Other: ML15327A213, ML16133A459, ML16133A499, ML16312A270, ML17207A165, ML17250A244, ML17256A286, ML18212A032, ML18212A181, ML18212A185, ML18212A188, ML18212A190, ML18212A194, ML18212A195, ML18213A104, ML18213A114, NL-16-138, Amendment 18 to License Renewal Application, NL-17-005, Actions Concerning License Renewal Commitments 41 and 42 in Response to LR-ISG-2016-01, Changes to Aging Management Guidance for Various Steam Generator Components, NL-17-019, Amendment to License Renewal Application - Reflecting Shortened License Renewal Terms, NL-17-020, License Renewal Application - Revisions to Reactor Vessel Internals Aging Management Program and Inspection Plan, NL-17-157, Amendment 19 to License Renewal Application (LRA)
|
MONTHYEARML15344A4362015-12-10010 December 2015 Lr Hearing - (External_Sender) Draft Audit Plan Edits Project stage: Request ML15327A2132015-12-21021 December 2015 Plan for the Regulatory Audit of the Service Water Integrity and Fire Water System Aging Management Programs Pertaining to the Indian Point Nuclear Generating Unit Nos. 2 and 3 LRA Project stage: Other ML15351A2032015-12-30030 December 2015 Summary of Conference Call Held on December 9, 2015, Between the NRC and Entergy Nuclear Operations, Inc. Concerning the Draft Audit Plan for the Service Water Integrity and Fire Water System Aging Management Programs Project stage: Draft Other 05000247/LER-2016-004, Re Unanalyzed Condition Due to Degraded Reactor Baffle-Former Bolts2016-05-31031 May 2016 Re Unanalyzed Condition Due to Degraded Reactor Baffle-Former Bolts Project stage: Request ML16133A4592016-06-15015 June 2016 Service Water and Fire Water Systems Aging Management Programs Audit Report for the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application Project stage: Other ML16133A4992016-06-21021 June 2016 Summary of Telephone Conference Call Held Between NRC and Entergy Concerning the Indian Point LRA Safety Review Project stage: Other ML16138A1942016-07-25025 July 2016 Request for Additional Information for the Review of License Renewal Application, Set 2016-01 Project stage: RAI ML16208A2772016-07-26026 July 2016 Lr Hearing - RAI Set 2016-01 Project stage: Request ML16312A2702016-11-0909 November 2016 Project Manager Change for the License Renewal of Indian Point Nuclear Generating Unit Nos. 2 and 3 Project stage: Other NL-16-122, Reply to Request for Additional Information for the Review of License Renewal Application, Set 2016-012016-12-0202 December 2016 Reply to Request for Additional Information for the Review of License Renewal Application, Set 2016-01 Project stage: Response to RAI NL-16-138, Amendment 18 to License Renewal Application2016-12-15015 December 2016 Amendment 18 to License Renewal Application Project stage: Other ML16350A4852016-12-15015 December 2016 Letter Enclosing Sipos Notice of Withdrawal Project stage: Request NL-17-005, Actions Concerning License Renewal Commitments 41 and 42 in Response to LR-ISG-2016-01, Changes to Aging Management Guidance for Various Steam Generator Components2017-01-17017 January 2017 Actions Concerning License Renewal Commitments 41 and 42 in Response to LR-ISG-2016-01, Changes to Aging Management Guidance for Various Steam Generator Components Project stage: Other NL-17-020, License Renewal Application - Revisions to Reactor Vessel Internals Aging Management Program and Inspection Plan2017-02-0606 February 2017 License Renewal Application - Revisions to Reactor Vessel Internals Aging Management Program and Inspection Plan Project stage: Other NL-17-019, Amendment to License Renewal Application - Reflecting Shortened License Renewal Terms2017-02-0808 February 2017 Amendment to License Renewal Application - Reflecting Shortened License Renewal Terms Project stage: Other ML17046A2312017-03-0808 March 2017 Request for Additional Information for the Review of the Indian Point License Renewal - Set 2017-01 Project