NL-04-1302, Inservice Inspection Summary Report
| ML042330493 | |
| Person / Time | |
|---|---|
| Site: | Vogtle |
| Issue date: | 08/13/2004 |
| From: | Gasser J Southern Nuclear Operating Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NL-04-1302 | |
| Download: ML042330493 (96) | |
Text
Jeffrey T. Gasser Southern Nuclear Vice President Operating Company, Inc.
40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.7721 Fax 205.992.0403 S
SOUTHERNN August 13, 2004 COMPANY Eneruy to Serve Your Worid r
Docket No.:
50425 NL-04-1302 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant Inservice Inspection Summary Report Ladies and Gentlemen:
Southern Nuclear Operating Company (SNC) submits herewith the Vogtle Electric Generating Plant Unit 2, Interval 2, Period 2, Outage 2 Inservice Inspection Summary Report (Enclosure). This report describes and summarizes the inservice inspection activities performed during its spring 2004 maintenance/refueling outage. Paragraph INVA-6230 of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, 1989 Edition requires submittal of the enclosed report.
Also included in the report are inspection results required by Vogtle Electric Generating Plant Technical Specification 5.6.10.b for submittal to the NRC within 12 months following completion of the steam generator tube examinations.
The supporting inservice inspection documentation, e.g., examination plans and schedules, examination results and reports, examination methods and procedures, evaluation results, and corrective action and repairs, is available for review upon request at Vogtle Electric Generating Plant.
The signed original and one copy of the subject report are provided for your review.
This letter contains no NRC commitments. If you have any questions, please advise.
Sincerely, Jeffrey T. Gasser JTG/DRG
Enclosure:
Inservice Inspection Summary Report Vogtle Electric Generating Plant Unit 2 - Refueling Outage (2R 10)
U. S. Nuclear Regulatory Commission Log: NL-04-1302 Page 2 cc:
Southern Nuclear Operating Company Mr. J. B. Beasley, Jr., Executive Vice President Mr. W. F. Kitchens, General Manager - Plant Vogtle RType: CVC7000 U. S. Nuclear Regulatorv Commission Dr. W. D. Travers, Regional Administrator Mr. C. Gratton, NRR Project Manager - Vogtle Mr. G. J. McCoy, Senior Resident Inspector - Vogtle
Vogtle Electric Generating Plant Unit 2 Tenth Maintenance/Refueling Outage (2R10)
Owner's Report for Inservice Inspection Southern Nuclear Operating Company the southern electric system
OWNER'S REPORT FOR INSERVICE INSPECTIONS for the TENTH MAINTENANCE/REFUELING OUTAGE of VOGTLE ELECTRIC GENERATING PLANT, UNIT 2 (7821 River Road, P. 0. Box 1600, Waynesboro, Georgia 30830)
COMMERCIAL OPERATION DATE: May 20,1989 DOCUMENT COMPLETION DATE: August 2004 Prepared by SOUTHERN NUCLEAR OPERATING COMPANY (40 Inverness Center Parkway, P. 0. Box 1295, Birmingham, Alabama 35201) as LICENSEE AND OPERATING AGENT for GEORGIA POWER COMPANY (241 Ralph McGill Boulevard, N.E., P. 0. Box 4545, Atlanta, Georgia 30308-3374) as OWNER
TABLE OF CONTENTS Page Introduction 1-1 ASME Form NIS-I with Abstract-ASME Class I and 2 2-1 Class MC and CC Examinations and Tests (IWE/IWL) 3-1 Augmented Examinations (Steam Generators) 4-1 Examination Summary Listings Class I and 2 Weld Examinations 5-1 Class I and 2 Support Examinations 6-1 System Pressure Tests 7-1 Indication Notification Forms 8-1 NIS-2 Forms with Listing 9-1 i
LIST OF ABBREVIATIONS ACC AD AFW Al ANII ASME ASNT ASTM BC CCSS CCW CE CH CR CS CVCS DS ET EVAL FAC FB FNF FW FSAR GEO GPC HHSI HL HX HYD IEN IND INF
'SI IST ITS ID IR LB LD LD-I LD-O LMT LU LU-I LU-O MECH MS MT NCI NDE Acceptable Anchor/Darling Auxiliary Feedwater System GPC Action Item (followed by unique no. denoting Action Item number)
Authorized Nuclear Inservice Inspector American Society of Mechanical Engineers American Society for Nondestructive Testing American Society for Testing and Materials Branch Connection Centrifugally Cast Stainless Steel Component Cooling Water Combustion Engineering Closure Head Condition Report Containment Spray Chemical and Volume Control System Downstream Eddy Current Examination Evaluation Flow-Accelerated Corrosion (may also be referred to as "erosion/corrosion")
Flange Bolting FAC Notification Report Feedwater System VEGP Final Safety Analysis Report (includes updates thereto)
Geometric Indications Georgia Power Company High Head Safety Injection Hanger Lug Heat Exchanger Hydraulic Snubber NRC Information Notice (may also be shown as "IN" followed by unique no. denoting notice number)
Indication Indication Notification Form Inservice Inspection Inservice Testing VEGP Improved Technical Specification Inside Diameter Inside Radius Large Bore Longitudinal Seam Weld Extending Downstream Longitudinal Seam Weld Downstream Inside Radius of Elbow Longitudinal Seam Weld Downstream Outside Radius of Elbow Lambert, MacGill and Thomas Longitudinal Seam Weld Extending Upstream Longitudinal Seam Weld Upstream Inside Radius of Elbow Longitudinal Seam Weld Upstream Outside Radius of Elbow Mechanical Snubber Main Steam System Magnetic Particle Examination Nonconformance Item Nondestructive Examination ii
LIST OF ABBREVIATIONS - (continued)
'1~
NI NRC NRC-B NRI NSCW OR PL PM PR PROF PS PSA PSI PT RCS RCP RHR RI RLW RL RPV RR RWST SAT SB SCS v-Si SNC SUP T&C TDAFW UNSAT US UT VEGP VT W
No Indication United States Nuclear Regulatory Commission NRC Bulletin (followed by unique no. denoting Bulletin number)
No Recordable Indication Nuclear Service Cooling Water System Outside Radius Pipe Lug Paul-Munroe ENERTECH Pipe Restraint Profile Pipe Support Pacific Scientific Preservice Inspection Liquid Penetrant Examination Reactor Coolant System Reactor Coolant Pump Residual Heat Removal System Recordable Indication Refracted Longitudinal Wave Restraint Lug Reactor Pressure Vessel Relief Request (followed by unique no. denoting relief request number)
Refueling Water Storage Tank Satisfactory Examination Results Small Bore Southern Company Services Safety Injection System Southern Nuclear Operating Company Supplemental Data Thickness and Contour Turbine Driven Auxiliary Feedwater (Pump)
Unsatisfactory Examination Results Upstream Ultrasonic Examination Vogtle Electric Generating Plant (common unless followed by "-I" or "-2" to designate a specific plant unit)
Visual Examination Westinghouse iii
INTRODUCTION This report documents the examinations and tests performed at Vogtle Electric Generating Plant, Unit 2 (VEGP-2) between November I 1, 2002 (date of last examination performed during the ninth maintenance/refueling outage, 2R9) and May 16, 2004 (date of last examination performed during the tenth maintenance/refueling outage, 2R10) to meet the requirements of Article IWA-6000 of the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI, 1989 Edition (Code). In addition, a summary of the following augmented examinations are included in this report:
VEGP Technical Specification 5.5.9 - Steam Generator Tube Inspections This report also addresses Code-applicable repairs and/or replacements, which were documented since the last maintenance/refueling outage at VEGP-2 through the completion of the tenth maintenance/refueling outage in May 2004. The Owner's Reports for Repairs and Replacements (Form NIS-2) are included herein.
I-1
FORM NIS-I OWNER'S REPORT FOR INSERVICE INSPECTIONS As required by the Provisions of the ASME Code Rules
- 1. Owner:
Georgia Power Company, 241 Ralph McGill Blvd., N. E.
P. 0. Box 4545, Atlanta, Georgia 30308-3374
- 2.
Plant:
Vogtle Electric Generating Plant, 7821 River Road P. 0. Box 1600, Waynesboro, Georgia 30830
- 3.
Plant Unit: Two
- 4.
Owner Certification of Authorization: N/A
- 5.
Commercial Service Date: 05/20/89
- 6.
National Board Number for Unit: N/A
- 7.
Components Inspected:
Component or Manufacturer or Manufacturer or Installer State or Province National Board Appurtenance Installer and Address Serial Number Number Number Reactor Combustion Eng.
7372 N/A 22004 Pressure Vessel Inc.,
Chattanooga, TN Steam Westinghouse Elec.,
GBGT 1884 (77743),
N/A 36, Generators 1, 2, Pensacola, FL GBGT 1883 (77745),
35, 3 and 4 GBGT 1882 (77742),
34, GBGT 1881 (77744) 33 Reactor Coolant Westinghouse Elec.,
5-9744D35G01 N/A 37 Pump 4 Cheswick, PA Selected Piping, Pullman Power System Numbers 1201, 1202, N/A N/A Components,
- Products, 1204, 1205, 1208, 1301, and Supports Williamsport, PA 1305, & 1501.
2-1
FORM NIS-I (Back)
- 8. Examination Dates: November 11.2002 to May 16.2004
- 9.
Inspection Period Identification: Second Period
- 10.
Inspection Interval Identification: Second Inspection Interval
- 11.
Applicable Edition of Section Xl 1989 Addenda None
- 12.
Date/Revision of Inspection Plan: November 13, 2003 /Revision 7,
- 13.
Abstract of Examinations and Tests. Include a list of examinations and tests and a statement concerning status of work required for the Inspection Plan. (See Abstract and Examination Summary Listings)
- 14.
Abstract of Results of Examinations and Tests. (See Abstract)
- 15.
Abstract of Corrective Measures. (See Abstract)
We certify that a) the statements made in this report are correct, b) the examinations and tests meet the Inspection Plan as required by the ASME Code,Section XI, and c) corrective measures taken conform to the rules of the ASME Code,Section XI.
Certificate of Authorization No. (if applicable) N/A Expiration Date N/A Date:
2-20 0 Signed:
Southern Nuclear Operating By:
A.
Company. Inc. for Georgia Power Company Owner CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State of Georgia and employed by The Hartford Steam Boiler Inspection and Insurance Company of Connecticut of Hartford. CT have inspected the components described in this Owner's Report during the period November 11. 2002 to May 16. 2004, and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in this Owner's Report in accordance with the Inspection Plan and as required of the ASME Code,Section XI.
By signing this certificate neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations, tests, and corrective measures described in this Owner's Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
7_
A, Commission:
SA 2o0 InspecAr's Signature National Board, State, Province, and Endorsements Date:
09-4;-
2O2 2-2
ABSTRACT - ASME CLASS 1 AND 2 Introduction/Status The ASME Boiler and Pressure Vessel Code,Section XI, 1989 Edition (Code), is the applicable code for conducting inservice inspection activities during the second ten-year inspection interval at VEGP-2. Examinations and tests required by the Code are scheduled in accordance with "Inspection Program B" as defined in Code paragraphs IWB-2412 and IWC-24 12. This "Owner's Report for Inservice Inspection" is for those second inspection period examinations and tests which were performed between November 11, 2002 (date of last examination performed during the ninth maintenance/refueling outage, 2R9) and May 16, 2004 (date of last examination performed during the tenth maintenance/refueling outage, 2R10)
Risk Informed Program was approved by the NRC by letter dated September 30, 2003 and implemented during the VEGP 2R10 refueling outage (ASME Class I and Class 2 piping only).
By Federal Register Notice 64 FR 51370 dated September 22, 1999, 1 OCFR 50.55a(g)(6)(ii)(C), Implementation of Appendix VIII to Section XI, was incorporated into the rule to expedite implementation of Appendix V111. The specific Supplements of Appendix VIII to Section XI, ASME Boiler and Pressure Vessel Code, 1995 Edition with the 1996 Addenda were implemented prior to the 2R10 maintenance/refueling outage as required.
In addition to the summary of inservice inspection activities, this report addresses Code-applicable repairs and replacements documented at VEGP-2 since 2R9 through the end of 2R10. The Owner's Reports for Repairs or Replacements (Form NIS-2) are provided herein.
It should be noted that Authorized Nuclear Inservice Inspector (ANII) inspection services were provided for those examinations and tests required by the Code. ASME Section XI examinations and tests are itemized in the applicable sections by reference to Examination Category. Examinations which do not meet the Code-required coverage either reference request(s) for relief or indicate that additional relief is required.
Class I Examinations Selected Class I components were examined by Southern Nuclear Operating Company (SNC) personnel utilizing ultrasonic testing (UT), magnetic particle testing (MT), and visual testing (VT) methods, as applicable. Specific components and examination areas are itemized in the applicable portions of this document. A summary of those components examined are listed below:
Reactor Pressure Vessel (RPV) Closure Head and Interior Surfaces, Steam Generator Primary Nozzle Inner Radii, Channel Head Weld, and Manway Bolting, and Piping welds.
During the scope of VEGP-2 examinations conducted, no Class I components were observed to have either reportable UT, MT or VT indications.
In addition to components already identified in current requests for relief, two (2) piping welds had limited volumetric coverage during UT examinations because of physical limitations due to the geometric configuration of the welded areas. More than ninety percent (90%) of the required volume must be examined as addressed in ASME Section XI Code Case N-460 for adequate ASME Section XI Code-required examination coverage to be attained.
As noted herein, the subject code case has been approved by the NRC for use as documented in NRC Regulatory Guide 1.147. It is impractical to achieve the ASME Section XI Code-required coverage due to the geometric configuration of the welded areas. Relief from the ASME Section XI Code requirements will be requested from the NRC for the affected welds through the relief request process as allowed by 10 CFR 50.55a. The applicable welds are indicated by "Relief Required" in the combined Class I and 2 Weld Examination table.
2-3
The Eddy Current (ET) examinations of steam generator tubing, as required by VEGP Technical Specification 5.5.9, were performed by Westinghouse and are discussed in the "Augmented Inspections" portion of this document.
Class 1 Pressure Test Table IWB-2500-1, Examination Category B-P, of ASME Section XI requires the performance of a system leakage test (IWB-5221) each refueling outage. This system leakage test (LT-1) was performed prior to plant startup following the refueling outage. These visual examinations revealed minor boron residues at mechanical connections which were determined acceptable for continued system operation.
ASME Section XI, Subparagraph IWA-5242(a) requires removal of insulation from pressure-retaining bolted connections for VT-2 examination during system pressure testing for systems borated for the purposes of controlling reactivity. ASME Section XI Code Cases N-533-1 and N-616 were utilized during the refueling outage. These Code Cases were approved for use in Revision 13 of Regulatory Guide 1.147 dated June 2003. Case N-533-1 allows insulation to be removed while the connections are at atmospheric or static pressures. WVith the insulation removed a direct visual examination is performed to detect previously occurring leakage through the presence of boric acid crystals. Case N-616 allows the VT-2 examination to occur without insulation removal provided the bolting material is resistant to boric acid degradation.
The test boundary of the system leakage test includes both Class I and Class 2 components. The frequency for removal of insulation and direct visual examination for Class I pressure-retaining bolted connections is once each refueling outage (refer to Table INVB-2500-1, Examination Category B-P) and as such those activities occurred during the refueling outage. The Class 2 components comprise part of the reactor coolant pressure boundary but are not required to be classified as Class I per I OCFR50.55a(c)(2). The frequency for removal of insulation and direct visual examination for Class 2 pressure-retaining bolted connections is once each inspection period (refer to Table IWC-2500-1, Examination Category C-H). For the second inspection period those activities occurred either before or during the last refueling outage which was 2R9.
Class 2 Examinations Selected Class 2 components were examined utilizing UT and MT, as applicable. Specific components and examination areas are itemized in the applicable portions of this report document. A summary of those components examined are listed below:
Steam Generator Nozzle Welds, and Piping Welds.
During the scope of VEGP-2 examinations conducted, no Class 2 components were observed to have either reportable UT or MT indications.
In addition to components already identified in current requests for relief, one (I) equipment weld and four (4) piping welds had limited volumetric coverage during UT examinations because of physical limitations due to the geometric configuration of the welded areas. More than ninety percent (90%) of the required volume must be examined as addressed in ASME Section XI Code Case N-460 for adequate ASME Section XI Code-required examination coverage to be attained. As noted herein, the subject code case has been approved by the NRC for use as documented in NRC Regulatory Guide 1.147. It is impractical to achieve the ASME Section XI Code-required coverage due to the geometric configuration of the welded areas. Relief from the ASME Section XI Code requirements will be requested from the NRC for the affected welds through the relief request process as allowed by 10 CFR 50.55a. The applicable welds are indicated by "Relief Required" in the combined Class I and 2 Weld Examination table.
24
Class 2 Pressure Tests ASME Section Xl, Table IWC-2500-1, Examination Category C-H requires system pressure testing each inspection period. The specific system pressure tests performed are itemized in the "Pressure Tests" portion of this report document. The visual examinations performed during these system pressure tests found only minor boron residue or minor leakage at mechanical joints such as pump seals, flanged connections, and valve stem packing. These conditions were either corrected or evaluated and determined acceptable for continued system operation.
ASME Section Xl, Subparagraph IWA-5242(a) requires removal of insulation from pressure-retaining bolted connections for VT-2 examination during system pressure testing for systems borated for the purposes of controlling reactivity. ASME Section XI Code Cases N-533-1 and N-616 were utilized during the refueling outage. These Code Cases were approved for use in Revision 13 of Regulatory Guide 1.147 dated June 2003. Case N-533-1 allows insulation to be removed while the connections are at atmospheric or static pressures. With the insulation removed a direct visual examination is performed to detect previously occurring leakage through the presence of boric acid crystals. Case N-616 allows the VT-2 examination to occur without insulation removal provided the bolting material is resistant to boric acid degradation.
Class I and 2 Component Supports Visual examinations were performed on supports for the following Class I and 2 components:
Reactor Coolant System Equipment and Piping (1201),
Nuclear Service Cooling Water Piping (1202),
Safety Injection System Equipment and Piping (1204),
Chemical and Volume Control System Equipment and Piping (1208), and Containment Heat Removal System Piping (1501)
The visual examinations resulted in no supports having unacceptable conditions.
2-5
Class MC and CC Examinations and Tests (IWE/IWL)
During the VEGP-2 spring 2004 maintenance/refueling outage, examinations of Class MC components were performed in response to the NRC rulemaking to 10 CFR 50.55a, in which the requirements of Subarticles IWE and IWL to the 1992 Edition of the ASME Section XI with the 1992 Addenda were invoked. There were no degradations found meeting the reporting requirements for Class MC components described in 10 CFR 50.55a(b)(2)(ix)(A) or 10 CFR 50.55a(b)(2)(ix)(D)(1).
There were no examinations of Class CC components performed during the VEGP-2 spring 2004 maintenance/refueling outage.
3-1
Technical Specification 5.5.9 - Stcam Generator Tube Inspections NOTE The following discussion on the steam generator tubing inspections, in addition to-fulfilling the reporting requirements of ASME Section XI for Inservice Inspection activities, constitutes the report required by VEGP Technical Specification 5.6.10.b to be submitted to the NRC within twelve (12) months following completion of the steam generator tube inspections. Accordingly, a separate submittal is not being made to the NRC on the inspection of the steam generator tubes performed during the tenth maintenance/refueling outage (2R10) at VEGP-2.
Introduction During 2R10, the Steam Generator Maintenance Services Group of the Westinghouse Nuclear Services Division performed eddy current testing of two (2) Westinghouse Model F steam generators (SGs),
numbers 2 and 3, in parallel from April 19 to May 10,2004. At the start of 2Rl0 each generator had 5626 tubes with seven (7) plugged tubes in SG 2 and one (1) plugged tube in SG 3. The base inspection scope for SGs 2 and 3 follows:
- 100% full length bobbin (except for Rows I and 2, which are inspected from tube end to TSP#7 from both HL and CL).
- 50% Hot leg TTS, +/- 3", mid-range +Point examination of SGs 2 and 3
- 50% U-bend (Rows I and 2) +Point examination of SGs 2 and 3:
- Special interest +Point RPC examination of areas identified during the bobbin inspection.
- 100% of the dents and dings > 5 volts (by bobbin) in the hot leg side straight length areas with +Point examination
- Special interest +Point RPC examination of areas related possible loose parts.
- Visual inspection of tube plugs.
- +Point RPC examination of tube sample possibly subject to Phosphate Chemistry excursion damage In addition to the above 2R10 data collected, a review was performed of all 2R8 Bobbin data for SG 2 and 3 to look for an artifact that indicated susceptibility to SCC found at Seabrook. There were no similar indications found in the Vogtle Unit 2 Bobbin data for SGs 2 and 3. A review was also performed to identify any tubes with the Braidwood artifact. Only one tube exhibited the Braidwood artifact, however there were no potential ODSCC precursors signals reported and only 2 AVB scars were found (both less than 20%). This tube remains in service. In addition, no evidence of tube damage from the Phosphate Chemistry excursion was observed by RPC in the tubes selected.
