Decision to Attend Regulatory Conference for NRC Security Inspection Report No. 05000341/2010201: Preliminary Greater than Green Finding
ML103050132
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/29/2010
From: Plona J
Detroit Edison
To:
Office of Nuclear Reactor Regulation, Document Control Desk
References
EA-10-172, NRC-10-0076 IR-10-201
Download: ML103050132 (2)


Text

Joseph H. Plona Site Vice President 6400 N. Dixie Highway, Newport, MI 48166 Tel: 734.586.5910 Pax: 734,586.4172 DTE Energy*

EA-10-172 October 29, 2010 NRC-10-0076 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555-0001

References:

1) Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43
2) NRC Letter to Detroit Edison, "Fermi Nuclear Plant NRC Security Inspection Report No. 05000341/2010201:

Preliminary Greater Than Green Finding," dated October 15, 2010

Subject:

Decision to Attend Regulatory Conference for NRC Security Inspection Report No. 05000341/2010201: Preliminary Greater Than Green Finding On October 15, 2010, the NRC issued the Fermi Nuclear Plant - NRC Security Inspection Report No. 05000341/2010201: Preliminary Greater Than Green Finding.

The inspection report documents a potentially greater than green finding associated with a security baseline inspection. The inspection report cover letter offered Detroit Edison the opportunity to request a Regulatory Conference on the matter, and on October 25, 2010, Detroit Edison officially informed Mr. Barry Westreich of our intention.

This letter provides follow-up notification that Detroit Edison plans to attend a regulatory conference with the final date to be negotiated between Detroit Edison and the NRC. Detroit Edison requests the regulatory conference be held at the Office of Nuclear Security and Incident Response (NSIR) at Two White Flint Towers. As requested, supporting documentation will be provided approximately one week prior to the conference.

USNRC NRC-10-0076 Page 2 We look forward to continuing our dialogue on these issues. Should you have any questions or require additional information, please contact Mr. Rodney W. Johnson of my staff at (734) 586-5076.

Sincerely, cc:

NRC Project Manager NRC Resident Office Reactor Projects Chief, Branch 4, Region III Regional Administrator, Region III Supervisor, Electric Operators, Michigan Public Service Commission