stage: RAI ML17082A3112017-04-11011 April 2017 Summary of Clarification Call with Entergy Regarding Follow-Up RAIs on ISG-2012-02 Project stage: RAI ML17088A3272017-04-19019 April 2017 Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-02 Project stage: RAI ML17088A4052017-04-20020 April 2017 Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-3 Project stage: RAI ML17101A6972017-04-25025 April 2017 License Renewal Clarification Call on Baffle Bolt RAIs Project stage: Approval NL-17-052, Reply to Request for Additional Information for the Review of the License Renewal Application, Set 2017-012017-05-0808 May 2017 Reply to Request for Additional Information for the Review of the License Renewal Application, Set 2017-01 Project stage: Response to RAI NL-17-053, Reply to Request for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-032017-05-18018 May 2017 Reply to Request for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-03 Project stage: Response to RAI NL-17-060, Reply to Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-022017-05-19019 May 2017 Reply to Requests for Additional Information for the Review of the Indian Point License Renewal Application RAI Set 2017-02 Project stage: Response to RAI ML17128A3352017-05-23023 May 2017 Summary of Telephone Conference Call Between the NRC and Entergy Concerning RAIs Pertaining to IP2 and IP3 Project stage: RAI NL-17-061, Reply to Requests for Additional Information for the Review of the License Renewal Application RAI Set 2017-042017-05-24024 May 2017 Reply to Requests for Additional Information for the Review of the License Renewal Application RAI Set 2017-04 Project stage: Response to RAI NL-17-069, Reply to Requests for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application RAI Set 2017-052017-06-0808 June 2017 Reply to Requests for Additional Information for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3, License Renewal Application RAI Set 2017-05 Project stage: Response to RAI ML17170A2862017-06-27027 June 2017 RAI Set 2017-06 Project stage: RAI NL-17-074, Supplemental Information Regarding Reply to Request for Additional Information Set 2017-01 for the Review of the License Renewal Application (LRA)2017-06-27027 June 2017 Supplemental Information Regarding Reply to Request for Additional Information Set 2017-01 for the Review of the License Renewal Application (LRA) Project stage: Supplement ML17160A1652017-06-27027 June 2017 Summary of Telephone Conference Call Held on May 31,2017, Between the NRC and Entergy Nuclear Operations Inc. Concerning Requests for Additional Information Pertaining to the Indian Point, License Renewal Application (TAC Nos. MD5407/MD5408 Project stage: RAI NL-17-084, Reply to Requests for Additional Information for the Review of the License Renewal Application. Re RAI Set 2017-062017-07-27027 July 2017 Reply to Requests for Additional Information for the Review of the License Renewal Application. Re RAI Set 2017-06 Project stage: Response to RAI NL-17-092, Amended Response to Request for Additional Information Question RAI 3.3.2-17-IP3-1 Re License Renewal Application RAI Set 2017-052017-07-27027 July 2017 Amended Response to Request for Additional Information Question RAI 3.3.2-17-IP3-1 Re License Renewal Application RAI Set 2017-05 Project stage: Response to RAI ML17207A1652017-09-0101 September 2017 License Renewal Audit Plan Regarding the Service Water Integrity Program Project stage: Other ML17191A4562017-09-20020 September 2017 Telecon Summary Related to Indian Point License Renewal RAIs Associated with ISG-2016-01 Project stage: RAI ML17250A2442017-09-20020 September 2017 Audit Report for IP Swi - Aug 2017 Project stage: Other ML17180A5032017-09-21021 September 2017 Summary of Teleconference with Entergy Nuclear Operations, Inc., Concerning Request for Additional Information Pertaining to the Indian Point Unit Nos. 2 and 3 License Renewal