This report satisfies the 12-month NRC report required by VEGP Technical Specification 5.6.10.b, in addition to fulfilling the ASME Section XI report for Inservice Inspection activities. Note that personnel qualifications, test equipment certifications, and calibration data are not in this report, but are contained in the Westinghouse Electric Company, Nuclear Service Division, Steam Generator Maintenance Services Field Service Report, MSR-FSR-1300-GBE. That report will be available at the plant site for review upon request.
Scone Expansion Several scope expansions were performed per EPRI Report 1003138, Pressurized Water Reactor Steam Generator Examination Guidelines, Table 3-2 due to discovery of outside diameter (OD) circumferential crack-like indications. Indications were initially identified in the transition area at the top of tubesheet in SG 2. Three OD circumferential crack-like indications were detected in SG 2 and three additional 4-1
indications in SG3. These indications were extensively inspected using RPC, slow speed RPC and magnetic bias RPC. Four of the six indications were confirmed with ultrasonic testing (reference WesDyne International UTEC Inspection Report SDI-JF-1302914-FSR-001). The scope expansions required by the Technical Specifications and Industry Guidelines resulted in the testing of 100% of the Hot Leg TTS, at i 3" with mid-range +Point in SGs I through 4, however none of the tubes identified with circumferential crack indications required the performance of in situ testing. In addition, two tubes were pulled in SG 2 (row Il /column 60 and 12/59) for laboratory testing due to the discovery of circumferential crack indications. These tubes were cut below the second support plate on the Hot Leg side. Welded plugs were installed on the Hot Leg and mechanical plugs were installed on the Cold Leg. The pulled tubes are currently being tested by Westinghouse with results to be available at a later date.
Tube Inspection Plan Steam generator tube inspections conducted during 2R10 met or exceeded the recommendations made in the EPRI report 1003138 -VI R6, "PWR Steam Generator Examination Guidelines", which were adopted by SNC for steam generator tube inspections. The VEGP inspection plan requires that 100% of the tube population be inspected from two steam generators each outage, except for rows I and 2 U-bends which are inspected in accordance with the RPC program. This inspection plan meets the requirements of 1003138-VIR6 and is required by site procedure 84002-C, "Steam Generator Inspections and Reports". As stated previously, the scope expansions also met the requirements of 1003138-V I R6.
The Eddy Current inspection program was conducted in accordance with Westinghouse Field Procedure MRS 2.4.2 GPC-3 Rev. 11, "Eddy Current Inspection of Preservice and Inservice Heat Exchanger Tubing."
Inspection probes used were in accordance with Probe Authorization, Revision 1. The test configurations and acquisition rates were in accordance with the Eddy Current Acquisition Technique Sheets (ACTS).
Data Evaluation Data collection was performed by Westinghouse using ROSA and the TC6700 tester. Data was sent from the site via two T-l lines in the ANSER software format to the Westinghouse Waltz Mill, Pennsylvania facility. Westinghouse and its subcontractors performed the primary analysis of the eddy current data using Automated Data Screening (ADS) and STMax software for Data Management. Zetec performed the secondary analysis of the eddy current data at their Issaquah, Washington facility utilizing the Eddynet Computer Data Screening (CDS) system. Resolutions were performed jointly by Westinghouse and Zetec at the Vogtle site. In addition, an SNC Level III was located at the Vogtle site to facilitate the resolution of eddy current data and to perform the duties of the independent qualified data analyst (QDA). ANSER software was used for acquisition, data quality monitoring and for primary and secondary analysis. SNC site-specific Data Analysis Guidelines and procedure MRS 2.4.2 GPC-37, Rev. 10, "Steam Generator Eddy Current Data Analysis Techniques for Vogtle Units I and 2", were used to perform the analysis.
Tu be Wear Tables 2 - 5 list the locations and percent of wall thickness penetration for indications in all tubes having indications identified during the 2RI0 inspection, including expansions.
Tube Pluning Eleven tubes were plugged as listed in Table I below. Two tubes in SG 4 were plugged for the confirmed SCI (Single Circumferential Indication) calls reported on them. Stabilizers were installed in the Hot Leg side of plugged tubes except SG 1 -52/71 (AVB wear) and SG 2 - 11/60 and 12/59 (pulled tubes in Hot 4-2
Leg). Mechanical plugs were used in all locations except for the two tube sections pulled on the Hot Leg side of SG 2. Welded plugs were installed in the tube sheet on the Hot Leg side for these tubes.
Mechanical tube plugging was performed in accordance with Westinghouse Field Procedure MRS 2.3.2 GPC-13 Rev. 3, Mechanical Plugging of Steam Generator Tubes for Vogtle Site (ROSA). The welded tube plugs were installed per Westinghouse Procedure MRS 2.3.2 GEN-6 Rev. 11, Weld Repair of Steam Generator Tubes/Plugs. Pursuant to Vogtle Technical Specification 5.6.1O.a, a 15-day report was submitted to the NRC and identified the number of steam generator tubes plugged during 2R10. The subject report was submitted to the NRC by SNC letter NL-04-0908, dated 5120/04.
TABLE 1 VOGTLE 2R10 TUBE PLUGGING SG I SG 2 SG3 SG 4 11/64-TSH (SCI) 3/7-TSH (PVN) 11/65-TSH (SCI) 11/50-TSH (SCI) 52/71-AV4 (43%)
14/56-TSH (SCI) 14/67-TSH (SCI) 12/59-TSH (SCI) 46/89-TSH (SCI) 11/60-TSH (SCI) 17/68-TSH (SCI)
SCI - Single Circumferential Indication AV4 - Anti-Vibration Bar 4 Location TSH - Tube Sheet Hot PVN - Permeability Variation Final Results AVB wear is the only systematic degradation mechanism that has been observed at Vogtle 2. Based on application of conservative AVB wear growth rates, the condition of the Vogtle 2 SG tubes have been analyzed with respect to continued operability of the SGs until the end of Cycle 12, without exceeding the structural integrity recommendations. The growth rates were determined by comparative analysis of AVB wear sites from 2R8 and 2R10 for SGs 2 and 3 and between 2R7 and 2R9 for SGs land 4. The growth values obtained were not large enough to present a likelihood that conditions exceeding the structural limit would occur during the estimated 2.8 EFPY operating interval from 2R10 to EOC-12 for SGs 2 and 3, nor during the estimated 2.82 EFPY operating interval from 2R9 to EOC-l I for SGs I and 4. The conclusion for SGs I and 4 will be re-evaluated based on the data from 2R1 1.
The OD circumferential indications listed in Table I were evaluated by Westinghouse. The predicted minimum burst pressure at the end of the upcoming operating cycle exceeds 6200 psid at 90% probability, 50% confidence compared to the 3-NOP requirement of 3780 psid. Preliminary analysis shows no leakage is expected from any of the indications at the end of the upcoming operating cycle. Therefore, the requirements for the Operational Assessment are satisfied.
Attached are the Westinghouse tables listing the percent of wall thickness penetration for indications identified during the 2R10 inspection in Steam Generators I through 4.
4-3
TABLE 2 - SG I PERCENT WALL THICKNESS PENETRATION FOR EACH INDICATION CC, - I L."VtIM. C U&.10 rtstCEN TmRCL AL CAU OS 4TEC-1 MrC F-EPOPTIM. PEWIREPENT Page I of I v.Q I-IZ V U.-HI CB?.z.2 4eI 60/21/204 M13JL33 4
.., 4....
I
...4 -
I ROi roL VM OEG 2D PEP C
D 1
tucA IclI
[CHZ I
CPLrk MG TEGI 0f43T PI I-TYPE CiL 1
I ROW OL VOLT2 D£ thO I
CEk Cli'r tQm
]wall l:cHe I
Mt2EN CEC tCST 114t POIA PIYTPL CAL tl Tutua4r 1 WCC(ts fi 4-4
TABLE 3 - SG2 PERCENT WVALL THICKNESS PENETRATION FOR EACH INDICATION Pagel1 of 2
$0 -
I LS?1TER Cr UZP.1e PERCENtT THROUGH~l UAL 1N")fCAf101%
(TEC14 SPEC AlEPCnT3hc RIQUlR[Ew Ib V.tI 2 ULO L169L ZU"U,21.5 0512212024 12z10:e5 I R~y COL LTS D: G zQ PER C41i IOCNi INCHI roCiHz r CP.AEN Mer ozcr
[NOT' P1IIA PtYPE CAt. Li I22 i L13 A1 Pei It. vt A"f
.90 ILH 7tIC -Se1 RI1IAlkHi 20 C3 I34 12
.20 0 PCT 10 P2 AV3 T0 Ell IEC
.ru P.5011,911 24 C
I 1
36 14
.0 aI OCT It' P?
AV4
.0C irt" ire
-1144 ABVV 24 61i I So It
-.25 TEM
- rtc
.154A P.OAHH 26 el I42 193
.40 0 PCYII,1l P2 AV3
-.03 TCr4 ETC.1.45 RtumiI Cs (e
I42 13
.40 a
PCTIt1.
PE AwL
- .08 ILIO IEC
.5WE ROAR11 CZ I At 19
.22 o
OCT it P2 Awl.
-.10 TEN I Lu
- tbil R HART 14 Cs8 I -43 EC
.23 0 OCT 0
P2 AV'I
.03 TEN TIC
.1.6 ROMAH 30 C I 2
43 Z
.25 0 PCi 1?
P2 412
.06 FEN ltC
.568 PRA4H 30 el 11 PA 10 0
OCT I&
02 AfJ
.00 TEA4 P!C
.flA W4 L1 I 3 22i
.52 0 PalI&.5 P2 AVl;
,0 TEN IEC C
A61 PpARH 34 e
I $4 321
.34 0 PCT 13 PP AVI
.08 TEN 2(C
.5.6 FIIAAH 20 e I
pIT Ii%
09 AV4
.90 f(11
?EC
.DOC piM S.tm 2M L I II s.f 39
.34 0
PCI
.10 P2 AY3
.03 TEN TIC
.1.60 PoARH 24 C~
I I
'3!
.30 a
PC'!
is PE AVl
..06 TEN TEC
.1.0 PIMSI 24 Cl I J1 311
.45 a
PCI 16 Pt AV5
.0 TlEN TIC
.15 ra~w 2'
cl 1 39~ 43
.42 V 1`0
.10 P2 AT?
.98 UR1 TEC
.15-0 FRDARI
.4 CI I 39 43
.63 a
POT 17 P2 AV3
.06 TEN TEC
.561 RIRAqH
.4 I 39 43
.369 a
OCT 13 PP2 A4
.4 TENl TCC
.561!
pw4 4
Cj I 39 43
.2G C FCT
- .I P2 Al!.
.96 TEN Tic cs I.5 vR H A Cj I 39 43
.02 TEO#
TEC
.5.6 P9f0, BA 20&e I 19 43
.55 I
PCT 20 P2 AVS O
.I Eli TICC.1606 IlPii Uf 2-5 I '39 ItS
.3.1 4
PCI JA 02 AY4
- .500 Fb&ARH' 215 Ci I 39
.43
.2Z v
OCT 10 P2 AVS 2111 T Ell TEC
.1.0 ROMRH re CJ 3'A 44
.31 a
PCT 11 P2
.410
.101 Til TV1:
MD4 ojP" AR A
I35 44
.28 24?
OCT 10 P2 AYh 1
.27E11 TMC
-C&0 PtA~j 2C CI 1
40 41
.1.2 OCT 19 Pt AlA
.00 TEN1 Ire
.86C 6A~W 34 C
.40 An
.92 V
PCI 12 PP
.415
.06 TEN TLC
.t F0 SuAnif 34 el I -42 611
.3S 4 PCI 13 PP A12
.3.
TEll TIC
.1.6 pftAnb
- 3. Cl It 36 4
.29 4 PCT 11 PZ
.413
.010 I Ell TIC:
.563 RAmH 34 C I I 69 Sr.
.3s o PCr 12 Pt AY4
.002 Till IEC
.05U PSARI4 pH 1.i I AD 511
.49 g OCT 17 P2 AV;'
.0'3 TEO1 TIC
.663 FEOARII 34 C 2 I 40 so 1.17 a
PCI 26 Pt All
.6ll Till UlC
.660 PRARH 3.4 61 I As6 SO
.35 a
OCT 10 PO AlAl I
TEll lIr:.56
&cpzowi 3.' 6i I.46 SD 1.49 0
OCT 32 Pt
.413
.o3 Ttll TIC
.1.0- PoApr 24 CI I
Ab-Al a
MTr 12 vz.
AIM
.03THl IC
.1.0v Pu.'ti 3-4 Ci I.41 64
.00 Trll TIC
.5&Z FBARH 4fl C 1 I -t' 71'
.25.
0 PCI 19 PE Al?
- .22 TUll TIC
.66C PEW411 (4
l I (1 71
.36 a
PCr 13 02 Mo
.iTll IcC
.1.60 1211.
Up Cl I 5 71
.23 0
PCI 39 P2 AYI
.33 Tril tIC
.50.2 10..02 7A I
062 71
.22 9 PCI 12 P2 A YE
.30
'TEN Iou
.55C P15.401 74 Cl I
fir 7 I 1.C 0
PCI 31 P2
.443
.06 21.11 TIC
.564 F.DAJI2 7A Cl I
1.2 7 1 2,19 0
PCI 43 Pt A414 uaiTE ito
.5se 111.41
- u.
el I.
71 Sfl OPCT U0 P2 413'
.21 III!
ytt
.C00P F6AA
.7' C I 44
.2?1
.37 0 PCI 14 P2 AVG
.0.
TlEN TIC
.5CC PDA.4111 4? Cl I11 7.-
.10 ii PCT it PZ All
.05 irn u
iCC 0
08A.Pit 40 C[
I 61 72 a
PCI 9
PP
.4V4
-.03 TEll iTt:.GM POARnI 40 Cl I 1.
1 7?:
.03 1211 TIC
.566 $011A24 AS CI J
t.T1
,2
.30 90 PCT 12 P2
.411
.00 tCHtuC b01sk04t5, AZ Gi I
0 73
.44 0
?CT 34 P2 A415
.90' hEN ICC
.560 PIAAH 41 e
AC) 736
.34 0
PCI if Pt A410 Ea0 1(4 TIC
.550 911APH 4frC I
41 73
.07 0
.414
-. M 71.15 TIC
.0(0 N21AAH1
.46 CI I 5.2 73
.16 0 PCT 7
22 IV2
.14 tit Irt
,660
%AAPNH 42 CI I E2 73
.611 a PCI re PE A M3
.660 54iLUN dl el vo~r cot Vosr II.
tNu POC93 1u taWI(.
1i4CIll INOT.
I CA~th C122 BECT 21.07 5-I
'IE C
4-5
TABLE 3 - SG2 PERCENT WALL THICKNESS PENETRATION FOR EACH INDICATION Page 2 of 2 96 2
Lr51199 CC U~r.13 POJCEI1 TrIRCUEN4Att ?IMICA710143 I11EC1 SPEC P[PiOPTIFIG RECUIIM(ME11 V.2 C L
991-RCO 2224403 0612ziMe4 1230,135 toy I9 VOLT3 DEGO M~ PEP GMN 169 ICI 16112 I MUIIM CrEa WYG 11.0 PIIA PTYIPE CAL Li 0..
4-.................
4...........I.......
I 2 73 1.37 6PI" ;a Pt AVA O
TEH ILU
.b4A XnflAI 42 CI I 6 79 1
a4 PCi 3?
Pr AV5
.9 TEN TEC GCZ. RDAI 432 CI Se1. 79 1.17 0 PCI zv P2 A WS
.93 TEN TIC
.812 RoAR:1 42 z
I I38 74
.34 aOCTI 1 P2 AV2
- Si TEN TEC ruc Rnmta
'6 CI I38 7A 47 O CT IS6 P2 A£13
-.V65 TEN TEC GO.4 A MR' AC CI 1 42 74 1.Z2 It PCI St. P2 AVZ'
.96 TEN IrC
.660 RPRA4 AZ2 Cl a 42 74
.7Z3 a PCi et P,
AV.)
-.05 1194 TEC
_A15C RMAA 42 el 1
42 7A
.31 a
061 It P2 AVG
-,13 T194 TIC
."~I it 5 -4
.42 CI Al 74
.r15o a Pci
?a P2 AV3
-.03 TlEM 116
.1,1.0 P.UAR"
.A CI ISt 24
.46 a P C?
Et P2I A3
.63 T1H
- IEC
.1.1-6 PLAP21 40 el I
t1 74
.32 6 PCTIZ1 1'2 AVA
.18 IL"4 TIC
.1.03 PROARN A80 9 I 59. 74
.13 a
OCT
- r. P7 A V.
- 1A U"
N 1
5-r10 IlOAX11 A0 CJ I
6?
79 r27 0 OCT 16 Pr MS3
.08 119H TSC
.1G4 pB"It 4o C i IS?
79
.V, a pCT
- 11. V2 AlL
- .03 7EH 139 Nut"ROA 4V ej I S?
79
.22 C OCTit-14 P2
£13
-.03 1194 11F9
.1.4tBAR aCs I
?
790
.322 a
POT 1p pp AVA 54 16 ILI t.co n DAMI
.00 CI as BE
.31 0 PcT I I Pt AVO
.38 I(EH IEC
.1.93 181A9 46 CI s4 e!
.M PCT I
P2 AVE.
- 65 TIM4 IlC A.6 PRVre Cs5 04 20 a
Pei b
P2 AVl
-.29 TEN IEC
.69 PSRAIN I'd CI I5S
- w.
.3 0
OCT 12 P2.
AV4
- 68)
TEM 11C
.1.
Rut!"9 AC eI j.a 1.6
.26 07 PCT M-P2
£14
.68 1(91 119
,16RW4.
4CCI I51 907 e
POCT IC6 P2 AYZ
.38 T f N TIC
.2.6 RR&k4J At Cl I St 07
.49 OPCT 16 P2
£13
-.03 TE91
'110 M
R.68P8 H
-doCC SI St 7
.50 C OCT 17 P2 A14
-.98 TEN
'ICe
.M P eFBMII 4C CI I I A7 1.23 8 OCT
- 24. P2 M1
.13 1 Em 1CC
.1.6 p-BAtt AC0 el I
Su 32 PCT I11 92 AlA
.60 It"4 7C
.1.91. P ROAW tH
.4 4!
- 3 C
1 a
PcT 12 P?
£12
.00 TEN EIC
.1,60 08M,:w
-¶2 CI Si PA
.34 C PCT
.12 P2 A14
.1)5 UNm UC
.1.
P.
5Am A4C CI I
St GA
.45 POCT IL P2 A16
.38 TEN lic
.1.6 ITBMN AC8 el 6O 641
.123 SarPC 3
02 AY3
.05 tffn Tic me 810144
-.2 GI
&a 64
+/-2V 9 POT 9
P1!
AV4
.08 If"t 7EC t
R8 BA.R H
Ar el 1
SQ 119
.33 C
- 1) pp AYS
.1.619 A RAIN A
4 Ci It 9
.3.4 0 PCT
.1j AVG£1
-It1 TEH 1(0
.1680 P B8MW
.12 cI 151 119 A
.45 PCT It P2
£14
- .13 T~fa Itc
trB'
.61 8 PCT 21% P?
AI1.
.118 TEIN Icc xa
.6 8 mN.1.).. CI I
St FE)
.49 a
PDT it Pr A16
-. 08 IL"1 110
.143 OBMqII
.68 C
I 1 De
.42 0
P "
14 Pt AM4
.66 TIN4 TI
.66a P8MWR AC CI I51 00
.30 a
PCI
.14 P2 AVS
.88 TE11 TEC
.8.68 A BAR H 40 CI I St oc
.32 0 OCT
.13 P2 AV 4
.031 TCN
?EC
.800 IIAsqN ACG I 9 #,3 go
.29 0
POT it Pr
£15
-.13 TEN4 TEC
.X09 A GAA AC CJ I 49 91
.64 a
OCT 20 02 A612
- .00 Ml9 TEC
.600 RSARI
£0 CI I
S1
- 99.
.5 0
OCT 13 P2 AY$
-.63 119H 1(9
.500 OZAA.I
-to CI IB 1
.4 6ruT it FE A610 10 I1,11 99.0.~68 el691 4C I 36 li.
-36 POCT It Or AVI
.0 TEll TEC
.50 ONIAt d
ei I
) 1?
.24 0
OCT 0
P2 AY?
,68 TE11 TIC
.500 AP.ARN 44 CI I
I I
12 131
.21 C PcT 12 PP
.818
-.19 TE11 Ile
.5521 MAN49 1.8 C ROU 001.C, VOLTS 014 MI1 OPL Ct1.4 LOCI Ir.C1L lNhct 1
134U1 C(6 MTG 31.0 P>[A PI19E CI LI Imbas. all 062.'dst 36?
