Fourth Ten-Year Interval Inservice Testing Program - RR-P-3
ML091811213
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 06/30/2009
From: Ajluni M
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-09-1047, RR-P-3
Download: ML091811213 (4)


Text

Southern Nuclear Operating Company, Inc.

Pust Oftice Bux 1295 fJlrlTllngharn, AlalJarrrd 35201-1 :'95 Tel L'05992 SOIJO June 30, 2009 SOUTHERN'\\.

COMPANY Ellugy 10 Serve Your World "

Docket Nos.: 50-348 NL-09-1047 50-364 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Fourth Ten-Year Intervallnservice Testing Program - RR-P-3 Ladies and Gentlemen:

In letter dated July 14, 2008, Southern Nuclear Operating Company (SNC) submitted a response to your request for additional information (RAI) regarding the Fourth Ten-Year Intervallnservice Testing Program Update. Included in the RAI response, SNC requested intern approval for RR-P-3 until July 1, 2009 to allow additional testing be performed for the motor-driven auxiliary feedwater pumps to determine if a substantial flow rate can be achieved for Interval Inservice Testing. SNC committed to test the motor-driven auxiliary feedwater pumps to determine if >50 gpm flow can be achieved and provide the results to the NRC prior to July 1,2009.

By letter dated August 6,2008, the NRC completed its review and provided a safety evaluation authorizing relief request RR-P-3 for an interim period until July 1, 2010 pursuant to 10 CFR 50.55a(a)(3)(ii) based on the determination that compliance with the specified ASME OM Code requirements results in hardship or unusual difficulty without a compensating increase in the level of quality and safety.

SNC is changing the original commitment date of prior to July 1, 2009 to September 1, 2009. SNC has determined that additional time is required to evaluate the possible affects of testing the motor-driven auxiliary feedwater pumps using the test line to get a flow greater than 50 gpm. This additional time is needed based on high vibrations experienced while testing of the turbine driven auxiliary feedwater pump test line that resulted in degradation of the piping. Relief request RR-P-3 is under consideration for withdrawal pending the outcome of this engineering evaluation.

U. S. Nuclear Regulatory Commission NL-09-1047 Page 2 This letter contains a NRC commitment. If you have any questions, please advise.

Sincerely, P'LJ" ~ or-~

M. J. Ajluni Manager, Nuclear Licensing MJAlJLS/phr

Enclosure:

Commitment Table cc:

Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. J. R. Johnson, Vice President - Farley Ms. P. M. Marino, Vice President - Engineering RTYPE: CFA04.054 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. R. E. Martin, NRR Project Manager - Farley Mr. E. L. Crowe, Senior Resident Inspector - Farley

Joseph M. Farley Nuclear Plant - Units 1 and 2 Enclosure Commitment Table

Enclosure Commitment Table Type Scheduled I

Commitment lOne-Time Continuing Completion Date Action Compliance Test MDAFW pumps to determine if >50 X

September 01, gpm flow can be achieved and provide the 2009 results to the NRC.

E - 1