Application Project stage: RAI ML17256A2862017-09-25025 September 2017 Summary of Telephone Call on 09/06/17, Between NRC and Entergy Concerning Next Steps from the Site Audit on 08/1-3/17 Project stage: Other NL-17-127, Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application (LRA)2017-11-0808 November 2017 Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application (LRA) Project stage: Supplement ML17298A5442017-11-13013 November 2017 Summary of Meeting with the National Marine Fisheries Service Related to Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Project stage: Meeting NL-17-155, Re-Submittal of Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application (LRA)2017-12-14014 December 2017 Re-Submittal of Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application (LRA) Project stage: Supplement NL-17-157, Amendment 19 to License Renewal Application (LRA)2017-12-14014 December 2017 Amendment 19 to License Renewal Application (LRA) Project stage: Other NL-17-161, Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Units 2 and 3 License Renewal Application (LRA)2017-12-21021 December 2017 Supplemental Information Regarding the Service Water Integrity Aging Management Program for the Review of the Indian Point Nuclear Generating Units 2 and 3 License Renewal Application (LRA) Project stage: Supplement NL-18-010, Supplemental Information Regarding the Review of the License Renewal Application2018-02-26026 February 2018 Supplemental Information Regarding the Review of the License Renewal Application Project stage: Supplement ML18107A7592018-04-30030 April 2018 NUREG-1437, Suppl. 38, Vol. 5, Generic Environmental Impact Statement for License Renewal of Nuclear Plants Supplement 38 Regarding Indian Port Nuclear Generating Unit Nos. 2 and 3 Final. Project stage: Acceptance Review NL-18-030, Supplemental Information Associated with Amendment 19 to the License Renewal Application (LRA)2018-05-0808 May 2018 Supplemental Information Associated with Amendment 19 to the License Renewal Application (LRA) Project stage: Supplement NL-18-044, Supplemental Information Regarding the Review of the License Renewal Application2018-06-25025 June 2018 Supplemental Information Regarding the Review of the License Renewal Application Project stage: Supplement ML18200A3332018-08-0101 August 2018 NUREG-1930, Supp 3, Safety Evaluation Report Related to the License Renewal of Indian Point Nuclear Generating Plant, Units 2 and 3. Project stage: Approval ML18211A5842018-09-17017 September 2018 Issuance of Renewed Facility Operating License Nos. DPR 26 and DPR-64 for Indian Point Nuclear Generating Unit Nos. 2 and 3 (CAC Nos. MD5407 and MD5408) Project stage: Request ML18212A0322018-09-17017 September 2018 Records of Decision for the Indian Point Renewed Licenses Project stage: Other ML18211A5962018-09-17017 September 2018 Transmittal Letter - Issuance of Renewed Facility Operating License Nos. DPR-26 and DPR-64 for Indian Point Nuclear Generating Unit Nos. 2 and 3 Project stage: Approval ML18211A5782018-09-17017 September 2018 Federal Register Notice - Announcing the Issuance of the Indian Point Renewed Licenses Project stage: Approval 2017-04-19
[Table View] |
Text
~Entergx Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, N.Y. 10511-0249 Tel (914) 254-6700 NL-18-044 June 25, 2018 Anthony J. Vitale Site Vice President U.S. Nuclear Regulatory Commission Document Control Desk 11545 Rockville Pike, TWFN-2F1 Rockville, MD 20852-2738
SUBJECT:
REFERENCES:
Dear Sir or Madam:
Supplemental Information Regarding the Review of the Indian Point Nuclear Generating Unit Nos. 2 and 3 License Renewal Application (LRA) (CAC Nos. MD5407 and MD5408)
Docket Nos. 50-247 and 50-286 Licenses Nos. DPR-26 and DPR-64
- 1)
- 2)
- 3)
Entergy Letter, "Reply to Request for Additional Information for the Review of the Indian Point License Renewal Application RAI SET 2017-03 (CAC Nos.