4-6
TABLE 4 - SG3 PERCENT WALL THICKNESS PENETRATION FOR EACH INDICATION Pg 1 of I 53-3 LZ;TtNC Of unn,1 PuIPEu l IO 11L~IG WALL INDICAIlC~f (71CH SPEC PEOATtIL.G P.WOiIP.IKNTSI V~q1 UzrIiO WE8 Mr210A31 CSZZ12CC4 1Z;19:4r.
I AtOQ CL. ~VOLTS DtZ 1rNO PER CIIT o
ICI 0M hJ I
1V2 I Cft4t CIG A7CT V~W FB114 PTYPE:
tAL LI I
2 2
C 0
P"I PrF AlP
.90 11,11 TLC
.54*
peSA$Ii
- 1 c
I I.
it r.Af P
PC I 15 Pe Al/li
- .11 TEiA TLC
.5C*
RIAR11 le CI I
I 3
.61 a
PCI in fz?
AlS
.14 TE11 TIC
.SCO 25R11tl le VI I
I I
3 ?
1 5
. 3 2 S
PC T I C P t A V 4 p
T I N
T I C 15 M I K2.. i i l e e l I
441 1
0 e.3 1
PC7 S
Pr Avs Ila TEA TIC
.,.Co PSA21 10 el I 44 21
,2 1 0
P ei l e P
A l/S.0 T I M
T EC b rA t3A AI 1 4 C I I
I I 44 22
- 2.
0 Pc 7 to P2 Al/I
.Z TEN TIC
.81.
I I
1 3B
.2.8 I
P I it Pr AV/I
-. D Tit TIC WAC K9Aq1I re el j
51 37
.41~
B PC]
34 Pr AVS
.L'3 TEH4 Tic
.8AW
&BA1, re3 el 1
36AH A
IZ PtIT II%
P2 Al/S
.08 Ttft TIC tN f.OtBA3II 2Cc1 I
I 574 03
.41 S
Pei 1:3 P7 A ft 0
Tim TIC
. EGO Ir0A.mf 28 Cl I
I I S?
4
'N AJ DUCT It P2 AV/I
.0 TIMl TEC
. ECDt.OI fu aZSC I
57 49
.4O a
OCT LA P1 AV18
.00 TIM TIC
.650
?871
.25 CI I
57 40
.41 a
LC 1
Pr Ave
.00 Tkm TIC
.88-0 Pt3A¶N 28 C
I I
IS 4?
48
.19 a
PC?
Ge P7 AVi
..w s T H TiCc
.:':.v Ik0/i 20 el I
I I
$0 42
.112 S)
PCI It Ft AV?,
.+/-u TtE T9C
.851 18A211 33 01 I
88 40 487 5
PCI L3 rz Al/S
.Dl TE)-
TEC
.61.0U FRAR4t
.2 el SOa 40
.4 S
PC Is1 P7 AVO
.8 TERl TIC
.86.0 tDAAH 25 Cl I
I I
4?
73
.15 a
PC?
le Pr AVA T.8 (4
.8CO POAi4j 28 el I
55 8?0 P Ci 11 P`2 A02 Da T
W TIC
.8W0
&RA1m 313 cl 225 Az I.11 0
PCI 13 1P7 AV2
.80 TEf TIC
.85V ROAPAt 35 Cl 30 5
77
.2
.32c" TS4 T
rAIC
.580&U P I FTP.1Afj C3 LI 1
41
?
.43 CPI 1
I-
-AVO
.08
.l TIC
.5.
-0A-4
- CI I
I.
l R r
.d
,7 4-7
TABLE 5-SG4 PERCENT WVALL THICKNESS PENETRATION FOR EACH INDICATION Pg I of I SG - 4 LISTCWt a unive mmRCin THROUCH UAlt 1M)CAT7liCS ITECH IPLC ArPTING REQUIRtEtO01`s USL MI.As wt us ~
404111 "IrZIM4 12sr5s19 I..
l4......
1 I rW COL VOL1 DG ]W PER ar1N tool WCWI IACI2 t
C rlI fG ntGr EXKr PFlA PrTrC CAL LI I.......
-4s.....
I---------
4-1 l_._.,_....................
t it "
.1z 1c*
Pc?
P s
lr
.32 T5H Tail
.f"4 20IM1 es2 n I
I t
13 WI
.I 308 PCI 13 3
l11.
.12 T9H S11 Jr.
2PSNA 59 H1
_fi........................
I.
I RO',
MLI VOLTS bG It P5tLF Vs tocTa IkCNI 2&CIz I MtEN MC ITGr rhor P1OA EPTrZ CAL LI TiA-st 7 R.rcard4, 2
4-8
C/;
C VEGP-2 TENTH MAINTENANCE I REFUELING OUTAGE CLASS I AND 2 WELD EXAMINATIONS c
ASME SECTION XI ITEM NO./CAT.
AUGMENTED RI ITEM I EXAMINATION RI SEGMENT REQUIREMENT(S)
COMPONENT OR WELD NO. I DESCRIPTION EXAMINATION PROCEDURE(S)
CALIBRATION BLOCK(S)
EXAM SHEET NO(S).
RESULTS REMARKS 410A S04 V2U583 B2.40 B-B 21201-B6-004-W08 TUBE PLATE TO CHANNEL HEAD ES-MISN-V-411 410A S04V2U583 S04V2U584 S04V2U585 S04V2U586 NRI NRI NRI NRI UT EXAM LIMITED (80%)
REFERENCE RR-6 B3.140 B-D RR-6 21201-B6-003-IR-01 INLET NOZZLE INNER RADIUS ES-MISN-V-715 S04V2V068 SAT NIA 83.140 B-D RR-6 21201-B6-003-IR-02 OUTLET NOZZLE INNER RADIUS ES-MISN-V-715 S04V2V069 SAT N/A B7.30 B-G-2 21201-B6-002-B01 - B32 PRIMARY MANWAY BOLTING 21201-36-003-Bol - B32 PRIMARY MANWAY BOLTING ES-MISN-V-715 ES-MISN-V-715 S04V2V044 SAT S04V2V045 SAT N/A N/A 87.30 B-G-2 B8.10 B-H 21201-V6-001-W205 LIFTING LUG AT 120 DEGREES ES-MISN-V-505 S04V2M001 NRI MT EXAM LIMITED (50%)
REFERENCE RR-4 89.11 B-J R1.11 2RCS-005 21201-005-8 31" ELBOW TO NOZZLE 21201-008-8 31" ELBOW TO NOZZLE ES-MISN-V-406 ES-MISN-V-406 329A 329A S04V2U555 RI S04V2U556 NRI S04V2U557 RI S04V2U558 NRI UT RI / GEO UT RI / GEO B9.11 B-J R1.11 2RCS-008 B9.11 B-J R1.11 2RCS-018 21201-030-1 4" BRANCH CONNECTION TO PIPE ES-MISN-V-481 303A S04V2U563 NRI N/A B9.11 B-J R1.11 2RCS-027 21201-0534 16" PIPE TO REDUCER ES-MISN-V.481 316A S04V20564 RI UT RI IGEO B9.11 B-J R1.16 2SI-059A 21204-021-16 6' PIPE TO VALVE ES-MISN-V-481 304A S04V2U551 NRI S04V2U552 RI UT RI / GEO UT EXAM LIMITED (50%)
RELIEF REQUIRED 5.1
C, C,
VEGP-2 TENTH MAINTENANCE I REFUELING OUTAGE CLASS I AND 2 WELD EXAMINATIONS c,
ASME SECTION Xi ITEM NO.ICAT.
AUGMENTED RI ITEM I EXAMINATION RI SEGMENT REQUIREMENT(S)
COMPONENT OR WELD NO. I DESCRIPTION EXAMINATION PROCEDURE(S)
CALIBRATION BLOCK(S)
EXAM SHEET NO(S).
RESULTS REMARKS B9.11 B-J 1R1.11 2RCS-053 21204-021-20 6" PIPE TO ELBOW ES-MISN-V-481 304A S04V2U553 NRI S04V2U554 NRI N/A 89.11 B-J R1i.16 2SI-056A 21204-023-15 6" PIPE TO VALVE ES-MISN-V-481 304A S04V2U541 RI S04V2U542 RI UTRI /GEO UT EXAM LIMITED (50%)
RELIEF REQUIRED B9.21 B-J R11.11 2RCS-042A 21201-059-15 3" ELBOW TO ELBOW ES-MISN-V481 334A S04V2U543 NRI S04V2U544 T&C N/A B9.21 B-J 1RI.11 2RCS-042B 21201-060-4 3" ELBOW TO ELBOW 21208-007-6 3" PIPE TO BRANCH CONNECTION ES-MISN-V-481 ES-MISN-V-481 334A 334A S04V2U545 NRI S04V2U546 T&C S04V2U561 NRI S04V2U562 T&C N/A N/A B9.21 B-J R1.11 2RCS-058 B9.21 B-J R1.11 2RCS-057 21208-009-6 3" PIPE TO BRANCH CONNECTION ES-MISN-V-481 334A S04V2U559 NRI S04V2U560 T&C N/A B13.10 B-N-1 FSAR 5.3.3.7 21201-V6-001-102 VESSEL CLOSURE HEAD INTERIOR (FSAR 5.3.3.7)
ES-MISN-V-735 S04V2V046 SAT N/A B16.20 B-Q TS 5.5.9 B16.20 B-Q TS 5.5.9 21201-B6-001-T01 TUBING - ENTIRE LENGTH OF SELECTED TUBES 21201-B6-002-TO1 TUBING - ENTIRE LENGTH OF SELECTED TUBES 21201 -B6-003-T01 TUBING - ENTIRE LENGTH OF SELECTED TUBES VENDOR VENDOR VENDOR 806A,B,C,D, 807A,B 806A,B,C,D, 807A,B 806A,B,C,D, 807A,B N/A N/A N/A B16.20 B-0 TS 5.5.9 5-2
c C
VEGP-2 TENTH MAINTENANCE I REFUELING OUTAGE CLASS 1 AND 2 WELD EXAMINATIONS
(
ASME SECTION Xi ITEM NO.1CAT.
RI ITEM /
RI SEGMENT AUGMENTED EXAMINATION REQUIREMENT(S)
COMPONENT OR WELD NO. I DESCRIPTION EXAMINATION PROCEDURE(S)
CALIBRATION BLOCK(S)
EXAM SHEET NO(S).
RESULTS REMARKS B16.20 B-0 TS 5.5.9 21201-16-004-TOI TUBING - ENTIRE LENGTH OF SELECTED TUBES VENDOR 806A,B,C,D, 807A,B NMA C2.21 C-B 21201-B6-004-W26 6" AUX FEEDWATER NOZZLE TO SHELL WELD ES-MISN-V-411 ES-MISN-V-505 409A S04V2M002 S04V2U567 S04V2U568 S04V2U569 S04V2U570 NRI NRI NRI NRI NRI UT EXAM LIMITED (50%)
RELIEF REQUIRED C5.11 C-F-1 RI.11 2SI-071A C5.11 C-F-I R1.11 2SI-072A 21204-001-8 12" ELBOW TO PIPE 21204-006-80 12" ELBOW TO PIPE (Al 87-0131) 21204-007-1 10" ECC. REDUCER TO PIPE ES-MISN-V-481 ES-MISN-V-481 ES-MISN-V-481 341A 341A 340A S04V2U508 NRI S04V2U509 NRI S04V2U512 NRI S04V2U5i3 T&C N/A N/A N/A C5.11 C-F-i R1.11 2CS-029A C5.11 C-F-1 R1.11 2SI-032 21204-008-10 8" PIPE TO VALVE (Al 87-0131)
ES-MISN-V-481 414A S04V2U514 S04V2U515 S04V2U516 NRI NRI T&C UT EXAM LIMITED (50%)
RELIEF REQUIRED C5.11 C-F-1 R1.11 2CS-031 21204-038-1 14" BRANCH CONNECTION TO PIPE (Al 87-0131)
ES-MISN-V-481 343A S04V2U510 NRI NMA C5.11 C-F-1 111.11 2CS-030 21204-038-16 10" PIPE TO ELBOW ES-MISN-V.481 340A S04V2U517 NRI N/A C5.11 C-F-1 RI.11 2SI-019 21204-039-1 8" VALVE TO PIPE ES-MISN-V-481 305A S04V2U527 NRI S04V2U528 NRI UT EXAM LIMITED (50%)
RELIEF REQUIRED C5.11 C-F-i R1.11 2SI-020 21204-041-2 8" PIPE TO PIPE ES-MISN-V-481 305A S04V2U565 NRI S04V2U566 T&C N/A 5-3
(
C VEGP-2 TENTH MAINTENANCE / REFUELING OUTAGE CLASS 1 AND 2 WELD EXAMINATIONS C
ASME SECTION Xi ITEM NO.1CAT.
AUGMENTED RI ITEM I EXAMINATION RI SEGMENT REQUIREMENT(S)
COMPONENT OR WELD NO. I DESCRIPTION EXAMINATION PROCEDURE(S)
CALIBRATION BLOCK(S)
EXAM SHEET NO(S).
RESULTS REMARKS C5.11 C-F-1 R1.11 2SI-031 21204-192-4 8" PIPE TO BRANCH CONNECTION ES-MISN-V-481 414A S04V2U505 S04V2U506 S04V2U507 NRI NRI T&C UT EXAM LIMITED (50%)
RELIEF REQUIRED C5.11 C-F-1 R1.11H 2RHR-01 1A C5.11 C-F-1 R1.11H 2RHR-012A 21205-007-18 8"TEE TO PIPE 21205-008-17 8" TEE TO PIPE 21205-009-13 8" PIPE TO ELBOW ES-MISN-V-481 ES-MISN-V-481 ES-MISN-V-48 1 414A 414A 414A S04V2U525 NRI S04V2U526 T& C S04V2U518 NRI S04V2U519 T&C S04V2U520 NRI S04V2U521 T&C S04V2U511 NRI N/A NMA N/A N/A C5.11 C-F-1 R1.11 2RHR-013A C5.11 C-F-1 R1.11 2RHR-01 3A 21205-010-12 12" PIPE TO ELBOW (Al 87-0131)
ES-MISN-V-481 341A C5.21 C-F-1 R1.11 2SI-064 21204-063-21 4" PIPE TO REDUCER ES-MISN-V481 303A S04V2U522 NRI S04V2U523 NRI S04V2U524 T&CC N/A C5.21 C-F-1 R1.13 2CV-1 10 21208-005-CV110 3" PIPE DS (FO-0200, 201, 202)
ES-MISN-V-465 S04V2U550 NA S04V2U578 NA UT EXAM LIMITED (78%) - NO RELIEF REQUIRED PER SNC ISI/RI ENGINEERING.
UT READINGS BELOW ACTION LEVEL.
REFERENCE INF 104V2001 FOR DISPOSITION.
C5.51 C-F-2 R1.11 2MS-007D TS 5.5.16 21301-004-1 PENETRATION TO 28" PIPE (TS 5.5.16)
ES-MISN-V-480 313A S04V2U574 NRI N/A C5.51 C-F-2 R1.11 2MS-007D TS 5.5.16 21301-004-10 29 1/2" PIPE TO VALVE (TS 5.5.16)
ES-MISN-V-480 314A S04V2U580 NRI UT EXAM LIMITED (75%)
RELIEF REQUIRED 5-4
(
c
(
VEGP-2 TENTH MAINTENANCE / REFUELING OUTAGE CLASS 1 AND 2 WELD EXAMINATIONS ASME SECTION XI ITEM NO./CAT.
RI ITEM I RI SEGMENT AUGMENTED EXAMINATION REQUIREMENT(S)
COMPONENT OR WELD NO. I DESCRIPTION EXAMINATION PROCEDURE(S)
CALIBRATION BLOCK(S)
EXAM SHEET NO(S).
RESULTS REMARKS C5.51 C-F-2 R1.11 2MS-007D TS 5.5.16 TS 5.5.16 C5.51 C-F-2 R1.11 2MS-007D C5.51 C-F-2 R1.11 2MS-01 OD 21301-004-2 28" PIPE TO PIPE (TS 5.5.16) 21301-004-3 28" PIPE TO 29 112" PIPE (TS 5.5.16) 21301-004-5 6" OUTLET TO FLANGE 21301-016-1 10" BRANCH CONNECTION TO PIPE 21305-058-7 16" VALVE TO PIPE (TS 5.5.16) 21305-058-8 16" PIPE TO PENETRATION (TS 5.5.16)
ES-MISN-V-480 ES-MISN-V-480 ES-MISN-V-480 ES-MISN-V-480 ES-MISN-V-480 ES-MISN-V-480 313A 313A, 314A 308A 31 OA 311A 311A S04V2U575 NRI S04V2U576 NRI S04V2U577 NRI S04V2U581 NRI S04V2U582 NRI S04V2U579 NRI S04V2U571 NRI S04V2U572 RI S04V2U573 NRI NIA NIA N/A N/A UT RI t GEO N/A C5.51 C-F-2 R1.11 2MS-019D C5.51 C-F-2 R1.11 2FW-014A TS 5.5.16 TS 5.5.16 C5.51 C-F-2 R1.11 2FW-014A 5-5
c c
VEGP. 2 TENTH MAINTENANCE I REFUELING OUTAGE CLASS I AND 2 SUPPORT EXAMINATIONS
(
ASME SECTION Xi CATEGORY F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A ISI CLASS
- 1 1
1 1
NPS (IN.)
12 12 16 0
0 a
3 3
3 3
3 3
3 3
SUPPORT NUMBER DESCRIPTION 21201-049-H024 STRUT 21201-049-H027 STRUT 21201-053-H002 STRUT 21201-P6-004-SPO1 Pump support 21201-P6-004-SP02 Pump support 21201 -P6-004-SP03 Pump support 21204-076-H0OI STRUT 21204-076-Hall RESTRAINT 21204-076-H014 RESTRAINT 21204-076-Hl15 RESTRAINT 21204-076-Ha17 RESTRAINT 21204-076-H019 RESTRAINT 21204-076-H021 RESTRAINT 21204-076-H023 STRUT EXAMINATION PROCEDURE(S)
ES-MISN-V-735 ES-AISN-V-735 ES-MISN-V-735 ES-MISN-V-735 ES-MISN-V-735 ES-MISN-V-735 ES-MISN-V-735 ES-MISN-V-735 ES-MISN-V-735 ES-MISN-V-735 ES-MISN-V-735 ES-MISN-V-735 ES-MISN-V-735 ES-MISN-V-735 EXAM SHEET S04V2V064 S04V2VW65 S04V2V070 S04V2V061 S04V2V062 S04V2V063 S04V2VW35 S04V2V036 S04V2V037 S04V2V038 S04V2V039 S04V2V040 S04V2V041 S04V2V042 RESULTS SAT SAT SAT SAT SAT SAT SAT SAT SAT SAT SAT SAT SAT SAT REMARKS N/A N/A NMA N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 6-1
c C
VEGP-2 TENTH MAINTENANCE I REFUELING OUTAGE CLASS 1 AND 2 SUPPORT EXAMINATIONS C
ASME SECTION XI CATEGORY F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A F-A ISI CLASS 2
2 2
2 2
2 2
2 2
2 2
2 2
NPS (IN.)
3 8
8 8
8 8
8 8
8 8
8 8
8 8
SUPPORT NUMBER DESCRIPTION 21208-007-HOOI RESTRAINT 21202-140-H006 RESTRAINT 21202-141-H007 RESTRAINT 21202-141-H009 STRUT 21202-141-HOll STRUT 21202-220-H003 RESTRAINT 21202-220-H005 STRUT 21202-220-H006 STRUT 21202-220-HO 11 RESTRAINT 21202-220-HO15 RESTRAINT 21202-220-H017 RESTRAINT 21202-220-H023 RESTRAINT 21202-220-H024 RESTRAINT 21202-220-H025 RESTRAINT EXAMINATION PROCEDURE(S)
ES-MISN-V-735 ES-MISN-V-735 ES-MISN-V-735 ES-MISN-V-735 ES-MISN-V-735 ES-MISN-V-735 ES-MISN-V-735 ES-MISN-V-735 ES-MISN-V-735 ES-MISN-V-735 ES-MISN-V-735 ES-MISN-V-735 ES-MISN-V-735 ES-MISN-V-735 EXAM SHEET S04V2V066 S04V2V071 S04V2V048 S04V2V050 S04V2V049 S04V2V031 S04V2V032 S04V2V033 S04V2V026 S04V2V027 S04V2V028 S04V2V029 S04V2V024 S04V2V025 RESULTS SAT SAT SAT SAT SAT SAT SAT SAT SAT SAT SAT SAT SAT SAT REMARKS N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A I
6-2
(
ASME SECTION Xi CATEGORY F-A F-A F-A F-A F-A F-A F-A F-A F-A ISI CLASS 2
2 2
2
- 2 2
2 2
2 NPS (IN.)
6 8
6 4
10 8
6 6
6 CA VEGP-2 TENTH MAINTENANCE I REFUELING OUTAGE CLASS I AND 2 SUPPORT EXAMINATIONS SUPPORT NUMBER EXAMINATION EXAM DESCRIPTION PROCEDURE(S)
SHEET 21204-011--H005 ES-MISN-V-735 S04V2V020 RESTRAINT/LUGS 21204-012-HOOl ES-MISN-V-735 S04V2V016 RESTRAINT 21204-039-HOOI ES-MISN-V-735 S04V2V034 ANCHOR 21204-063-HOOl ES-MISN-V-735 S04V2V002 RESTRAINT 21204-121-HOOl ES-MISN-V-735 S04V2VW30 RESTRAINT 21208-411-H016 ES-MISN-V-735 S04V2V004 UNDERSUPPORT 21501-027-H002 ES-MISN-V-735 S04V2V052 RESTRAINT 21501-027-H005 ES-MISN-V-735 S04V2V053 UNDERSUPPORT 21501-028-H005 ES-MISN-V-735 S04V2V051 RESTRAINT c
RESULTS SAT SAT SAT SAT SAT SAT SAT SAT SAT REMARKS NIA N/A N/A N/A N/A N/A N/A.
