NRC-04-0016, February 2004 Monthly Operating Report for Fermi 2

From kanterella
Jump to navigation Jump to search
February 2004 Monthly Operating Report for Fermi 2
ML040760517
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/08/2004
From: Peterson N
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, NRC-04-0016
Download: ML040760517 (2)


Text

Fermi 2 6400 North Dixie Hwy., Newport, Ni 48166 Detroit Edison Generic Letter 97-02 March 8, 2004 NRC-04-0016 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for February 2004 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for February 2004. This report includes the Operating Data Report and Summary of Unit Shutdowns identified in NRC Generic Letter 97-02 and Fermi 2 Technical Specification 5.6.4.

Should you have any questions or require additional information, please contact me at (734) 586-4258.

rman K. Peterson Manager - Nuclear Licensing Enclosure cc: R. J. Aben, Jr.

H. K. Chernoff M. A. Ring M. V. Yudasz, Jr.

NRC Resident Office Regional Administrator, Region mH Region Im

iii r 2A A DTE Energy Company

OPERATING DATA REPORT DOCKET NO. 50-341 UNIT NAME Ferni 2 DATE March 8. 2004 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 REPORTING PERIOD: FebruarM 2004

1. Design Electrical Rating (MWe-Net) 1,150.0
2. Maximum Dependable Capacity (Mwe-Net) 1,089.

This Month Year-to-Date Cumulative

3. Number of Hours the Reactor Was Critical 696 1,440 109,336
4. Number of Hours Generator On-line 696 1,440 105,449
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWH) 780.998 1,587,623 106,211,190 UNIT SHUTDOWNS

SUMMARY

Plant operated at full power (excluding small reactor power reductions for required surveillance testing) for the month of February 2004.

(1) Reason: (2) Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training and License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Text

Fermi 2 6400 North Dixie Hwy., Newport, Ni 48166 Detroit Edison Generic Letter 97-02 March 8, 2004 NRC-04-0016 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for February 2004 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for February 2004. This report includes the Operating Data Report and Summary of Unit Shutdowns identified in NRC Generic Letter 97-02 and Fermi 2 Technical Specification 5.6.4.

Should you have any questions or require additional information, please contact me at (734) 586-4258.

rman K. Peterson Manager - Nuclear Licensing Enclosure cc: R. J. Aben, Jr.

H. K. Chernoff M. A. Ring M. V. Yudasz, Jr.

NRC Resident Office Regional Administrator, Region mH Region Im

iii r 2A A DTE Energy Company

OPERATING DATA REPORT DOCKET NO. 50-341 UNIT NAME Ferni 2 DATE March 8. 2004 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 REPORTING PERIOD: FebruarM 2004

1. Design Electrical Rating (MWe-Net) 1,150.0
2. Maximum Dependable Capacity (Mwe-Net) 1,089.

This Month Year-to-Date Cumulative

3. Number of Hours the Reactor Was Critical 696 1,440 109,336
4. Number of Hours Generator On-line 696 1,440 105,449
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWH) 780.998 1,587,623 106,211,190 UNIT SHUTDOWNS

SUMMARY

Plant operated at full power (excluding small reactor power reductions for required surveillance testing) for the month of February 2004.

(1) Reason: (2) Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training and License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)