MD5407 and MD5408)," dated May 18, 2017 Entergy Letter, "Request for Additional Information for the Review of the Indian Point License Renewal Application RAI SET (CAC Nos. MD5407 and MD5408)," dated May 19, 2017 Entergy Letter, "Comments on Proposed Director's Decision for 1 O CFR 2.206 Petition on Indian Point Baffle Former Bolts Filed by the Union of Concerned Scientists Docket Nos. 50-247 and 50-286 (License Nos. DPR-26 and DPR-64)," dated February 09, 2017 By email date June 06, 2018, the Nuclear Regulatory Commission (NRC) identified "several questions" that needed answers to support completion of the license renewal application Safety Evaluation Report for Indian Point Nuclear Generating Unit Nos. 2 and 3 (Indian Point). The questions asked by the NRC and the Indian Point responses are included in Attachment 1 of this letter.
Entergy is making no new commitments in this letter. Should you have any questions regarding this matter, please contact Mr. Robert Walpole, Manager, Regulatory Assurance, Indian Point Energy Center at (914) 254-6710.
Sincerely,
~~~~==--=~~~~,~
~-
AJV/trj
Attachment:
- 1.
Response to email from NRC date June 06, 2018, Regarding the License Renewal Application - Safety Evaluation Report cc:
Mr. David Lew, Acting Regional Administrator, NRC Region I Mr. Sherwin E. Turk, NRC Office of General Counsel, Special Counsel Mr. William Burton, NRC Senior Project Manager, Division of License Renewal Mr. Richard V. Guzman, NRR Senior Project Manager Ms. Bridget Frymire, New York State Department of Public Service Ms. Alicia Barton, President and CEO NYSERDA NRC Resident Inspector's Office
-- --~------
ATTACHMENT 1 to NL-18-044 RESPONSE TO EMAIL FROM NRC DATE JUNE 06, 2018 REGARDING THE LICENSE RENEWAL APPLICATION - SAFETY EVALUATION REPORT ENTERGY NUCLEAR OPERATIONS, INC.
INDIAN POINT NUCLEAR GENERATING UNIT NOS. 2 & 3 DOCKET NOS. 50-247 AND 50-286
Docket Nos. 50-247 and 50-286 NL-18-044 Page 1 of 1 Response to email from NRC date June 06, 2018, Regarding the License Renewal Application - Safety Evaluation Report By email dated June 06, 2016, the NRC asked the following questions:
- 1. Question: By letter dated May 18, 2017, IPEC stated that it would implement an enhancement to the Bolting Integrity Program before May 31, 2018. Has this been done?
- a. Answer: Yes, we are in the implementation phase of this enhancement. A program has been developed and a number of potential opportunistic inspections selected.
- 2. Question: By letter dated May 19, 2017 IPEC identified an enhancement to the "detection of aging effects" program element in the Steam Generator Integrity program to revise applicable procedures to specify a general visual inspection of the steam generator channel head (Commitment No. 54), consistent with LR-ISG-2016-01, by December 31, 2017. Has this been done?
- a. Answer: Yes, the steam generator integrity program procedures have been revised to specify a general visual inspection of the steam generator channel head.
- 3. Question: By letter dated February 6, 2017, IPEC that the IP3 baffle-bolt inspections previously scheduled to be performed in 3R20 (spring 2019) will be performed in 3R19 (spring 2017). Visual and UT inspections on 100 percent of all accessible BFBs, and a visual inspection of the baffle-edge bolts and baffle-former assembly, will be performed in 3R19. Has this been done?
- a. Answer: The actual date of the letter was February 9, 2017. During the 3R19 we inspected all baffle bolts and replaced all of the bolts which either had flaws or could not be inspected. All baffle bolts were ir.ispected visually and with UT. All baffle bolts that had any indications of flaws were replaced as documented in EC 71081. All baffle bolt location contained either an existing baffle bolt that showed no indications of flaws OR were replaced with a new design. We also performed a visual inspection of the baffle-edge bolts and baffle-former assembly and no unacceptable indications were identified.