N/A N/A 6-3
SYSTEM PRESSURE TESTS The following pressure tests were included in the scope of the tenth maintenance/refueling outage at VEGP-2. These pressure tests included system inservice and system leakage tests. Boundaries for these pressure tests are described in the VEGP-2 Inservice Inspection Plan - Second 1 0-Year Interval document. Examination results are discussed in the applicable sections of the "NIS-1 Abstract" of this report document. The examination data for these pressure tests is available at the plant site for review upon request.
System Inservice Test Schedule (ITs)
IT Exam.
Test Number Cat.
Description 11,
C-H Centrifugal Charging Pump 21208-P6-002 (Train "A") Discharge Inservic6 Test 12 C-H Centrifugal Charging Pump 21208-P6-003 (Train "B") Discharge Inservice Test System Leakage Test Schedule (LT)
LT Exam.
Test Description Number Cat.
I B-P IClass I System Leakage Test 7-1
INDICATION NOTIFICATION FORMS The following Indication Notification Form(s) (INFs) were issued by Materials and Inspection Services (M & IS) of Southern Nuclear Operating Company (SNC) due to reportable indications or conditions being observed during the examination of either Class I or 2 components during the tenth maintenance/refueling outage at VEGP-2 (referenced attachments are available at the VEGP plant site for review upon request):
INF No.
Affected Component/Area INF Disposition I04V2001 21208-005-CVI 10 During ultrasonic examination of CV1I0 (Components DS of CVCS Flow Orifices), per the RI Calc Notes, wall thickness readings were reported downstream of the CVCS flow orifices which were below the 12'/% mil spec tolerances. (See S04V2U550).
Condition Report 2004001842 was written to address this issue. Per RER 2003-V0561 (Log: PS-04-0763) the actual pipe wall thicknesses are acceptable until 2RI I. During 2RI 1, these piping segments will be re-inspected to determine actual wall thickness values at that time.
The INF(s) constitute only those reportable indications or conditions observed during the SNC M & IS Department scope of work. Any reportable indications or conditions observed by VEGP Site personnel or outside contractors during their scope of work should be identified by/to the VEGP site in report document(s) which are referenced herein.
8.1
OWNNIER'S REPORTS FOR REPAIRS OR REPLACEMENTS (FORM NIS-2)
The following Owner's Reports for Repairs or Replacements (Form NIS-2) are provided for work activities documented at VEGP-2 since the last maintenance/refueling outage (2R9) through the completion of the tenth maintenance/refueling outage (2R10) in May 2004. Reports are identified by their respective traveler number which is denoted on each of the NIS-2 reports. The originals of the NIS-2 reports are filed with their respective traveler packages at the plant site. Only those NIS-2 reports applicable to VEGP-2 Class I and 2 pressure retaining components and their supports are included in this report document. Any attachments, e.g., code data reports, etc., referenced in the NIS-2 reports will be made available for review upon request at the plant site.
The NIS-2 reports for the following travelers are included herein:
99269 02064 02067 02068 02069 02075 02094 02100
- 02101 02102 02103 02104 02105 02108 02109 02110 02111 02112
- 02114 03036 03074 03075 03080 03112 03113 03115 04008 04009 04012 04014 04015 04016 04019 04022 04023 04024 04025 04026 04027 04030 04038 04041 04042 04051 04052 04062 04072 04076 04080 04081 04082 04083 04084 04085 04086 04088 04089 04090 04092 04094 04097 04098 04099 04100
- Traveler 02100 is included with 02112.
9-1
FORM NIS-2 OWNER'S REP OR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler #
99269 November 21, 2003
- 1. Owner Southern Nuclear Operating Company Name 40 Inverness Center Parkway, Birmingham, AL Date Address
- 2. Plant Voatle Electric Generating Plant Sheet Unit MWO X I
of I
2 Plant Wavnesboro, GA 30830 29900433 Address
- 3. Work Performed by Nuclear Operations Maintenance Name Repair Organization P.O. No., Job No., etc.
Plant Vogtle Address
- 4. Identification Of System 12011 Reactor
- 5. (a) Applicable Construction Code ASME Section /it 1971 Edition, (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6. Identification Of Components Repairs Or Replacement Components Coolant System Summer 1972 Addenda, N/A Code Case NAME NAME MANUFACTURER NATIONAL
- REPAIRED, ASME CODE OF
'OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO.
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
STEAM WESTINGHOUSE 1983 N/A 2-1201-B6-001 1981 REPLACEMENT YES GENERATOR ELECTRIC CORP.
- 7. Description Of Work Replaced two studs on primarV hot leg manwaV.
S. Tests Conducted:
Pneumatic El Nominal Operating Pressure 0 NIA a Other El Pressure N/A PSI Test Temp.
NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.
repair or replacement Type Code Symbol Stamp NIA Certificate outhorization No.
NIA Expiration Date NIA Signed J~-Date ner wr r's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Georgia and employed by Hartford Steam Boller Inspection and Insurance Co of Connecticut of Hartford Connecticut have inspected the components described in this Owner's Report during the period October 19, 1999 to l-0
, and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any maner for any personal injury or property damage or a loss of any kind arising from or connected with this anype~t.;
7 y</'
o oCommissions rlX
- 2,2 Inspector's Signature National Board, State, Province and Endorsements Date
OWNR. RQRIGINAL FORM NIS-2 OWNER'S ORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler#
02064 Owner.
Southern Nuclear Operating Company Date November 21, 2002 Name 40 Inverness Center Parkway, Birmingham, AL Sheet 1
of I
Address
- 2. Plant Vogtie Electric Generating Plant Unit 2
Plant Waynesboro, GA 30830 MWO#
20200775 Address Repair Organization P.O. No., Job No., etc.
-3. Work Performed by Nuclear Operations Maintenance Plant Vogtle Name Address
- 4. Identification Of System 1208/ Chemical and Volume Control System
- 5. (a) Applicable Construction Code ASME Section l 1971 Edition, Winter1972 Addenda, AWA Code Case (b)Appiicable Edition of Section XI Utilized For Repairs Or Replacements 1982
- 6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
RELIEF CROSBY VLAVE N56900-00 074 N/A 2PSV-8121 1997 REPLACEMENT YES VALVE
& GAGE CO.
- 7. Description Of Work Relief valve SIN N56900-00-049 was removed for Inservice testing and replaced by relief valVe S/N n56900-00-0074. Relef1 valve S/N 56900-00-0074 Is a rotatina spare: orlalnall Purchased under PO# 7029205 and received under MIR# 970901.
8 Tests Conducted:
Hydrostatic 0 Pneumatic E Nominal Operating Pressure 0 N/A 0 Other 0 Pressure N/A PSI Test Temp.
N/A F
CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code,Section XI.
repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization Ng N/A Expiration Date N/A SionA J0 D
or0 er's Designee, Tife CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission Issued by the National Board of Boller and Pressure Vessel Inspectors and the State or Province of Georgia and employed by Hartford Steam Beoller Inspectlon and Insurance Co of Connecticut of Hartford Connecticut have Inspected the components described In this Owner's Report during the period -
May 13, 2002 to a
- 5¢0
, and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners ReporL Furthermore, neither the Inspector nor his employer shall be liable In any mannzr for any personal Injury or property damage or a loss of any kind arising from or connected with this Commissions G4-g Inspectcf's Signature National Board, State, Province and Endorsements de
ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler #
02067 Owner Southern Nuclear Operating Company Date November 14, 2002 Name 40 Inverness Center Parkway, Birmingham, AL Sheet 1
of I
Address
- 2. Plant Vogtie Electric Generating Plant Unit 2
Plant Waynesboro, GA 30830 MWO 20101597 Address Repair Organization P.O. No., Job No., etc.
- 3. Work Performed by Nuclear Operations Maintenance Plant Vogtle Name Address
- 4. Identification Of System 1201 / Reactor Coolant System
- 5. (a) Applicable Construction Code ASME Section III 1977 Edition, Winter 1977 Addenda, MA Code Case (b)Appiicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
VALVE Westinghouse 12001GMSSSE W22946 24HVV8701B 1980 REPAIR YES Electro-Mech Ho0100S 74008
S. Tests Conducted:
Hydrostatic 0 Pneumatic 0 Nominal Operating Pressure 0 N/A 0l Other Cl Pressure N/A PSI Test Temp.
N/A
'F CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this repair conforms to the rules of the ASME Code, Section Xi.
repair or replacement Type Code Symbol Stamp NIA Certificate o Authorization No.
NIA Expiration Date N/A 0
oreOwner's D Ineie,(te CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission Issued by the National Board of Boller and Pressure Vessel Inspectors and the State or Province of Georala and employed by Hartford Steam Boller Inspection and Insurance Co of Connecticut of Hartord Connecticut have Inspected the components described In this Owner's Report during the period June 4, 2002 to
/ /
and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code,Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be labl in any mier for any personal Injury or property damage or a loss of any kind arising from or connected with this Commissions GA.103 InsseWCtor's Signaue National Board, State, Province and Endorsements Date
//-a--a 2
ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xi Traveler #
02068 to.
Owner Southern Nuclear Operating Company Date November 14,2002 Name 40 Inverness Center Parkway, Birmingham, AL Sheet 1
of I
Address
- 2. Plant Vogtle Electric Generating Plant Unit 2
Plant Waynesboro, GA 30830 MWO#
20103350 Address Repair Organization P.O. No., Job No., etc.
- 3. Work Performed by Nuclear Operations Maintenance Plant Vogtle Name Address
- 4. Identification Of System 1201 / Reactor Coolant System
- 5. (a) Applicable Construction Code ASME Section it 1977 Edition, Winter 977 Addenda, N/A Code Case (b)Appiicable Edition of Section XI Utilized For Repairs Or Replacements 1989
- 6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
VALVE Westinghouse 12001GM88SE W22945 2-HV.8702A 1980 REPAIR YES Electro-Mech HO0OOOS74007
'3. Tests Conducted:
Hydrostatic 0 Pneumatic El Nominal Operating Pressure 0 WA 0l Other 0 Pressure WA PSI Test Temp.
N/A 2F CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this repair conforms to the rules of the ASME Code, Section Xi.
repair or replacement Type Code Symbol Stamp WA Certificate 0 uthorization No.
N/A Expiration Date NWA Signed
°
/eDate i///
2(
d,2 Owner or Owneaes Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the Natlonal Board of Boller and Pressure Vessel Inspectors and the State or Province of Georgia and employed by Hartford Steam Boller Inspection and Insurance Co of Connecticut of Hartford Connecticut have Inspected the components described In this Owner's Report during the period June 4,2002 to.....I o,
and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section Xi.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any manna for any personal Injury or property damage or a loss of any kind arising from or connected with this lnsp on.
A Commissions GA o Inspecpfri's Signature National Board, State, Province and Endorsements Date
//-/,d.Z K>
FO ORIGINAL FORM NS-2 OWNER'S REPORT FOR REPAIR OR REPLACEMENTS As Required ByThe Provisions Of The ASME Code Section XI Traveler #
02069 Y...
Owner Southern Nuclear Operating Company Date November 14,2002 Name 40 Inverness Center Parkway, Birmingham, AL Sheet 1
of 1
Address
- 2. Plant Vogtle Electric Generating Plant Plant Waynesboro, GA 30830 Unit MWO #
2 20101555 Address Repair Organization P.O. No., Job No., etc.
- 3. Work Performed by Nuclear Operations Maintenance Name Plant Vogtle Address
- 4. Identification Of System 1201 1 Reactor Coolant System
- 5. (a) Appiicable Construction Code ASME Section /it 1977 Edition, Winter 1977 Addenda, N/A Code Case (b)Appilcable Edition of Section XI Utilized For Repairs Or Replacements 1989
- 6. Identification Of Components Repairs Or Replacement Components NAME NAM E MANUFACTURER NTOAIREPAIRED, ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO.
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
VALVE Westinghouse 12001GMOOSE W23271 2-HV-8702B 1981 REPAIR YES Electro-Mech H01000S74008
- 7.
Description Of Work Installation of RHR Bonnet Vent Line ver DCP OO-V2NOOIZ.
- 8. Tests Conducted:
WN/A Hydrostatic E Pneumatic D Nominal Operating Pressure C0 Other 0 Pressure NWA PSI Test Temp.
WA SF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this repair conforms to the rules of the ASME Code,Section XI.
repair or replacement Type Code Symbol Stamp NWA Certificate of Authorization No.
WNA Expiration Date NA Signed 7-
/'4a/
Date 414 OwnS~o we' elno il CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boller and Pressure Vessel Inspectors and the State or Province of Georala and employed by Hartford Steam Boller Inspection and Insurance Co of Connecticut of Hartford Connecticut have Inspected the components described In this Owner's Report during the period June 4,2002 to
//- Ik-02
, and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code,Section XI, By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Inspeption.
Ag in3 oyA,;?3 Inspe~for's Signature National Board, State, Province and Endorsements Date
/I-/s-o2
ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xi Traveler #
02094 November 11, 2002
<K,>
Owner Southern Nuclear Operating Company Date Name 40 Inverness Center Parkway, Birmingham, AL Sheet Address
- 2. Plant Vogtle Electric Generating Plant Plant Waynesboro, GA 30830 Address I
of I
2 Unit MWO #
20202422 Repair Organization P.O. No., Job No., etc.
- 3. Work Performed by Nuclear Operations Maintenance Name Plant VogUe Address
- 4. Identification Of System 12041 SAFETY INJECTION SYSTEM
- 5. (a) Applicable Construction Code ASME Section IX 1977 Edition, Winter 1977 Addenda, MA Code Case (b)Applicable Edition of Section Xi Utilized For Repalrs Or Replacements 1989
- 6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO) 1204 PIPING PULLMAN WA WA 2-1204-PIPE 1989 REPLACEMENT YES SYSTEM POWER
- 7. Description Of Work Reolace studs and nuts In vlpina flanges located between the RWST(2-1204-T4-001) and valve 2-1204-U4-260.
L L Tests Conducted:
NIA 0 Hydrostatic D Pneumatic E Nominal Operating Pressure E Other 0 Pressure N/A PSI Test Temp.
N/A
'F CERTIFICATE OF COMPUANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.
repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No.
, N/A Expiration Date NWA Signed 4//
4, I
/Z Date Z/
/
2 4-bOiwer opOwner's Designee, Title 3
I 7_
CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission Issued by the National Board of Boller and Pressure Vessel Inspectors and the State or Province of Georala and employed by Hartford Steam Boiler Inspection and Insurance Co of Connecticut of Hartford Connecticut have Inspected the components described In this Owner's Report during the period October 9,2002 to /
A.
1j, and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section Xi.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report Furthermore, neither the Inspector nor his employer shall be liabip In any manne;For any personal Injury or property damage or a loss of any kind arising from or connected with this Insepjj7C iI
.Commissions I
I
-at
-- i sp-ctop Date
/-50 6 Signature National Board, State, Province and Endorsements
ORIGINAL FORM NIS.2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xi Owner
- 2. Plant Southern Nuclear Operating Company Name 40 Inverness Center Parkway, Birmingham, AL Address Vogtie Electric Generating Plant Plant Waynesboro, GA 30830 Traveler #
02101 Date' November 20,2002 Sheet 1
of 1
Unit 2
MWO #
20202527 Repair Organization P.O. No., Job No., etc.
Plant Vogtle Address
- 3. Work Performed by Nuclear Operations Maintenance Name Address
- 4. Identification OS System N
1201 1 Reactor Coolant System
- 5.
(a) Applicable Construction Code ASME SectionIll 1971 Edition, Summer 72 Addenda, N/A Code Case (b)Applicable Edition of Section Xi Utilized For Repairs Or Replacements 19%
- 6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
Steam Westinghouse 1981 33 2-1201B6-04 1982 REPLACEMENT YES Generator
- 7.
Description Of Work Replace Hand Hole Cover at North side unner handhole (NSUH)
Tests Conducted:
Hydrostatic D Pneumatic [
Nominal Operating Pressure 0 MNA 3 Other 0 Pressure N/A PSI Test Temp.
NWA 2F CERTIFICATE OF COMPLIANCE.
We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code, Section Xi.
repair or replacement Type Code Symbol Stamp NWA Certificate o Authorization No.
NIA Expiration Date NIA igned Owners
__signee,_Ttle CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boller and Pressure Vessel Inspectors and the State or Province of Georgia and employed by Hartford Steam Boller InspectIon and Insurance Co of Connecticut of Hartford Connecticut have Inspected the components described In this Owner's Report during the period October 21, 2002 to 2
and state that to the best of my knowledge and belief, the Owner has perforrhed examinations and tests and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section Xi.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners ReporL Furthermore, neither the Inspector nor his employer shall be liable In any m ner for any personal Injury or property damage or a loss of any kind arising from or connected with this Commissions GA aoI Inspd tor's Signature
'National Board, State, Province and Endorsements Date
/
ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler#
02102 Owner Southem Nudear Operaffng Company Namne 40 Invemess CenterParkway, Birmngham, AL Vogtle Electrfc Generating Plant Date Sheet
- 2.
Plant Unit MWO #
11/15/02 I
Of I
2 20101045 Repair Organization P.O. No., Job No., etc.
Plant Vogffe Waynesboro, GA 30830 Address
- 3.
Work Performed by Nuclear Operations Maintenance Name Address
- 4.
Identification Of System 1204/SafetyInlection System
- 5.
(a) Applicable Construction Code ASME SEC III 1977
- Edition, Winter1977
- Addenda, N/A (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components Code Case
- 7.
Description Of Work Instaed rdcerent studs and nuts In prn-g flanges on doe spool 006-S-02.
- 8.
Test Conducted:
NIA iri Hydrostatic []
Pneumatic[
Nominal Operating PressureD Other []
Pressure NWA PSI Test Temp.'
- F CERTIFICATE OF COMPi-ANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl.
repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No.
N/A Expiration Date AVA Signed n(eaJ0; Date IA/
A cc2-Ownff or OwnerW
, seTitie CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georgia and employed by Harfford Steam Baler Insaecon end Insurance Co. of Connecticut of Hartford. Connecticbi have inspected the components described In this Owneres Report during the period 10/91202 to /
and state that to the best of my knowledge and belief, the Owner has perforrmed examinations and taken corrective measueg -described in this Owners Report In accordance with the requirements of the ASME Code, 'Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the'examinations and corrective measures described in this Owners Report.
Furthermore, neither the Inspector nor
- his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this In on.
Commissions G7A e2o3 Inspe or's Signature National Board, State, Province and Endorsements Date //I-11-o -
ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler #
02103 Y__: 1.
Owner Southem Nudear Operating Company Name 40 Inverness CenterParkway, Blminngham. AL
- 2.
Plant Vogtle Electic Generating Plant Date Sheet Unit MWO #
I Of I
2 20101045 Repair Organization P.O. No.. Job No., etc.
Plant Voade Waynesboro, GA 30830 Address
- 3.
Work Performed by Nuclear Operations Maintenance Name Address
- 4.
Identification Of System 1204/Safety Inection System S.
(a) Applicable Construction Code ASMESECII I 1977
- Edition, Mnter1977
- Addenda, N/A (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components Code Case NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO) 1204 PIPING PULLMAN N/A N/A 2K3-1204-006-01 1989 REPLACEMENT YES SYSTEM POWER PRODUCdS
- 7.
Description Of Work
_ntfemlcmnsusnntippnfagsn.p
_~p 19_2 -S-01_
S. Test Conducted:
NIA ii Hydrostatic [] Pneumatic[]
Nominal Operating Pressure[]
Other []
Pressure WA PSI Test Temp.
WA
'F CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl.
repair or replacement Type Code Symbol Stamp NIA Certificate of Authorization No.
Expiration Date EVA Signed
(_el Date Ofter or Owner Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by ihe national Board of boiler and Pressure vessel Inspectors and the State o Province of Georaa and employed by Hartford Steam Boler lnspecton and Insurance Co. of Connectcut of Harfford. Connecticut have Inspected the components described In this Owner's Report during the period _0/19i2 to
./
o
, and state that to the best of my knowledge and belief, the Owner has performed exarinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code,Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report.
Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this inspection.
- g.
