NRC-03-0076, August 2003 Monthly Operating Report for Fermi 2
| ML032591095 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 09/08/2003 |
| From: | Peterson N Detroit Edison |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NRC-03-0076, RG-1.016 | |
| Download: ML032591095 (4) | |
Text
Fermi 2 6400 Norffi Dbde Hwy., Newport, MI 48166 Detroit Edison Reg. Guide 1.16 September 8, 2003 NRC-03-0076 U. S. Nuclear Regulatory Comnnission Attention: Document Control Desk Washington D C 20555
Reference:
Fermi 2 NRC Docket No. 50-341 NRC Operating license No. NPF-43
Subject:
Monthly Operating Status Report for August 2003 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for August 2003. This report includes the Operating Data Report, Average Daily Unit Power Level Data, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 5.6.4.
Should you have any questions or require additional information, please contact me at (734) 586-4258.
Sincerely, Norman K. Peterson Manager - Nuclear Licensing Enclosures cc: R. J. Aben, Jr.
H. KI Chernoff J. E. Dyer M. A. Ring M. V. Yudasz, Jr.
NRC Resident Office Region m A IYTE Energy Company
OPERATING DATA REPORT DOCKET NO. 50-341 DATE September 8. 2003 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 OPERATING STATUS
- 1. Unit name: Fermi 2
- 2.
Reporting period: August 2003
- 3.
Licensed thermal power (MWt): 3430
- 4.
Nameplate rating (Gross MWe): 1217
- 5.
Design elect rating (Net MWe): 1150
- 6.
Max dependable cap (Gross MWe): 1140
- 7.
Max dependable cap (Net MWe): 1089
- 8.
If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:
N/A
- 9.
Power level to which restricted, if any (MWe Net):
N/A
- 10.
Reasons for restrictions, if any:_
N/A THIS MONTH 11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
Hours in reporting period Hours reactor was critical Reactor reserve shutdown hours Hours generator on-line Unit reserve shutdown hours Gross thermal energy gen (MWH)
Gross elect energy gen (MWH)
Net elect energy gen (MWH)
Unit service factor Unit availability factor Unit cap factor (using MDC Net)
Unit cap factor (using DER Net)
Unit forced outage rate 744 641.8 0
614.5 0
-2.044.512 680.605 649.492 82.6%
- 82.6%
- 80.2%
75.9%
17.4%
YEAR TO DATE 5.831 4 780 0
0 15557.736 5.250.395 5.022.306 80.1%
80.1%
79.1%
74.9%
3.2%
CUMULATIVE 136.789 105.062 0
101.198 0
321.130.643 106.151.230 101.518.051 74.0%
74.0%
81.8% (1) 76.6% (1) 15.2%
- 24.
Shutdowns scheduled over next 6 months (Type, Date, Duration of each): N/A
- 25.
If shutdown at end of report period, estimated date of startup: N/A
- 26.
Units in test status (prior to commercial operation): N/A Notes: (1) Calculated using weighted averages to reflect variations in rating (MDC and DER) from initial commercial operation.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-341 UNIT Fermi 2 DATE September 8. 2003 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 Month August 2003 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER POWER LEVEL LEVEL (Moe-Net)
(MWe-Net) 1 1098 17 0
2 1102 18 0
3 1102 19 0
4 1105 20 297 5
1105 21 801 6
1102 22 1074 7
1102 23 1078 8
1101 24 1110 9
1106 25 1097 10 1106 26 1094 11 1104 27 1101 12 1101 28 1107 13 1100 29 1094 14 945 30 1113 15 0
31 1113 16 0
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:
UNIT NAME:
DATE:
50-341 Fermi 2 September 8. 2003 COMPLETED BY:
TELEPHONE:
Kevin Burke (734) 586-5148 REPORT MONTH August 2003 No. (6)
Date TYPE Dur (Hrs) (7)
Reason (2)
Method of LER Sys Code (4)
Comp Cause and Corrective Action to (1) shutting down No.
Code (5)
Prevent Recurrence reactor or reducing power (3)
S03-03 08/14/03 F
129.5 H
3 03-002 TB TG Automatic reactor scram on turbine control valve fast closure signal following a loss of offsite power due to regional transmission grid failure.
(1)
F: Forced S: Scheduled (2)
REASON:
A - Equipment Failure (Explain)
B -Maintenance or Test C - Refueling D - Regulatory Restriction E - Operations Training and License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
(3)
METHOD:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Reduced Load 9 - Other (4)
Instructions for preparation of data entry sheets for Licensee Event Report (LER) file (NUREG-1022)
(5)
Same Source as (4)
(6)
R - Prefix indicates power reduction.
S - Prefix indicated plant shutdown.
(7)
Duration of reductions reported as zero per Regulatory Guide 1.16, Revision 4.