020 06/13/2022 NRC FORM 536 (11-2017)