Commissions 6A 9a-3 nspec6r's Signature National Board, State, Province and Endorsements Date
/f-/lal0;
-ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xi 0,,,.X Traveler #
I/3/
Cn Owner Southern Nuclear Operating Company Date January29, 2003 Name 40 Inverness Center Parkway, Birmingham, AL Sheet I
of I
Address
- 2.
Plant Voctle Electric Generating Plant Plant Waynesboro, GA 30830 Address
- 3. Work Performed by Nuclear Operations Maintenance Name Unit MWO #
2 20202563 Repair Organization P.O. No., Job No., etc.
Plant Voatle Address
- 4. Identification Of System 1205/ Residual Heat Removal
- 5. (a) Applicable Construction Code ASME Section III 1977 Edition, Winter 1977 Addenda, WVA Code Case (b)Appiicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PUMP Ingersoll-Dresser 087330 883 2-1205-P6-001 1993 REPLACEMENT YES
- 7. Description Of Work Installed replacement mechanical seal. This replacement mechanical seal Is a rotating spare: originall purchased under PO# 7015377 and received under MIR# 950303.
- 8. Tests Conducted:
WNA El Hydrostatic 0 Pneumatic 0 Nominal Operating Pressure CD Other 0 Pressure N/A PSI Test Temp.
N/A
'F CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.
repair or replacement Type Code Symbol Stamp N/A Certificatef Authorization No.
Do, N/A Expiration Date N/A Sl ne o
Owe'esignee, Title s
/
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boller and Pressure Vessel Inspectors and the State or Province of Georgia and employed by Hartford Steam Boller Inspection and Insurance Co of Connecticut of Hartford Connecticut have Inspected the components described In this Owner's Report during the period October 25, 2002 to.?,4-63
, and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any mann r for any personal Injury or property damage or a loss of any kind arising from or connected with this ins r
t 7 s/4>c>
Commissions r:,A,2o3 Inspectpf's Signature National Board, State, Province and Endorsements Date
,7 d 3
ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl I
Traveler #
02105 K2 1. Owner Southern Nudear Operating Company Name 40 Inverness Center Parkwav. Birminaham. AL Date Sheet Unit
- 2.
Plant Vogde Electfc Generating Plant 12/12/02 I
Of _
2 20202170 and 20202842 Repair Organization P.O. No., Job No., etc.
Plant Vooffe Waynesboro, GA 30830 Address MWO #
- 3.
Work Perfomied by Nuclear Operations Maintenance Name Address
- 4.
Identification Of System 1206 /Containment Spray System
- 5.
(a) Applicable Construction Code ASME SEC III 1977
- Edition, Winter 1977
- Addenda, N/A (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components Code Case NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO) 1206 PIPING PULLMAN N/A N/A 2K3-1206-001-01 1989 REPLACEMENT YES SYSTEM POWER PRODUCTS
- 7.
Description Of Work Instaffed repacement studs and nuts In piping fanges between pipag spools 001-S.04 and 001^S-05. The wrong arade of nuts were installed under MWO# 20202170 as documented by CR# 2002003338. The correct grade nuts were then Installed under MWO# 20202842.
- 8.
Test Conducted:
NWA Ir Hydrostatic 1=1 Pneurmatic I]
Nominal Operating Pressure []
Other E]
Pressure NWA PSI Test Temp.
WA CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code,Section XI.
repair or replacement Type Code Symbol Stamp N/A Certificate ot.Authorization No.
N/A Expiration Date N/A Signed at.-,
I.4 d e-Date
-o em or Owner's Deignee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georyia and employed by Hartfford Steam Boflerlnsoedon and Insurance Co. of Connecdcut of Hartford. Connecticut have Inspected the components described In this Owner's Report during the period _0f2602 to
/;Z - /3 - OA and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME
- Code,Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this inspection.
1_*/,?
Conmmissions Inspecto7M Signature National Board, State, Province and Endorsements K1' Date
/2-13 -a 2
ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xi Traveler #
02108
- 1.
Owner Southern Nudear Operating Company Name 40 Inverness CenterParkway, Blnringham, AL
- 2.
Plant Vogffe Electdc Generaftng Plant Date 12102/02 Sheet II Of I
Unit 2
Waynesboro. GA 30830 MWO #
20102529 Address Repair Organization P.O. No., Job No, etc.
Plant Vogue
- 3.
Work Performed by Nudear Operations Maintenance Name Address
- 4.
Identification Of System 1201 /Reactor Coolant System
- 5.
(a) Applicable Construction Code ASME SEC 10 1971
- Edition, Wnter 1972
- Addenda, N/A (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components Code Case NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
SAFETY CROSBY VALVE N56964-00-0041 N/A 2PSV8010A 1976 REPLACEMENT YES VALVE j
GAGE CO.
- 7.
Description Of Work Instaled two redacenment nuts on the vaAes Il7etflange.
B. Test Conducted:
K)
N/AED Hydrostatic [] Pneurnatic[
Norninal Operating PressureiX]
Other [D Pressure N/A PSI Test Temp.
NWA
'F CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENvT conforms to the rules of the ASME Code, Section Xl.
repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No.
AVA Expiration Date N/A Signed 6
-f
-J-Ze Date zZe
.2e hVJ Owne or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid conmnission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georda and employed by Hartford Steam Bo"erlnspection and Insurance Co. of Connecticut of Hartfordi Connecticut have Inspected the components described in this Owner's Report during the period 11_0102 to a.1-.,... Cog and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements' of the :ASME
- Code, Section Xi.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report.
Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Inspection.
Commissions eAnoaJ Inspectovs Signature National Board, State, Province and Endorsements IDate 12 C
ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xi i'
1.
Owner Southern Nuclear Operating Company Name 40 Inverness CenterParkway, Binningham, AL Date
- 2.
Plant Vogtle Eletdic Generating Plant Waynesboro, GA 30830 Sheet Unit MWO #
Traveler #
02109 12/V2102 1
Of, I
2 20102529 Repair Organization P.O. No., Job No., etc.
Plant Vogtie Address
- 3.
Work Performed by Nuclear Operations Maintenance Name Address
- 4.
Identification Of System 1201 /Reactor Coolant System
- 5.
(a) Applicable Construction Code ASMESEC la 1971
- Edition, Winter 1972 A
(b)Applicabie Edition of Section Xi Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components addenda N/A Code Case NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
SAFETY CROSBY VALVE N56964-00-0036 N/A 2PSV8010B 1976 REPLACEMENT YES VALVE
& GAGE CO.
- 7.
Description Of Work Installed two rerLacement nuts on the valve's Inlet flance.
S.
Test Conducted:
Hydrostatic D Pneumatic[]
Nominal Op VA []
Other 5 Pressure N/A PSI Ti erating PressureI est Temp.
NWA F
CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xi.
repair or replacement Type Code Symbol Stamp N V/A Certificate olAuthorization No.
/7 N/A Expiration Date N/A Signed ///X O
/
Ne<*
I: e oI Date /2/ Z
/6 a
t Oyoer or Owner's WssIgnee, il CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Geormia and employed by Harfobrd Steam Bolter inspection and Insurance Co. of Connectcut of Hartford Connecticut have inspected the components described In this Owner's Report during the period _11'5A2 to A2-z-C:2 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements - of the. ASME
- Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report.
Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Inspection.
insp 8
=
a Commissions GA ?x ninpep(or's Signature National Board, State, Province and Endorsements Date
/I2-
-0.2
ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler #
02110 Y__/ 1.
Owner Southem Nudear Operating Company Date 1t/20/02 Name 40Invemess Center Parway.Birrrngham AL Sheet I
Of I
- 2.
Plant Vogile Electdc Generating Plant Unit 2
20202762 Repair Organization P.O. No., Job No., etc.
Waynesboro, GA 30830 MWO #
Address
- 3.
Work Perfonned by Nuclear Operations Maintenance Plant Vogtle Name Address
- 4.
Identification Of System 1201 /Reactor Coolant SYstem
- 5.
(a) Applicable Construction Code ASME SEC Il 1977
- Edition, Winter 1977
- Addenda, 16448 (b)Applicable Edition of Section Xi Utilized For Repairs Or Replacements 1989 Code Case
- 6.
Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL
- REPAIRED, ASMECCODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO.
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO) 1201 PIPING SOUTHWEST 38322 N/A 2X6AB17-134 1985 REPLACEMENT YES SYSTEM FABRICATING &
2X6AB17-135 WELDING dsa
- 7.
Description Of Work Instated repacement suare head set screw andlam nut on supprt coffarssoclated wfth 2PSV-8010A.
B. Test Conducted:
N/A E Hydrostatic[]
Pneumatic[] - Norninal Operating Pressure[]
Other []
- NWA CERTIFICATE OF COMPIUANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl.
repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No.
IVIA Expiration Date N/A Signed 26 Date a/
c 7
CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georola and employed by Hartford Steam Boilerinspecton andinsurance Co. of Connecicut of Hartford. Conneccic have inspected the components described in this Owner's Report during the period 1118/2 to a..//-o.&nQ and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements. of the ASME
- Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this inspection.
Commissions
(/106 InspectoV Signature National Board, State, Province and Endorsements I
Date
//-,7 /- e A
ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions of The ASME Code Section Xi K>l 1.
Owner Southern Nuclear Operating Company Name 40 Inverness Center Parkway, Bimingham, AL
- 2.
Plant Vogde Electic Generaftng Plant Waynesboro, GA 30830 Address
- 3.
Work Performed by Nudear Operations Maintenance Name Date Sheet Unit MWO #
Traveler #
02111 11f2W12 I
Of I
2 20202762 Repair Organization P.O. No., Job No., etc.
Plant Vogile Address
- 4.
Identification Of System 1201 IReactor Coolant System
- 5.
(a) Applicable Construction Code ASME SEC I11 19Z7
- Edition, Winter 1977
- Addenda, 1644-8 Code Case (b)Applicable Edition of Section Xi Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL
NO.'
IDENTIFICATION BUILT REPLACEMENT (YES OR NO) 1201 PIPING SOUTHWEST 38320 N/A 2X6AB17-134 1985 REPLACEMENT YES SYSTEM FABRICATING &
2X6AB17-135 W EL D)ING CO.
- 7.
Description Of Work Instaied repLacementsauare headset screw andlam nut on suypoit colar assocIated with 2PSV-80I0B.
S.
Test Conducted:
Hydrostatic E] PneumaticE]
Nominal Operating Pressure []
N /A E[)
Other []
N/A OF CERTIFICATE OF COMPIUANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl.
repair or replacement Type Code Symbol Stamp N/A Certificate Authorzation No.
NA Expiration Date IN/A Signed eq code Date Cpitier or Owner"Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georcia and employed by Harford Steam Boler Insnecdon and Insurance Co. of Connectcut of Hartford. Connecticut have Inspected the components described In this Owner's Report during the period I 1V&"02 to
//-dy@,2
, and state that to the best of mny knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements. of the ASME
- Code,Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report.
Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Inspection.
A
/~t
/,
Commissions GAME InspectorJs Signature National Board, State, Province and Endorsements Date J /-,? / -,
g ;
- O:GUGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xi K._' 1. Owner Traveler #
02112 1210 2.2 Southern Nuclear Operafing Company Name 40 Inverness CenterParkway, Birmingham, AL Date Sheet I
Of I
- 2.
Plant Vogue Electic.Generating Plant Unit 2
Waynesboro, GA 30830 MWO #
20202821 and 20200142 Address Repair Organization P.O. No*, Job No., etc.
- 3.
Work Performed by Nuclear Operations Maintenance Narne Plant Vogfe Address 1208IChenical and Volume ControlSystem
- 4.
Identification Of System C.
Jaj Applicable Construction Code ASME SEC Il 1974
- Edition, Summer 1975
- Addenda, N/A (b)Applicable Edition of Section Xi Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components Code Case NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
VALVE DRESSER H218ABH N/A 2-1208-U4-033 1982 REPAIR YES INDUSTRIES INC.
- 7.
Description Of Work A seal weld was completed on this valve under Traveler# 02100 and MWO# 20200142. The seal weld was found unacceptable during the VT-2 examination as documented on CR# 2002003297. The seal weld was removed and then comaleted successfulv under Traveler#02112 and MWO# 20202821.
B.
Test Conducted:
NIA D Hydrostatic j]
Pneurnatic[
Nominal Operating PressureF[Ir Other []
Pressure NWA PSI Test Temp.
NIA CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPAIR conforms to the rules of the ASME Code,Section XI.
repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No.
N/A Expiration Date N/A Signed ew..
>r
.wafee' d4 ZleT 1 Date A'
e c7~2 Owndr or OwnereDesignee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georaia and employed by Hartford Steam Bofer Inspection and Insurance Co. of Connecticut of Hartford Connecticut have Inspected the components described In A this Owner's Report during the period.10/1&/2 to and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code,Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report.
Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Inspection.
t Cormmlssions 6-An93 Insifector's Signature National Board, State, Province and Endorsements K1>D ate ejJz 73 0'
UIiKINMAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler #
02114
- 1.
Owner Southern Nuclear Operating Company Name 40 Inverness CenterParkway. Birmingham. AL Date Sheet Unit MWO #
- 2.
Plant Vogffe Electric Generating Plant Waynesboro, GA 30830 Address
- 3.
Work Performed by Nuclear Operations Maintenance Name 0220/03 1
Of I
2 20103571 Repair Organization P.O. No., Job No., etc.
Plant Vogffe Address
- 4.
Identification Of System 1204/Safety Injection System
- 5.
(a) Applicable Construction Code ASME SEC IX 1971
- Edition, Winter 1977
- Addenda, N/A (b)Applicable Edition of Section Xi Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components Code Case NAME OF COMPONENT NAME OF
. MANUFACTURER MANUFACTURER NATIONAL I SERIAL BOARD NO.
NO.
OTHER IDENTIFICATION YEAR BUILT
- REPAIRED, REPLACED OR REPLACEMENT ASME CODE STAMPED (YES OR NO) 1204 PIPING PULLMAN N/A N/A 2K5-1204-187-02 1989 REPLACEMENT YES SYSTEM POWER
, PRODUCTS
- 7.
Description Of Work Installed replacement studs and nuts In c/dna flanges between vice spool 273-S-01 and the Refuefing Water Storage Tank 2-1204-T4-001.
- 8.
Test Conducted:
N/A E]
Hydrostatic E] Pneumatic[
Nominal Operating PressureE]
Other a Pressure NIA PSI Test Temp.
N/A
- F CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code,Section XI.
repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No.
A N/A Expiration Date N/A Sineer or Owner's esignee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Geormia and employed by Hartford Steam Botfer Inspection and Insurance Co. of Connecticut of Hartford, Connecticui have inspected the components described In this Owner's Report during the period 12(06/02 to,2-.4-0o3
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described* in this Owners Report In accordance with the requirements of the ASME
- Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report.
Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Inspecti n.Of7 insp~n 1t-v Commissions GA 2i03 Inspector's ignature National Board, State, Province and Endorsements Date
FORM NIS-2 OWNER'S REPOQSJIQ1INALPPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler #
03036 March 3,2004
- 1. Owner Southem Nuclear Operating Company Date Name 40 Invemess Center Parkway, Birningham, AL Sheet Address
- 2. Plant Vogtle Electric Generating Plant Unit Plant Wavnesboro, GA 30830 MWO #
I of 5
Address
- 3. Work Performed by Nuclear Operations Maintenance 2
20301925 Repair Organization P.O. No., Job No., etc.
Plant Vogtle Name Address 4.
5.
Identification Of System 12081 Chemical Vol (a) Applicable Construction Code ASME Section III 1977 Edition, (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989 Identification Of Components Repairs Or Replacement Components
'time Control System Winter 1977 Addenda, NMA Code Case 6.
NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
VALVE FISHER 5924552 N/A 2TV-0381A 1977 REPLACEMENT YES CONTROLS
- 7. Description Of Work Replace valve plug
- 8. Tests Conducted:
Hydrostatic a Pneumatic 0 Nominal Operating Pressure 0 NIA 0 Other 0 Pressure NIA PSI Test Temp.
- F CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.
repair or replacement Type Code Symbol Stamp NIA Certificate fyth zation No NIA Expiration Date NIA S igne%$"'
s/
/aZf Z
4 O;ner or Owner' esignee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Georqia and employed by Hartford Steam Boiler Inspection and Insurance Co of Connecticut of Hartford Connecticut have Inspected the components described In this Owner's Report during the period August 25,2003 to
.3-?-Od oi
, and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code,Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this ins 2ion;3 f-v tF Commissions rA 7 3 Inspector' Signature National Board, State, Province and Endorsements D ate
ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler #
03074
- 1.
Owner Southern Nuclear Operating Company Name 40 Invemess Center Parkway, Birmingham, AL Vogde Electric Generating Plant Waynesboro, GA 30830 Date Sheet
- 2.
Plant Unit 09/24/03 j
Of I
2 20302241 Repair Organization P.O. No., Job No., etc.
Plant Vogle MWO #
Address
- 3.
Work Performed by Nuclear Operagons Maintenance Name Address
- 4.
Identification Of System 1201 /Reactor Coolant System S.
(a) Applicable Construction Code ASME SEC 11 1971
- Edition, Summer 1972 Addenda, NIA Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED.
ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO.
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
REACTOR COMBUSTION 7372 22004 2-1201-V6-001 1979 REPLACEMENT YES VESSEL ENGINEERING
~IN C.
- 7.
Description Of Work Replaced male flange on reactor vessel. penetration #75. thermocouple Instrument port column assembly.
\\
S.
Test Conducted:
N/A DI Hydrostatic E Pneumatic[]
Nominal Operating Pressureoj)3 Other E]
Pressure N/A PSI Test Temp.
NlA OF CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Geormia and employed by Hartford Steam Boiler Inspection and Insurance Co. of Connecticut of Hartford. Connecticut have inspected the components described In this Owner's Report during the period 08/12V03 to 9Gu i a and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report in accordance with the requirements of the ASME
- Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this inspection.
_i Commissions GA 9 C'S Inspect's ignature National Board, State, Province and Endorsements Date 75eP
'3
ORIGINAL JFORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Owner Southern Nuclear Operating Company Name 40 Inverness Center Parkway, Birmingham. AL
- 2.
Plant Vogde Electric Generating Plant Waynesboro, GA 30830 Address
- 3.
Work Performed by Nudear Operations Maintenance Name Date Sheet Unit MWO #
Traveler #
03075 09/23103 I
Of I
2 20302242 Repair Organization P.O. No., Job No., etc.
Plant Vogte Address
- 4.
Identification Of System 1201 IReactor Coolant System
- 5.
(a) Applicable Construction Code ASME SEC Ill 1971
- Edition, Summer 1972 Addenda, WJA Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
REACTOR COMBUSTION 7372 22004 2-1201-V6-001.
1979 REPLACEMENT YES VESSEL ENGINEERING
_INC.
- 7.
Description Of Work Replaced male flange on reactor vessel. penetraffon #78. thermocouple Instrument port column assembly.
- 8.
Test Conducted:
NIA U Hydrostatic E Pneumaticfl Nominal Operating Pressurenx Other n Pressure NIA PSI Test Temp.
N/A CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Geormia and employed by HartfordSteam Boiler nsrection andlnsurance Co. of Connecticud of Hartford. Connecticut have inspected the components described in this Owner's Report during the period 08112103 to 51-st*.O3
. and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report in accordance with the requirements of the ASME
- Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this inspection.
A Zkz 7
Z6 Commissions GAi z76 C
Inspec)6r's Signature National Board, State, Province and Endorsements Date ti-;tS-,7 3
IORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xi
- 1.
Owner Southern Nudear Operating Company Name 1
40 Invemess CenterParkway, Birringham. AL
- 2.
Plant Vogile Electric Generating Plant Waynesboro, GA 30830 Address
- 3.
Work Performed by Nuclear Operations Maintenance Name Date Sheet Unit MWO #
Traveler #
03080
- 1AI04M3 I
Of 2
20302565 Repair Organization P.O. No., Job No., etc.
Plant Vogote Address
- 4.
Identification Of System 1201 /Reactor Coolant System S.
(a) Applicable Construction Code ASMESECIII 1971. Edition, Summer 1972 Addenda, N/A Code Case (b)Applicable Edition of Section Xi Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
REACTOR COMBUSTION 7372 22004 2-1201-V6-001 1979 REPLACEMENT YES VESSEL ENGINEERING INC.
- 7.
Description Of Work Instaffed a Core Exit Thermocoupfe (CET) Canopy Seal Clamp AssemblV (CSCA) on reactor vessel venetration #77 due to lower canopy seat weld leakage as Identifed by CR# 2003002385. The clamp was evaluated and Installed in accordance with DCP 03-V2N0022.
J S.
Test Conducted:
N/A [
Hydrostatic []
Pneumatic[]
Nominal Operating Pressure [Z]
Other ]
Pressure N/A PSI Test Temp.
N/A CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl.
repair or replacement Type Code Symbol Stamp N/A Certificate of Audorizatip No.
NMA Expiration Date NMA Signed
/
- 62.
