NRC-04-0016, February 2004 Monthly Operating Report for Fermi 2
| ML040760517 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 03/08/2004 |
| From: | Peterson N Detroit Edison |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002, NRC-04-0016 | |
| Download: ML040760517 (2) | |
Text
Fermi 2 6400 North Dixie Hwy., Newport, Ni 48166 Detroit Edison Generic Letter 97-02 March 8, 2004 NRC-04-0016 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555
Reference:
Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43
Subject:
Monthly Operating Status Report for February 2004 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for February 2004. This report includes the Operating Data Report and Summary of Unit Shutdowns identified in NRC Generic Letter 97-02 and Fermi 2 Technical Specification 5.6.4.
Should you have any questions or require additional information, please contact me at (734) 586-4258.
rman K. Peterson Manager - Nuclear Licensing Enclosure cc: R. J. Aben, Jr.
H. K. Chernoff M. A. Ring M. V. Yudasz, Jr.
NRC Resident Office Regional Administrator, Region mH Region Im
- iii r 2A A DTE Energy Company
OPERATING DATA REPORT DOCKET NO. 50-341 UNIT NAME Ferni 2 DATE March 8. 2004 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 REPORTING PERIOD: FebruarM 2004
- 1. Design Electrical Rating (MWe-Net) 1,150.0
- 2. Maximum Dependable Capacity (Mwe-Net) 1,089.
This Month Year-to-Date Cumulative
- 3. Number of Hours the Reactor Was Critical 696 1,440 109,336
- 4. Number of Hours Generator On-line 696 1,440 105,449
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical Energy Generated (MWH) 780.998 1,587,623 106,211,190 UNIT SHUTDOWNS
SUMMARY
- Plant operated at full power (excluding small reactor power reductions for required surveillance testing) for the month of February 2004.
(1) Reason: (2) Method:
A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training and License Examination 5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)
Text
Fermi 2 6400 North Dixie Hwy., Newport, Ni 48166 Detroit Edison Generic Letter 97-02 March 8, 2004 NRC-04-0016 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555
Reference:
Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43
Subject:
Monthly Operating Status Report for February 2004 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for February 2004. This report includes the Operating Data Report and Summary of Unit Shutdowns identified in NRC Generic Letter 97-02 and Fermi 2 Technical Specification 5.6.4.
Should you have any questions or require additional information, please contact me at (734) 586-4258.
rman K. Peterson Manager - Nuclear Licensing Enclosure cc: R. J. Aben, Jr.
H. K. Chernoff M. A. Ring M. V. Yudasz, Jr.
NRC Resident Office Regional Administrator, Region mH Region Im
- iii r 2A A DTE Energy Company
OPERATING DATA REPORT DOCKET NO. 50-341 UNIT NAME Ferni 2 DATE March 8. 2004 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 REPORTING PERIOD: FebruarM 2004
- 1. Design Electrical Rating (MWe-Net) 1,150.0
- 2. Maximum Dependable Capacity (Mwe-Net) 1,089.
This Month Year-to-Date Cumulative
- 3. Number of Hours the Reactor Was Critical 696 1,440 109,336
- 4. Number of Hours Generator On-line 696 1,440 105,449
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical Energy Generated (MWH) 780.998 1,587,623 106,211,190 UNIT SHUTDOWNS
SUMMARY
- Plant operated at full power (excluding small reactor power reductions for required surveillance testing) for the month of February 2004.
(1) Reason: (2) Method:
A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training and License Examination 5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)