Team Leader Date 1/2. ct ¢3 Owner of Owner's Desegne6* Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Geormia and employed by Hartford Steam BoierInspecion and Insurance Co. of Connecticut of Hartford, Connecticut have inspected the components described in this Owner's Report during the period 08&31i03 to 4f
$ 3
. and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspection.
Y~f/X4 <'
Commissions GA Z0 Inspectlr'sSigniature National Board, State, Province and Endorsements v
Date it-r-e03
FORM NIS-2 OWNER'S R IafJEJN AIR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xi Traveler#
03112 December 30,2003
- 1. Owner Southern Nuclear Operating Company
. Name 40 Inverness Center Parkway, Birmingham, AL Address
- 2.
Plant Voctle Electric Generating Plant Date Sheet I
of I
Plant Waynesboro, GA 30830 Unit MWO#
2 20303012 Address
- 3. Work Performed by Nuclear Operations Maintenance Repair Organization P.O. No., Job No., etc.
Plant Vogtle Name Address
- 4.
Identification Of System 1217) Auxilliary Compon
- 5.
(a) Applicable Construction Code ASME Section it 1977 Edition, (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components ent Cooling Water System Winter 1977
- Addenda, N/A Code Case NAME NAME MANUFACTURER NATIONAL
- REPAIRED, ASME CODE OF
,OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO.
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO) 1217 PIPING PULLMAN N/A N/A 2K3-1217-186-01 1988 REPLACEMENT YES SYSTEM POWER PRODUCTS
- 7.
Description Of Work RePlace 2" piping flange and elbow.
- 8.
Tests Conducted:
Hydrostatic E Pneumatic 0 Nominal Operating Pressure 0 NIA E Other 0 Pressure NIA PSI Test Temp.
N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code, Section Xi.
repair or replacement Type Code Symbol Stamp N/A Certificate Authorization Np7 N/A Expiration Date NIA Si g
nerrw Desgon Date ee Ti4tl CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Georgia and employed by Hartford Steam Boiler Inspection and Insurance Co of Connecticut of Hartford Connecticut have Inspected the components described in this Owner's Report during the period November 10, 2003 to 1-6.04 and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any mayner for any personal Injury or property damage or a loss of any kind arising from or connected with this inspection.
X/
inspection.,,,
<,t Commissions GA ;02 ln' lspctor's Signature National Board, State, Province and Endorsements Date
p@iGif*4kL FORM NIS-2 OWNER'S REPQ OR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler#
03113 December 31, 2003
- 1. Owner Southern Nuclear Operating Company Name 40 Inverness Center Parkvay, Birmingham, AL Address
- 2. Plant Vogtle Electric Generating Plant Plant Waynesboro, GA 30830 Address Date 11 Sheet I
of I
Unit MWO #
2 20303012 Repair Organization P.O. No., Job No., etc.
- 3. Work Performed by Nuclear Operations Maintenance Name Plant Vogtle Address
- 4. Identification Of System 1217 / Auxilliary Component Cooling Water System
- 5. (a) Applicable Construction Code ASME Section III 1977 Edition, (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6. Identification Of Components Repairs Or Replacement Components Winter 1977 Addenda, N/A Code Case NAME NAME MANUFACTURER NATIONAL
- REPAIRED, ASME CODE OF
.OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO.
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE SOUTHERN N/A NA V2-1217-186-H003 2003 REPLACEMENT NO SUPPORT NUCLEAR OPERATING CO.
- 7. Description Of Work Replace formed plate restraint
- 8. Tests Conducted:
Hydrostatic El Pneumatic E Nominal Operating Pressure 0 N/A ED Other Al Pressure N/A PSI Test Temp.
NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl.
repair or replacement Type Code Symbol Stamp NIA Certificate oyAuthprizatiorLNo../5' N/A Expirat In Date N/A Sign
/
,nt*ect C-Date 9(c S
C 2
d S
wner or OH{er's Designee. Title I
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Georgia and employed by Hartford Steam Bol/erinspection and Insurance Co of Connecticut of Hartford Connecticut have inspected the components described In this Owner's Report during the period November 10, 2003 to /-c-oij
, and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Commissions
&4 2o1 Ins ctor's Signature National Board, State, Province and Endorsements Date
/ -6;'d/
FORM NIS-2 OWNER'S Q9 1
@R REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler #
03115 Date May 10, 2004
- 1. Owner Southern Nuclear Operating Company
- 2.
Plant Name 40 Inverness Center Parkway, Birmingham, AL -
Sheet Address Vogtle Electric Generating Plant Unit Plant Waynesboro, GA 30830 MWO #
I of 2
"A.-f~
'11!jvi!~2 Address
- 3.
Work Performed by Nuclear OperatIons Maintenance Name 20202059
. Repair Organization P.O. No., Job No., etc.
Plant Vogtle Address
- 4. Identification Of System 1204 1 Safety II
- 5.
(a) Applicable Construction Code ASME Section Ill 1977 Edition, (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components Ijection System Winter 1977
- Addenda, NIA Code Case NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPING PULLMAN N/A N/A 2K7-1204-037-01 1989 REPLACEMENT Yes SYSTEM POWER PRODUCTS
- 7. Description Of Work A l' branch weld connection was made to 1204037 pinq ngPer DCP 00-V2N0041 and WPCS 030644
- 8.
Tests Conducted:
Hydrostatic C Pneumatic 0 Nominal Operating Pressure E N/A a Other 0 Pressure NIA PSI Test Temp.
NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.
repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No.
N/A Expiration Date N/A Signed dot_
or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Georgia and employed by Hartford Steam Boller Inspection and Insurance Co of Connecticut of Hartford Connecticut have inspected the components described In this Owner's Report during the period December 16, 2003 to 11-n
, and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code,Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Commissions CA ;°3 Inspectqf(s Signature National Board, State, Province and Endorsements Date__
ORK3NAL FORM NIS-2 OWNER'S REPO FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xi
- Traveler #
04008 May 10, 2004
- 1. Owner Southern Nuclear Operating Company Date Name 40 Inverness Center Parkway, Birmingham, AL
. Sheet Address Vogtie Electric Generating Plant Unit Plant Waynesboro, GA 30830 MWO #
- 2.
Plant I
of 4
2 20303104 Repair Organization P.O. No., Job No., etc.
Plant Voctle Address
- 3. Work Performed by Nuclear Operations Maintenance Name Address
- 4.
Identification Of System 1201 IReactor
- 5. (a) Applicable Construction Code ASME Section III 1977 Edition, (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6. Identification Of Components Repairs Or Replacement Components Coolant System WInter 1977 Addenda, N/A Code Case NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE PULLMAN N/A N/A V2-1201-030-H6157 1989 REPLACEMENT Yes SUPPORT POWER PRODUCTS
=
- 7. Description Of Work Snubber PSA-3. serial 24700 was retIaced with a PSA-3 snubber, serial #29745 to support surveillance testing.
- 8. Tests Conducted:
NIA ED Hydrostatic D Pneumatic 0 Nominal Operating Pressure 0 Other D Pressure N/A PSI Test Temp.
NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.
repair or replacement Type Code Symbol Stamp NIA Certificate of Authorization No.
NA Expiration Date NIA Signed /
v Owngr Owners Designee.' Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Georqia and employed by Hartford Steam Boiler Inspection and Insurance Co of Connecticut of Hartford Connecticut have Inspected the components described in this Owner's Report during the period January 30, 2004 to S
and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section Xi.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this C_
Commissions cA,2V Inspe or's Signature National Board, State, Province and Endorsements Date
__-__3-d_
I OHIUINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl
- 1.
Owner Southem Nuclear Operating Company Date Name 40Invemess CenterParkway. Bim7ingham, AL
. Sheet
- 2.
Plant Vogtfe Electic Generating Plant Unit Waynesboro, GA 30830 MWO #
Traveler #
04009 05AJ71/V4 I
Of I
20303105 Repair Organization P.O. No., Job No., etc.
Plant Vogne Address
- 3.
Work Perforried by Nuclear Operations Maintenance Name Address
- 4.
Identification Of System 1201 IReactor Coolant System
- 6.
(a) Applicable Construction Code ASME SEC I11 1977 Edition, Winter 1977 A
(b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components
- ddenda, N-249-1 Code Case
- 7.
Description Of Work SnubberAD-51. seial # 151 was replaced with AD-151, senal #556 to support surveillance testino.
- 8.
Test Conducted:
Hydrostatic [:
Pneumatic[
Nominal Operating PressureQ N/A []
Other EJ Pressure N/A PSI Test Temp.
NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xi.
repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No.
N/A Expiration Date N/A Signed Team Leader Date Ov~er or Owner's Designee. Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Geormia and employed by Hartford Steam Bolfer Inspection and Insurance Co. of Connecticut of Hartford, Connecticut have inspected the
. components described In this Owner's Report during the period.01130/04 to
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME
- Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report.
Furthermore, neither the Inspector nor his employer shall be liable In any manygr for any personal Injury or property damage or a loss of any kind arising from or connected with this t Commissions GA a03 Ins r's Signature National Board, State, Province and Endorsements Date i
I ORIGINAL --
FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI
- 1.
Owner
- 2.
Plant Southern Nuclear Operating Company Name 40 Invemess Center Parkway, BirrnngnaM, AL Vogtie Electric Generating Plant Waynesboro, GA 30830 Date Sheet Unit MWO #
Traveler #
04012 05/10/04 I
Of I
-Z 20303108 Repair Organization P.O. No., Job No., etc.
Plant Voatle Address
- 3.
Work Performned by Nuclear Operations Maintenance Name Address
- 4.
Identification Of System 1201 /IReactor Coolant System
- 5.
(a) Applicable Construction Code ASMESECIII 1977
- Edition, Winter1977 A
(b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components
- ddenda, N-249-1 Code Case NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE SUPPORT PULLMAN N/A N/A V2-1201-064-H628 1989 REPLACEMENT YES POWER PRODUCTS
- 7.
Description Of Work SnubberAD-1603. serial# 81 was rerlaced with AD-1601. serial# 164 to supportsurveillance testing.
- 8.
Test Conducted:
Hydrostatic El Pneumaticfl Nominal Operating PressureEl NIA (
Other [
Pressure N/A PSI Test Temp.
'F CERTIFICATE OF COMPUANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl.
repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No.
N/A Expiration Date NIA Signed
/* $D-esig Team Leader Date
_/
£ownerg%.O)wn~s Designee. Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Geormia and employed by Hartford Steam Boiler Insoection and Insurance Co. of Connecticut of Hartford. Connecticut have inspected the components described In this Owner's Report during the period 01fJ0104 to and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report.
Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this
_ns_
Commissions gA-70?
Insp tor's Signature National Board, State, Province and Endorsements Date 54r,64/
I ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xi
- 1.
Owner Southem Nudear Operating Company Date
- 2.
Plant Name 40 Inverness Center Parkway, Birmingham, AL Vogtle Electric Generafing Plant Waynesboro, GA 30830
- Sheet Unit MWO #
Traveler #
04014 05107/34 1
Of I
203 03121 0n/6f 20303121 Address
- 3.
Work Performed by Nuclear Operations Maintenance Name Repair Organization P.O. No., Job No., etc.
Plant Vogtte Address
- 4.
Identification Of System 1204/Safety Injection System
- 5.
(a) Applicable Construction Code ASME SEC 11 1977
- Edition, Wnter 1977
- Addenda, N-249-1 Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE SUPPORT PULLMAN N/A N/A V2-1204-030-H009 1989 REPLACEMENT YES POWER PRODUCTS I_l
- 7.
Description Of Work SnubberAD-7. seial# 1135 was replacedwith AD-7 serial# 611 to supportsurveiance testing.
- 8.
Test Conducted:
Hydrostatic M Pneumatic[]
Nominal Operating PressureEl N/A [3 Other E5 Pressure NIA PSI Test Temp.
N/A
'F CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl.
repair or replacement Type Code Symbol Stamp NIA Certificate of Aut orization No.
N/A Expiration Date N/A Signed g
/
/
s
/
Team Leader Date or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georgia and employed by Hartford Steam Bolfer Inspecton and Insurance Co. of Connecticut of Hartford. Connecticut have inspected the components described In this Owner's Report during the period 0130D04 to.
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME
- Code, Section Xi.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report.
Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Cornmrissions GA O. 3 nsp r's Signature National Board, State, Province and Endorsements Date S-/4 -.
v
FORM NIS-2 OWNER'S REiK A R
EPLEPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler#
Am p
/
Southem Nuclear Operating Company Date May 10, 2004
/
Name 40 Invemess Center Parkway. Birmingham, AL Sheet 1
of I
- 1. Owner E
Address
- 2. Plant Vogtle Electric Generating Plant Unit Plant Wavnesboro, GA 30830 MWO #
2 20303122 Address Repair Organization P.O. No., Job No., etc.
- 3. Work Performed by Nuclear Operations MaIntenance Plant Vogtle Name Address
- 4. Identification Of System 12041 Safety Injection System
- 5.
(a) Applicable Construction Code ASME Sectlon Ill 1977 Edition, WiVnter 1977 Addenda, N-249-1 Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE PULLMAN A1 V21 204-030-H 012 1989 REPLACEMENT Yes SUPPORT POWER PRODUCTS S
S ________
A A
.1 S
S &
- 7.
Description Of Work SnubberAD-73, serialnumber#1207 was replaced with AD-73 serial#421 tosupportsurveliance testing.
- 8.
Tests Conducted:
Hydrostatic 0 Pneumatic 0 Nominal Operating Pressure 0 NIA El Other 0 Pressure NWA PSI Test Temp.
N/A F
CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.
repair or replacement Type Code Symbol Stamp NIA Certificate of A thorization No.
N/A A
Expiration Date NWA Signed Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Georgia and employed by Hartford Steam Bolier Inspection and Insurance Co of Connecticut of Hartford Connecticut have Inspected the components described In this Owner's Report during the period January 30. 2004 to i
and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this In e
/a-1ziCommissions CA ;03 Insutor's Signature National Board, State, Province and Endorsements D ate
I UNIIUI IN/AL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler #
04016 05107,04
- 1.
Owner Southern Nuclear Operating Company Date Name 40 Invemess Center Parkway. Birmingham, AL
, Sheet
- 2.
Plant VogUe Electric Generating Plant Waynesboro, GA 30830 Unit l
Of I
-'IZ %MV/17/C4 20303124 Repair Organization P.O. No., Job No., etc.
MWO #
Address
- 3.
Work Perforned by Nuclear Operations Maintenance Name
- .I Plant Vogue Address
- 4.
Identification Of System 1204/Safety Injection System
- 5.
(a) Applicable Construction Code ASME SEC III 1977
- Edition, Wnter 1977
- Addenda, N-249-1 (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components Code Case NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE SUPPORT PULLMAN N/A N/A V2-1204-126-H601 1989 REPLACEMENT -
YES PO WER PRODUCTS
- 7.
Description Of Work SnubberAD-5503. serial #325 was replaced with AD-5503. serial #430 to support surveillance testing.
S.
Test Conducted:
Pneumatic]
Nominal Operating Pressure]
NIA [0 Other ]
Pressure NiA PSI Test Temp.
NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl.
repair or replacement Type Code Symbol Stamp NIA Certificate of thorization No.
NIA Expiration Date NIA Signed Team Leader Date
- 7/z 5Z-
'Owpdir or Owner's Designee, TitleI f'IOF I.,
0 bi CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Geonzia and employed by Hartford Steam Bolfer Inspection and Insurance Co. of Connecticut of Hartford. Connecticut have inspected the components described in this Owner's Report during the period 0-V30104 to f and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME
- Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report.
Furthermore, neither the Inspector nor his employer shall be liable In any man er for any personal Injury or property damage or a loss of any kind arising from or connected with this MSpM,
24, Commissions CA to Inspeefor's Signature National Board, State, Province and Endorsements Date 5-/4-t~'/
I ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI
- 1.
Owner Southern Nuclear Operating Company Date Name 40 Inverness Center Parkway, Birmingham, AL
. Sheet
- 2.
Plant Vogue Electric Generating Plant Waynesboro, GA 30830 Address Traveler #
04019 05/10104 I
Of I
20303127 Repair Organization P.O. No., Job No., etc.
Plant Vogue Unit MWO#
- 3.
Work Performed by Nuclear Operations Maintenance Name Address
- 4.
Identification Of System 1208 /Chemical and Volume Control System
- 5.
(a) Applicable Construction Code ASME SEC IDl 1977
- Edition, Winter 1977
- Addenda, N-249-1 Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL
- REPAIRED, ASMIE CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO.
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE SUPPORT PULLMAN N/A N/A
. V2-1208-008-H018 1989 REPLACEMENT YES POWER PRODUCTS
- 7.
Description Of Work Snubber AD-1603. serial # 133 was replaced with AD-1603. serial #657 to support surveillance testina_
- 8.
Test Conducted:
PneumaticE5 Nominal Operating Pressurer5 N/A [']
Other a Pressure N/A PSI Test Temp.
N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code,Section XI.
repair or replacement Type Code Symbol Stamp N/A Certificate of Aidhorzation No.
/
N/A Expiration Date NIA Signed
/v -
Team Leader Date Owner gfOwner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georgia and employed by HartfordSteam BolerInspection and Insurance Co. of Connecticut of Hartford. Connecticut have Inspected the components described in this Owner's Report during the period
- 011301V4 to o
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report in accordance with the requirements of the ASME
- Code,Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report.
Furthermore, neither the Inspector nor his employer shall be liable In any manner or any personal Injury or property damage or a loss of any kind arising from or connected with this Commissions CA 2,3 Inspector's Signature National Board, State, Province and Endorsements Date 5.1;7 o/
I OIRGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI
- 1.
Owner Southem Nuclear Operating Company Name 40 Invemess Center Parkway, Birmingham, AL
- 2.
Plant Vogtle Electric Generating Plant Waynesboro. GA 30830 Address
- 3.
Work Performed by Nudear Operations Maintenance Name Date Sheet Unit MWO#
Traveler #
04022 05107)04 I
Of I
-1 2 Wpm is ii/710+/-
20303132 Repair Organization P.O. No., Job No., etc.
Plant Vogtie Address 4.' Identification Of System 1301 /Main Steam System
- 6.
(a) Applicable Construction Code ASME SEC IXI 1977
- Edition, Wnter 1977 (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacemnents 1989
- 6.
Identification Of Components Repairs Or Replacement Components
- Addenda, N-249-1 Code Case NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE SUPPORT PULLMAN N/A N/A V2-1301-107-H003 1989 REPLACEMENT YES POWER PRODUCTS
- 7.
Description Of Work Snubber AD-12501. serial #52 was replaced with AD-12501. serial #21 to support survefilance testinq.
- 8.
Test Conducted:
Hydrostatic n Pneumatic[
Nominal Operating Pressurerl N/A []
Other E Pressure N/A PSI Test Temp.
N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code,Section XI.
repair or replacement Type Code Symbol Stamp NMA Certificate of Authorization No.
N/A Expiration Date N/A Signed V
Team Leader Date Owner Owner'esignee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Geormia and employed by Hartford Steam Bollerinspegion and Insurance Co. of Connecticut of Hartford. Connecticut have inspected the components described in this Owner's Report during the period 01430,04 to
/{-.
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME
- Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report.
Furthermore, neither the Inspector nor his employer shall be liable In any ran2,r for any personal Injury or property damage or a loss of any kind arising from or connected with this n p//71 Commissions GA Ao3 Insp r's Signature National Board, State, Province and Endorsements Date_____________
I ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xi Traveler #
04023 0510.V4
- 1.
Owner Southern Nuclear Operating Company Name 40Invemess CenterParkway. Birmningham, AL Vogle Electic Generating Plant Waynesboro, GA 30830 Date
. Sheet Unit MWO #
- 2.
Plant I
.Of I
7-4 L* COS/1v70-20303136 Repair Organization P.O. No., Job No., etc.
Plant Vogtie Address
- 3.
Work Performed by Nuclear Operatons Maintenance Name Address
- 4.
Identification Of System 1301 /Main Steam System
- 5.
(a) Applicable Construction Code ASME SEC Ill 1977
- Edition, Wnter 1977
- Addenda, N-249-1 Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 989
- 6.
Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE SUPPORT PULLMAN N/A N/A V2-1301-128-H107 1989 REPLACEMENT-YES POWER PRODUCTS
- 7.
Description Of Work SnubberAD-71. senal# 612 was replaced with AD-71. senal# 459 to supportsurveillance tesfing.
B.
Test Conducted:
Hydrostatic r PneumaticEl Nominal Operating Pressure 5 N/A [0]
Other ]
NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl.
repair or replacement Type Code Symbol Stamp NMA Certificate of Authorization No.
N/A Expiration Date NM Signed
/
Team Leader Date tg Owner ofOwner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Geormia and employed by Hartford Steam Boiler Inspecton and Insurance Co. of Connecticut of Hartford. Connecticut have inspected the components described in this Owner's Report during the period 01/30/04 to and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME
- Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report.
Furthermore, neither the Inspector nor' his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this in Commisslons CA.O.
lnspedor's Signature National Board, State, Province and Endorsements Date_________
ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI
- 1.
Owner Southern Nuclear Operating Company Name 40 Invemess CenterParkway. Birmingham. AL VogUe Electric Generating Plant Waynesboro, GA 30830 Date Sheet Unit MWO #
Traveler #
04024 05/10/04 I
Of I
4 2 Wi L
Cs117h4 20303138 Repair Organization P.O. No., Job No., etc.
Plant Voogfe
- 2.
Plant Address
- 3.
Work Performed by Nuclear Operations Maintenance Name Address
- 4.
Identification Of System 1302 lAux)Tiary Feedwater System
- 5.
(a) Applicable Construction Code ASME SEC In 1977
- Edition, Winter 1977
- Addenda, N-249-1 Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE SUPPORT PULLMAN N/A N/A V2-1302-107-HOII 1989 REPLACEMENT YES POWER PRODUCTS
- 7.
Description Of Work SnubberAD-503. seial# 366 was replacedwith AD-503. serial# 186 to supportsurveilance testing.
- 8.
Test Conducted:
Hydrostatic 5] PneumaticE Nominal Operating Pressuref NIA [F]
Other ]
N/A OF CERTIFICATE OF COMPIUANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl.
repair or replacement Type Code Symbol Stamp N/A Certificate of Autorization No.
N/A Expiration Date N/A Signed
/2 Team Leader Date Owney6r Owner's Designefe, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Geormia and employed by Hartford Steam Bolter Inspection and Insurance Co. of Connecticut of Hartford. Connecticut have inspected the components described in this Owner's Report during the period *01130104 to,5 /H-o/
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME
- Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report.
Furthermore, neither the Inspector nor his employer shall be liable In any mangl for any personal injury or property damage or a loss of any kind arising from or connected with this inspect~,
GodCommissions GA5 Z7D 3 Inspec~r's Signature National Board, State, Province and Endorsements Date
.5' 4 a/
I FORM NIS-2 OWNER'S REPOQH IA t$N REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler #
04025
- 1. Owner Southern Nuclear Operating Company Name 40 Inverness Center Parkway. Birmingham. AL Date May 11, 2004
' Sheet I
of l
- 2. Plant Address Vogtle Electric Generating Plant Plant Waynesboro, GA 30830 Address Unit 2
MWO #
20303141
- 3. Work Performed by Nuclear Operatlons Maintenance Name
. Repair Organization P.O. No., Job No., etc.
Plant Vogtle Address
- 4. Identification Of System 13051 CONDENSATE SYSTEM
- 5. (a) Applicable Construction Code ASME Section III 1977 Edition, (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989 Winter 1977
- Addenda, N-249-1 Code Case
- 6. Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL
- REPAIRED, ASMETCODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO.
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
Pipe Support Pullman Power WNA NWA V2-1305-058-H004 1989 REPLACEMENT YES Products
- 7. Description Of Work Snubber AD-5501. serial # 269 was replaced with snubber AD-5501, serial #230 to support surveillance testing.
- 8. Tests Conducted:
Hydrostatic 0]
Pneumatic a Nominal Operating Pressure 0 NIA 0 Other a
Pressure N/A PSI Test Temp.
- F CERTIFICATE OF COMPIUANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl.
repair or replacement Type Code Symbol Stamp N!A Certificate of Authorization No.
NNlA Expiration Date NIA Signed e'2.a 6
° Team Leader Date Ovirer or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Georgia and employed by Hartford Steam Boiler Inspection and Insurance Co of Connecticut of Hartford Connecticut have inspected the components described In this Owner's Report during the period January 30,2004 to.,j8O
. and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code,Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manger for any personal Injury or property damage or a loss of any kind arising from or connected with this insteps Commissions so 3
Inspe r's Signature National Board, State, Province and Endorsements Date 35.f- /4O.,
FORM NIS-2 OWNER'S RE RGJ h
REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xi
- Traveler#
04026 May 11,2004
- 1. Owner Southern Nuclear Operating Company Date Name 40 Invemess Center Parkway, Birmingham, AL
- Sheet Address Vogtle Electric Generating Plant Unit Plant Waynesboro, GA 30830 MWO #
- 2.
Plant I
of I
2 Z=
Y/
I, 3/
.2D3a=34.-
aoin-iga Repair Organization P.O. No., Job No., etc.
Plant Voctle Address
- 3. Work Performed by Nuclear Operations Maintenance Name Address 4.
5.
6.
Identification Of System 13051 Conde (a) Applicable Construction Code ASME Section /it 1977 Edition, (b)Applicable Edition of Section Xi Utilized For Repairs Or Replacements 1989 Identification Of Components Repairs Or Replacement Components ensate System Winter 1977 Addenda, N-249-1 Code Case NAME NAME MANUFACTURER NATIONAL REPAIRED.
ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO.
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE PULLMAN N/A N/A V2-1305-058-HOO6 1989 REPLACEMENT Yes SUPPORT POWER PRODUCTS
- 7. Description Of Work SnubberAD-12503, serial 22 was replacedwith AD-12503. serial#44 to suoportsurveillance testing.
- 8. Tests Conducted:
Hydrostatic a Pneumatic 0l Nominal Operating Pressure El N/A ED Other El Pressure NIA PSI Test Temp.
N/A
- F CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl.
repair or replacement Type Code Symbol Stamp NIA Certificate of A horization No.
NIA Expiration Date NIA Signed
_Date_ _
eeor Owners 0E ignee, Title CERTIFICATE OF INSERVICE INSPECTION I
I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Georgia and employed by Hartford Steam Boiler Inspection and Insurance Co of Connecticut of Hartford Connecticut have Inspected the components described In this Owner's Report during the period January 30,2004 to
-C/
-, and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any mgpner for any personal injury or property damage or a loss of any kind arising from or connected with this Commissions CA =03 Ins tor's Signature National Board, State, Province and Endorsements Date
- - /3 -O!/
FORM NIS-2 OWNER'S RE O REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xi
- .Traveler 04027 May 10, 2004
- 1. Owner Southern Nuclear Operating Company Date
- 2. Plant Name 40 Inverness Center Parkway, Birmingham, AL
- Sheet I
of I
Address Vogt/e Electric Generating Plant Unit 2
Plant Wavnesboro. GA 30830 MWO #
20303143 Address
- 3. Work Performed by Nuclear Operations Maintenance Repair Organization P.O. No., Job No., etc.
Plant Voqtle Name Address
- 4. Identification Of System 13051 CONDENSATE Al
- 5.
(a) Applicable Construction Code ASME Section fil 1977 Edition, (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components ID FEEDWATER SYSTEM Winter 1977
- Addenda, N/A Code Case NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE PULLMAN N/A WA V2-1305-060-HOO6 1989 REPLACEMENT Yes SUPPORT POWER PRODUCTS
- 7. Description Of Work Snubber PSA-100. serial number #2031 was replaced with PSA400 serial #2177 to Support surveillance testing.
V_
- 8. Tests Conducted:
N/A Z Hydrostatic 0 Pneumatic D Nominal Operating Pressure E Other 0 Pressure NlA PSI Test Temp.
NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code, Section Xi.
repair or replacement Type Code Symbol Stamp NIA Certificate of uthorization No.
NIA of Expiration Date N/A Signed
/Z ;
-/>
icOz
-V-Owner Owner's Designee. Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Georgia and employed by Hartford Steam Boiler Inspection and Insurance Co of Connecticut of Hartford Connecticut have Inspected the components described In this Owner's Report during the period January 30, 2004 to _ 5-/3-O4
. and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section Xi.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this gfit Commissions CA,2 o.
Inspecldr's Signature National Board, State, Province and Endorsements Date ______
I IGlNAL FORM NIS-2 OWNER'S REPORT F AIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler #
04030
- 1.
Owner Southem Nuclear Operating Company Date May 10, 2004 Name 40InvemessCenterParkwayBirmingham,AL Sheet l
of 4
- 2.
Plant Address VogUe Electric Generating Plant Plant Waynesboro, GA 30830 Unit MWO #
Address
- 3. Work Performed by Nuclear Operations Maintenance Name
- 4. Identification Of System 1301/ MAIN S'
- 5.
(a) Applicable Construction Code ASME Section III 1977 Edition, (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components 2
20303163 Repair Organization P.O. No., Job No., etc.
Plant Vogtle Address TEAM SYSTEM Winter 1977
- Addenda, N/A Code Case NAME NAM E MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE PULL MAN UAC NIA VT-1301-165IHA2 1989 REPLACEMENT ASYes SUPPO RPO NMER PRODUCTS
- 7.
Description Of Work Snubber AD-41. serial 1384 was replaced with a rigid strut in accordance with DCP O1.V2N0004.
- 8. Tests Conducted:
Hydrostatic D Pneumatic 0 Nominal Operating Pressure [I N/A ED Other 0
Pressure NWA PSI Test Temp.
NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section Xi.
repair or replacement Type Code Symbol Stamp NIA Certificate ofAuthorization No.
N/A Expiration Date NWA Signed Z
S/_etl
'.'OwnfoOwnnr Designiee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Georgia and employed by Hartford Steam Boiler Inspection and Insurance Co of Connecticut of Hartford Connecticut have inspected the components described in this Owner's Report during the period February 19, 2004 to and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this I
C Commissions GA -A Inspector's Signature National Board, State, Province and Endorsements Date 5V3-7
QORIGINAL FORM NIS-2 OWNER'S RE T FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xi Traveler #
.04038 April 27, 2004
- 1. Owner Southem Nuclear Operating Company Name 40 Invemess Center Parkway, Birmingham, AL Address
- 2.
Plant Vogtle Electric Generating Plant Plant Waynesboro, GA 30830 Address
- 3.
Work Performed by Nuclear Operations Maintenance Name Date Sheet Unit MWO #
I of I
2 20303123 Repair Organization P.O. No., Job No., etc.
Plant Voqtle Address
- 4. Identification Of System 12041 Safety Ih
- 5.
(a) Applicable Construction Code ASME Section iN 1977 Edition, (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components Ijection System Winter 1977
- Addenda, N-411 Code Case NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE PULLMAN N/A NA V2-1204-038-H013 1988 REPLACEMENT Yes SUPPORT POWER PRODUCTS
- 7.
Description Of Work Snubber AD-1601. serial #124 was replaced with rigid strut in accordance with DCP O1-V2N0004.
S. Tests Conducted:
Hydrostatic l]
Pneumatic 0 Nominal Operating Pressure 3 NIA 0 Other 0 Pressure NIA PSI Test Temp.
N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.
repair or replacement Type Code Symbol Stamp N/A Certificate ofAuthorization No.
_NA Expiration Date NIA S igned te inor Owner's Deskee, Title/
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Georgia and employed by Hartford Steam Boiler Inspection and Insurance Co of Connecticut of Hartford Connecticut have inspected the components described In this Owner's Report during the period February 10, 2004 to and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any ma er for any personal Injury or property damage or a loss of any kind arising from or connected with this ins e tion.
4./
lns?5,n Quz Commissions_6
./2p3 Inspedor's Signature National Board, State, Province and Endorsements Date
FORM NIS-2 OWNER'S RQJFI NMAR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler #
04041
- 1. Owner Southern Nuclear Operating Company Date May 10, 2004 Name 40 Inverness Center Parkway. Birmingham. AL
- Sheet
- 2.
Plant Address VogUe Electric Generating Plant Plant Waynesboro, GA 30830 Address I
of 4
Unit 2
20303139 MWO #
Repair Organization P.O. No., Job No., etc.
- 3. Work Performed by Nuclear Operations Maintenance Name Plant Vogtle Address
- 4. Identification Of System 13021 Auxiliary Feedwater System
- 5.
(a) Applicable Construction Code ASME Section /it 1977 Edition, Winter1977
- Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE PULLMAN N/A N/A V2-1302-108-H012 1989 REPLACEMENT Yes SUPPORT POWER PRODUCTS
- 7.
DescriptionOfWork Snubber AD-1601. serial 60 was replaced with a Lisega Hydraulic Snubber, serial #01614940083 In accordance with DCP 99-VAN0033.
S. Tests Conducted:
Hydrostatic D Pneumatic 0 Nominal Operating Pressure 0 NWA ID Other D Pressure NrA PSI Test Temp.
NWA OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this rules of the ASME Code, Section Xl.
replacement conforms to the repair or replacement Type Code Symbol Stamp NIA Certificate ofAuthoriz tion No.
N/A Signed
___ool7 Expiration Date 250-~
~
__-17 NIA Owagr or Owner's Desidnee. Title I
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Georgia and employed by Hartford Steam Boiler Inspection and insurance Co of Connecticut of Hartford Connecticut have Inspected the components described In this Owner's Report during the period February 18. 2004 to a<
...v
, and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this lnsP S
ZZP Commissions GA So03 Inspedor's Signature National Board, State, Province and Endorsements Date _
/
__O._
FORM NIS-2 OWNER'S REiRIzEJNWR%
EMENTS As Required By The Provisions Of The ASME Code Section Xl
- Traveler #
04042 May 10, 2004
- 1. Owner Southern Nuclear Operating Company Name 40 Inverness Center Parkway. Birminaham. AL
- 2. Plant Address Vogde Electric Generating Plant Plant Waynesboro, GA 30830 Date
- Sheet Unit MWO #
1 of 4
2 Address
- 3. Work Performed by Nuclear Operations Maintenance Name 20303347
. Repair Organization P.O. No., Job No., etc.
Plant Voqtle Address
- 4. Identification Of System 1204 ISafi
- 5.
(a) Applicable Construction Code ASME Section IO 1977 Edition, (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6. Identification Of Components Repairs Or Replacement Components lty Inlection Winter 1977
- Addenda, N-249-1 Code Case NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE PULLMAN NWA NA V2-1204-057.H019 1989 REPLACEMENT Yes SUPPORT POWER PRODUCTS
- 7.
Description Of Work Snubber PSA-1/2, serial #18893 was replaced with a Lisega Hydraulic Snubber, serial #00614800015 In accordance with DCP 99-VAN0033.
- 8. Tests Conducted:
N/A El Hydrostatic 0 Pneumatic 0 Nominal Operating Pressure 0 Other 0 Pressure N/A PSI Test Temp.
N/A
- F CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl.
repair or replacement Type Code Symbol Stamp N/A Certificate of Autho 5 ation No.
N/A Expiration DAat NIA Signed
.1 a te
<1
//6 L
Ownhor Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I. the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Georgia and employed by Hartford Steam Boler Inspection and Insurance Co of Connecticut of Hartford Connecticut have Inspected the components described In this Owner's Report during the period February 18, 2004 to..- L...0....
and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described In this Owners Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any man r for any personal Injury or property damage or a loss of any kind arising from or connected with this ins
,7 Commissions GA 2 zo3 InspectpIf's Signature National Board, State, Province and Endorsements Date S
-/.a c'1
1.
i
~
RQJ15'F 9 REP FORM NIS-2 OWNER'S EPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI Traveler #
04051 May 11, 2004
- 1. Owner Southem Nuclear Operating Company Date Name 40 Invemess Center Parkway, Birmingham, AL Sheet Address
- 2. Plant Vogtle Electric Generating Plant Unit Plant Waynesboro, GA 30830 MWO #
I of I
2 Address
- 3. Work Performed by Nuclear Operations Maintenance Name 20303356 Repair Organization P.O. No., Job No., etc.
Plant Voutle Address
- 4. Identification Of System 13011 Main S
- 5. (a) Applicable Construction Code ASME Section iii 1977 Edition, (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
- 6. Identification Of Components Repairs Or Replacement Components
'team System Winter 1977 Addenda, N-249-1 Code Case NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
Pipe Support Pullman Power N/A N/A V2-1301-012-H028 1989 REPLACEMENT YES Products
- 7. Description Of Work Snubber AD-153, serial # 421 was rePlaced with Lisega 303801. serial # 01614960/041 In accordance with DCP 99-VAN0033.
S. Tests Conducted:
N/A 0 Hydrostatic a
Pneumatic D Nominal Operating Pressure D Other a
Pressure N/A PSI Test Temp.
N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl.
repair or replacement Type Code Symbol Stamp N/A Certificate of A horization No.
NIA Expiration Date N/A Signed ner oTeam Leader Date _
fineror Oner'sDes)nee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Georgia and employed by Hartford Steam Boiler Inspection and Insurance Co of Connecticut of Hartford Connecticut have Inspected the components described In this Owner's Report during the period February 19.2004 to d
and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any man er for any personal injury or property damage or a loss of any kind arising from or connected with this I
Commissions OAA f,
nspepor's Signature National Board, State, Province and Endorsements Date 4'4-/e/- °l
FORM NIS-2 OWNER'S Q% WALR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler #
04052 May 10, 2004
- 1. Owner Southern Nuclear Operating Company Name 40 Invemess Center Parkway, Birmingham, AL Address
- 2. Plant VogUe Electric Generating Plant Plant Waynesboro, GA 30830 Address
- 3. Work Performed by Nuclear Operations Maintenance Name Date Sheet Unit MWO #
I of 4
2 20303120
- Repair Organization P.O. No., Job No., etc.
Plant Vogtle Address
- 4. Identification Of System 13021 Auxiliary I
- 5. (a) Applicable Construction Code ASME Section I/
1977 Edition, (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6. Identification Of Components Repairs Or Replacement Components Feedwater System WiSnter 1977 Addenda, N-249-1 Code Case NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE PULLMAN MN/A A
V2-1302-109-H009 1989 REPLACEMENT Yes SUPPORT POWER PRODUCTS
- 7. Description Of Work Snubber AD-1601. serial 649 was replaced with a Lisega Hydraulic Snubber, serial #01614940085 In accordance with DCP 99-VAN0033.
- 8. Tests Conducted:
N/A 0 Hydrostatic 0 Pneumatic 0 Nominal Operating Pressure D Other E0 Pressure N/A PSI Test Temp.
NIA OF CERTIFICATE OF COMPUANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl.
repair or replacement Type Code Symbol Stamp NIA Certificate of utharization No of N/A Expiration Date NIA Signed e
A te 6
5 or Owner' esignee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Georgia and employed by Hartford Steam Boiler Inspection and Insurance Co of Connecticut of Hartford Connecticut have inspected the components described In this Owner's Report during the period February 16, 2004 to i
and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this f
et---
Commissions SA Jo, Inspedtor's Signature National Board, State, Province and Endorsements D ate _
FORM NIS-2 OWNER'S RQ i v
eEAIR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xi Traveler#
04062
- 1.
Owner Southern Nuclear Operating Company Date May 10, 2004 Name 40 inverness Center Parkway, Birmingham. AL
- Sheet I
of 4
Address
- 2.
Plant Vogtle Electric Generating Plant Unit 2
Plant Waynesboro, GA 30830 MWO#
20303128 Address Repair Organization P.O. No., Job No., etc.
- 3. Work Performed by Nuclear Operations Maintenance Plant Vogtle Name Address
- 4. Identification Of System 12081 Chemical and Volume Control System
- 6.
(a) Applicable Construction Code ASME Section III 1977 Edition, Winter1977
- Addenda, N-249-1 Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE PULLMAN NA N/A V2-1208-022-H027 1989 REPLACEMENT Yes SUPPORT POWER PRODUCTS
- 7. DescriptionOfWork Snubber AD-73. serial 1209 was replaced with a Llseqa Hydraulic Snubber, serial #00614800045 In accordance with DCP 99-VAN0033.
S. Tests Conducted:
Hydrostatic 0 Pneumatic 0 Nominal Operating Pressure 0 N/A 0 Other 0 Pressure N/A PSI Test Temp.
N/A
- F CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code, Section Xl.
repair or replacement Type Code Symbol Stamp NIA Certificate o Authorization No.
N/A Expiration Date NIA Signed D
20 d
' Q~erorOwne's esignee. Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Georgla and employed by Hartford Steam Boiler InspectIon and Insurance Co of Connecticut of Hartford Connecticut have Inspected the components described in this Owner's Report during the period February 18,2004 to
- -/3'-t'
. and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this 7 > <
t 1
=
-igo_
Commissions g
g,?
Inspetor's Signature National Board, State, Province and Endorsements Date 6-/3-0
/
I ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xi Traveler #
04072
- 1.
Owner Southem Nuclear Operating Company Date Name 40 Invemess CenterParkwav. Birmingham. AL Sheet
- 2.
Plant Vogtfe Electric Generating Plant Waynesboro, GA 30830 Address Unit MWO #
05/101V4 I
Of I
-L 2. '%i* CS117164 20401066 Repair Organization P.O. No., Job No., etc.
- 3.
Work Performed by Nudear Operations Maintenance Name Plant VogUe Address 4.'
Identification Of System 1208 / Chemical and Volume Control System
- 6.
(a) Applicable Construction Code ASME SEC 10 1977
- Edition, Winter 1977
- Addenda, N-249-1 (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components Code Case NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE SUPPORT PULLMAN N/A N/A V2-1208-002-H009 1989 REPLACEMENT-YES POWER PRODUCTS.
- 7.
Description Of Work Snubber AD-43. serial #244 was rerlaced with AD-43. serial #303 to support surveillance testing.
- 8.
Test Conducted:
Hydrostatic [] Pneumatic[]
Nominal Operating Pressurefl N/AO[
Other
]
N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this rules of the ASME Code,Section XI.
REPLACEMENT conforms to the repair or replacement Type Code Symbol Stamp N/A ttl y
fall" Certificate of AL5 orization No.
Signed OX
, NMA Expiration Date NMA Team Leader Date
_:Z~d9-Owner of'Owner's Desianee. Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Geormia and employed by Hartford Steam Boiler Inspection and Insurance Co. of Connecticut of Hartford. Connecticut have inspected the components described In this Owner's Report during the period 04121/04 to go
__ and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME
- Code,Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report.
Furthermore, neither the Inspector nor his employer shall be liable In any manger for any personal injury or property damage or a loss of any kind arising from or connected with this z
Commissions C*4 ads Inspetor's Signature National Board, State, Province and Endorsements Date 5
ii
I ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl
- 1.
Owner Southern Nuclear Operatng Company Name 40 Inverness Center Parkway, Birningham. AL Vogue Electric Generating Plant Waynesboro, GA 30830 Date
. Sheet Unit MWO #
Traveler #
04076 05)V7,04 I
Of I
F2 TZ05i411174 20401249 Repair Organization P.O. No., Job No., etc.
Plant Vogtle
- 2.
Plant Address
- 3.
Work Performed by NuclearOperations Maintenance Name Address 4.'
Identification Of System 1301 Main Steam System.
- 5.
(a) Applicable Construction Code ASME SEC Ilm 1977
- Edition, Wnter 1977
'-Addenda, N-249-1 Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE SUPPORT PULLMAN N/A N/A V2-1301-126-H014 1989 REPLACEMENT YES POWER PRODUCTS
- 7.
Description Of Work SnubberAD-151. serial #497 was replaced with AD-151. serial #553 to support surveillance testing.
- 8.
Test Conducted:
Hydrostatic El PneumaticE Nominal Operating Pressurer]
N/A [r]
Other []
Pressure N/A PSI Test Temp.
N/A
- F CERTIFICATE OF COMPUANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code,Section XI.
repair or replacement Type Code Symbol Stamp N/A Certificate of Ahorization No.
_ N/A Expiration Date N/A Signed TeamLeader Date UOwNr or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georgia and employed by Hartford Steam Boflerlnspection and Insurance Co. of Connecticut of Hartford. Connecticut have inspected the components described In this Owner's Report during the period
-0412&'V4 to S and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME
- Code,Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner -for any personal injury or property damage or a loss of any kind arising from or connected with this lns
~
a, Commissions G.A;>o?
InspoEtor's Signature National Board, State, Province and Endorsements Date 6-I4-O'
I UMlUIINJAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI
- 1.
Owner Southern Nuclear Operating Company Name 4An /-l AP M-n r
AlhoRimnho
- 2.
Plant su 1mvWiv-ss %UV1 1errAnway. Luairrngniaml, AL Vogtle Electrc Generating Plant Waynesboro. GA 30830 Date Sheet Unit MWO #
Traveler #
04080 05V7)V4 I
Of I
20401391 Repair Organization P.O. No., Job No., etc.
Plant Voaffe Address
- 3.
Work Perfornmed by Nuclear Operations Maintenance Name Address
- 4.
Identification Of System 1202/Nuclear Service Cooing Water System
- 6.
(a) Applicable Construction Code ASME SEC
./ 1977 Edition, Winter 1977
-Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE SUPPORT PULLMAN NA N/A V2-1202-406-H031 1989 REPLACEMENT -
YES POWER PRODUCTS
- 7.
Description Of Work SnubberAD-43. senial 1515 was replacedwith AD43. seral# 677 to supportsurveilance testing.
- 8.
Test Conducted:
Hydrostatic I Pneumatic[]
Nominal Operating Pressure]
N/A [nX Other []
Pressure N/A PSI Test Temp.
N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code,Section XI.
repair or replacement Type Code Symbol Stamp N/A Certificate of Authorization No.
N/A Expiration Date N/A Signed TeamLeader Date
//f/
erdfOwner's Designee. Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Geormia and employed by Hartford Steam Boler Inspection and Insurance Co. of Connecticut of Hartford. Connecticut have inspected the components described In this Owner's Report during the period 04130M4 to 5-/;
vI9L and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME
- Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty' expressed or Implied, concerning the examinations and corrective measures described In this Owners Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this insMA> 1 0Z>
Commissions GA 20o' Inspe4tior's Signature National Board, State, Province and Endorsements Date 5-/2-me/
I UHIlNAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI
- 1.
Owner Southern Nuclear Operating Company Date Name 40 Inverness Center Parkway, Birmingham, AL
. Sheet
- 2.
Plant VogUe Electic Generating Plant Unit Waynesboro, GA 30830 MWO #
Traveler #
04081 051071V4 1
Of 1
-F-Z 5bovdlii:
20303352 Repair Organization P.O. No., Job No., etc.
Plant Vootle Address
- 3.
Work Performed by Nuclear Operafions Maintenance Name Address
- 4.
Identification Of System 1208/Chemical and Volume Control System
- 6.
(a) Applicable Construction Code ASME SEC I11 1977
- Edition, Winter 1977
- Addenda, N-249-1 Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE SUPPORT PULLMAN N/A N/A V2-1208-011-H045 1989 REPLACEMENT -
YES POWER PRODUCTS
- 7.
Description OfWork SnubberAD-41. seral#541 was rer/acedwithAD-4. senal# 854 to supoortsurveillance testing.
- 8.
Test Conducted:
Hydrostatic a Pneumaticfl Nominal Operating Pressurefl NIA [3 Other E Pressure N/A PSI Test Temp.
N/A OF CERTIFICATE OF COMPUANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl.
repair or replacement Type Code Symbol Stamp N/A Certificate of Aut orization No.
N/A Expiration Date N/A Signed
/Z Own rgTeam Leader Date Owne
~r Owner's esignee. Title CERTIFICATE OF INSERVICE INSPECTION I. the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Geormia and employed by HartfordSteam Boiler Inspection and Insurance Co. of Connecticut of Hartford. Connecticut have inspected the components described In this Owner's Report during the period 04/30/34 to t
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report.
Furthermore, neither the Inspector nor* his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this ins 3 eg s
Commissions (A,?o3 Inspects Signature National Board, State, Province and Endorsements Date
I UMiIUINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl
- 1.
Owner Southem Nuclear Operaftng Company Name itn nloooce
~nntt Parhsv Rininni At
- 2.
Plant flu mlVfJlem1 t
CI r-In-dy,
-flrrnylIoUl L.
Vogde Electic Generating Plant Waynesboro, GA 30830 Date Sheet Unit MWO #
Traveler #
04082
.051V71A4 I
Of I 2 ci /,7kA 20401432 Repair Organization P.O. No., Job No., etc.
Plant VogUe Address
- 3.
Work Performed by Nudear Operations Maintenance Name Address 4.,
Identification Of System 1208 IChermical and Volume Control System S.
la) Applicable Construction Code ASME SEC I1 1977
- Edition, Wnter 1977
- Addenda, N-249-1 Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL
- REPAIRED, ASMIE CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED`
COMPONENT MANUFACTURER NO.
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE SUPPORT PULLMAN N/A N/A V2-1208-020-H705 1989 REPLACEMENT -
YES POWER PRODUCTS
- 7.
Description Of Work Snubber AD-7l. serial #449 was replaced with AD-71. serial #242 to supoort surveillance testing.
- 8.
Test Conducted:
Hydrostatic [] Pneumatic[]
Nominal Operating Pressure[]
NIA [j Other j]
Pressure NWA PSI Test Temp.
N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the AS ME Code,Section XI.
repair or replacement Type Code Symbol Stamp N/A Certificate of Au orizationNo.
N/A Expiration Date N/A Signed or w
Team Leader Date.
/J.7 Ownor Owe'Dein, Title V
CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Geormia and employed by Hartford Steam Boxler Inspection and Insurance Co. of Connecticut of Hartford. Connecticut have inspected the components described In this Owner's Report during the period.04130/D4 to S-12-0 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME
- Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described in this Owners Report.
Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal injury or property damage or a loss of any kind arising from or connected with this inspM c A
Commissions 492A,3 Inspictor's Signature National Board, State, Province and Endorsements Date
-/. 2.O /
I UHIiINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI
-/
- 1.
Owner Southern Nuclear Operating Company Date Name 40 Inverness Center Parkway, Birmingham, AL
. Sheet Traveler #
04083 051071V4 I
Of I
-- 2 Aa1i e!74-l
- 2.
Plant VogUe Electric Generating Plant Unit Waynesboro, GA 30830 MWO.
20401431 Address
- 3.
Work Performed by Nuclear Operations Maintenance Name Repair Organization P.O. No., Job No., etc.
Plant Vogtue Address
- 4.
Identification Of System 1206 / Containment Spray System
- 5.
(a) Applicable Construction Code ASME SEC I11 1977
- Edition, Wnter 1977
- Addenda, N-249-1 Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE SUPPORT PULLMAN N/A N/A V2-1206-002-H002 1989 REPLACEMENT YES POWER PRODUCTS
- 7.
Description Of Work SnubberAD-501. serial# 148 was replaced with AD-501. senal# 163 to support survellance testing.
- 8.
Test Conducted:
Hydrostatic []
Pneumatic[]
Nominal Operating PressureE]
NIA[]
Other ]
Pressure N/A PSI Test Temp.
N/A
- F CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code,Section XI.
repair or replacement Type Code Symbol Stamp N/A Certificate of horzation No.
N/A Expiration Date N/A Signed Tam
/
Date A
/
a<
Owpir or Owner's Designee, Title L6 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georgia and employed by Hartford Steam Boiler Inspection and Insurance Co. of Connecticut of Hartford. Connecticut have inspected the components described In this Owner's Report during the period 04/30104 to 5 !.d.f.. and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME
- Code,Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners Report.
Furthermore, neither the Inspector nor *his employer shall be liable In any manf r for any personal Injury or property damage or a loss of any kind arising from or connected with this insp DECK Commissions GA,3 Inspeqror's Signature National Board, State, Province and Endorsements Date__________
I UIIUIINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl
- 1.
Owner Southern Nuclear Operating Company Date
- 2.
Plant Name 40 Inverness Center Parkway, Birringham, AL Sheet VogUe Electfic Generating Plant Unit Wavnesboro, GA 30830 MWO #
Traveler #
04084 05/07/04 I
Of I
20401449 Repair Organization P.O. No., Job No., etc.
Plant Vogte Address
- 3.
Work Performed by Nudear Operadons Maintenance Name Address 4;
Identification Of System 1208/Chenical and Volume Control System S. (a) Applicable Construction Code ASME SEC I11 1977
- Edition, Winter 1977
- Addenda, N-249-1 Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL
- REPAIRED, ASMIE CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO.
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE SUPPORT PULLMAN N/A N/A V2-1208-488-HO02 1989 REPLACEMENT YES POWER PRODUCTS
- 7.
Description Of Work SnubberAD-153 senal# 467 was replaced with AD-153. senal# 221 to support survei7lance test/nc.
- 8.
Test Conducted:
Hydrostatic [E Pneumatic[]
Nominal Operating PressureD NIA [n Other ]
Pressure NWA PSI Test Temp.
NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code,Section XI.
repair or replacement Type Code Symbol Stamp N/A Certificate of A horization No.
Fl/A Expiration Date NMA Signed Team Leader Date
-d=e~%r Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georgia and employed by Hartford Steam Boilerinscectfon and Insurance Co. of Connecticut of Hartford. Connect/cut have inspected the components described In this Owner's Report during the period.0513104 to
-/13-0
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners ReporL Furthermore, neither the Inspector nor his employer shall be liable In any ma, er for any personal injury or property damage or a loss of any kind arising from or connected with this ins_
__t7 C____
Commissions GJ4'Oi Inspodtor's Signature National Board, State, Province and Endorsements Date 5f- /3.D
./
I UMUbINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xi
- 1.
Owner Southern Nuclear Operating Company 40 Invemess Center Parkway, Birningham. AL VogUe Electric Generating Plant Waynesboro. GA 30830 Date Sheet Unit MWO #
Traveler #
04085 05107/04 I
Of I
4 2 -.Ws.,T17hb4-20401445 Repair Organization P.O. No., Job No., etc.
Plant VogfUe
- 2.
Plant Address
- 3.
Work Performed by Nudear Operations Maintenance Name Address
- 4.
Identification Of System 1202 /Nuclear Service Cooling Water System S. (a) Applicable Construction Code ASME SEC 10 1977
- Edition, Winter 1977
- Addenda, N-249-1 Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTUREF NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE SUPPORT PULLMAN N/A N/A V2-1202-229-H024 1989 REPLACEMENT YES POWER PRODUCTS
- 7.
Description Of Work SnubberAD-501. seial# 153 was redaced with AD-S1. serial# 152 to sunportsurveillance testina.
- 8.
Test Conducted:
Hydrostatic [5 Pneumatic[:
Nominal Operating PressureQ N/A [2]
Other 5 Pressure N/A PSI Test Temp.
N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xi.
repair or replacement Type Code Symbol Stamp N/A Certificate of Aut prization No.
N/A Expiration Date N/A Signed Team Leader Date Own ror Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georgia and employed by Hartford Steam Boiler Inspecdon and Insurance Co. of Connecticut of Hartford. Connecticut have inspected the components described In this Owner's Report during the period 05/03/04 to 0
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report in accordance with the requirements of the ASME Code,Section XI.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report.
Furthermore, neither the Inspector nor-his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this t
v Commissions 6A,7,5 Insp~etor's Signature Date 5
-/-
/4 National Board, State, Province and Endorsements F
I ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler #1 04086
- 1.
Owner Southern Nuclear Operating Company Name 40 Inverness Center Parkway, Birmingham, AL
- 2.
Plant VogUe Electric Generating Plant Date Sheet Unit 051V71V4 I
Of I
-4 (6/k@4 20401448 Repair Organization P.O. No., Job No., etc.
Plant Voatle Waynesboro. GA 30830 MWO #
Address
- 3.
Work Performed by Nucear Operations Maintenance Name Address 1901/ Waste Process System - Liquid
- 4.
Identification Of System
- 6.
(a) Applicable Construction Code ASME SEC 111 1977
- Edition, Wnter 1977
- Addenda, N-249-1 (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components Code Case NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE SUPPORT PULLMAN N/A VA V2-1901-022-H031 1989 REPLACEMENT YES POWER PRODUCTS
- 7.
Description Of Work Snubber AD-43. serial #437 was relaced with AD-43. serial #887 to support surveillance testing.
- 8.
Test Conducted:
Hydrostatic Ea Pneumatic[]
Nominal Operating Pressure[]
N/A0[
Other []
Pressure NWA PSI Test Temp.
- F CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this.' ;
REPLACEMENT conforms to the rules of the ASME Code, Section Xl.
repair or replacement Type Code Symbol Stamp NMA Certificate of horization No.
N/A Expiration Date N/A Signed Team Leader Date O~er or Owner's Designee. Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the Stateor Province of Geormia and employed by Hartford Steam Boiler Inspection and Insurance Co. of Connecticut of Hartford, Connecticut have inspected the components described In this Owner's Report during the period 0&3,V4 to and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, -Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report.
Furthermore, neither. the Inspector nor-his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this insetn i
>hi Commissions GA 1c3 Inspetor's Signature National Board, State, Province and Endorsements Date 5-13 -o0
I UIUII'NIAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xi Traveler #
04088
- 1.
Owner Southern Nuclear Operating Company Date Name 40 Inverness Center Parkway, Birnningham. AL Sheet
- 2.
Plant VogUe Electic Generating Plant Waynesboro, GA 30830 Address 050V7/04 1
Of I
-f 2.
As 05LI7Z1/
20401451 Repair Organization P.O. No., Job No., etc.
Unit MWO #
- 3.
Work Performed by Nuclear Operafions Maintenance Name Plant Vogfe Address
- 4.
Identification Of System 1301 IMain Steam System S.
(a) Applicable Construction Code ASME SEC IX/
1977
- Edition, Wnter 1977
- Addenda, N-249-1 (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components Code Case NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE SUPPORT PULLMAN N/A N/A V2-1301-176-H002 1989 REPLACEMENT YES POWER PRODUCTS
- 7.
Description Of Work Snubber AD-501. senal# 141 was replaced with AD-5o1. serial# 562 to supportsunrveiWance testina.
- 8.
Test Conducted:
Hydrostatic []
Pneumatic[]
Nominal Operating Pressure[]
N/A E]
Other []
Pressure N/A PSI Test Temp.
'F CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl.
repair or replacement Type Code Symbol Stamp N/A Certificate of uthorization No.
N/A Expiration Date N/A Signed J
Team Leader Date Dsge 5rl QOWfer or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Geormia and employed by Hartford Steam Sofler Inspection and Insurance Co. of Connecticut of Hartford. Connecticut have inspected the components described In this Owner's Report during the period.05AD3,V4 to 5 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME
- Code, Section Xi.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report.
Furthermore, neither the Inspector nor his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this ins f
a Commissions GAD Inspetor's Signature National Board, State, Province and Endorsements Date
&- J a
I UM-UINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl
- 1.
Owner Southem Nuclear Operatng Company Name 40 Inverness Center Parkway, Birmingham, i
- 2.
Plant Vogtue Electrc Generating Plant Waynesboro, GA 30830 Address
- 3.
Work Performed by Nuclear Operations Maintenance Date IL Sheet Unit MWO #
Traveler #
04089 05)V7/04 I
Of I
-42 JL-i&/17/Z84 20401452 Repair Organization P.O. No., Job No., etc.
Plant Vogtle Name Address
- 4.
Identification Of System 1301 /Main Steam System
- 6.
(a) Applicable Construction Code ASME SEC IX 1977
- Edition, Winter 1977
- Addenda, N-249-1 Code Case (b)Applicable Edition of Section XI Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE SUPPORT PULLMAN N/A N/A V2-1301-368-HOO1 1989 REPLACEMENT
- YES POWER PRODUCTS
- 7.
Description Of Work SnubberAD-151. serial# 77was replacedwithAD-51. senal#549 to sunportsurvet'lance testinq.
- 8.
Test Conducted:
Hydrostatic fl Pneumaticln Nominal Operating Pressureo NIA f Other []
NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this rules of the ASME Code,Section XI.
rel Type Code Symbol Stamp N/A Certificate of Authorization No.
N/A Expiration Dat Signed Team Leader Date Jr REPLACEMENT conforms to the
)air or replacement e
- Z-
,/
N/A OVner eflOwner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georgia and employed by Hartford Steam Boiler Inspection and Insurance Co. of Connecticut of Harnford. Connecticut have inspected the components described In this Owner's Report during the period 05I03)04 to and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners Report.
Furthermore, neither the Inspector nor his employer shall be liable in any majner for any personal Injury or property damage or a loss of any kind arising from or connected with this inspt<3, 4
/
Commissions GAE3 Inspoctor's Signature National Board, State, Province and Endorsements Date __-____3_-_
I UMIUIINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl
- 1.
Owner Southern Nuclear Operating Company Date Name 40 Invemess CenterParkway, Birmingham. AL
- 2.
Plant Voatle Electric Generatina Plant Sheet Unit MWO #
Traveler #
04090 0507,V4 I
Of I
.. 2. qg.17 20401446 Repair Organization P.O. No., Job No., etc.
Plant Vogtle Waynesboro, GA 30830 Address
- 3.
Work Performned by Nuclear Operations Maintenance Name Address
- 4.
Identification Of System 1204 ISafety Injection System
- 5.
(a) Applicable Construction Code ASME SEC III 1977
- Edition, Wnter 1977
- Addenda, N-249-1 Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacerents 1989
- 6.
Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE SUPPORT PULLMAN N/A N/A V2-1204-025-H013 1989 REPLACEMENT -
YES POWER PRODUCTS
- 7.
Description Of Work SnubberAD-151. seial 130 was repaced with AD-151. seial # 171 to suonort surveillance testing.
S.
Test Conducted:
Hydrostatic E Pneumatic[]
Nominal Operating Pressure[E N/A [X Other D Pressure NIA PSI Test Temp.
N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code,Section XI.
repair or replacement Type Code Symbol Stamp N/A Certificate of Au horization No.
N/A Expiration Date N/A Signed T
Team Leader Date Owntr or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Geormia and employed by Hartford Steam Bolter Inspecton and Insurance Co. of Connecticut of Hartford. Connecticut have inspected the components described in this Owner's Report during the period 05103IV4 to and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report In accordance with the requirements of the ASME
- Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this Insm&
-i-X g
Commissions GA 203 Inspeftor's Signature National Board, State, Province and Endorsements Date AAI3 Y9'f
I ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xi Traveler #
04092 05,V7104
- 1.
Owner Southern Nuclear Operating Company Name 40 Inverness Center Parkway, Bimingham, r
- 2.
Plant Vootle Electric Generatina Plant Date AL
.Sheet Unit MWO #
Waynesboro, GA 30830 I
Of I
4 2 2t4o5'/o4-20401492 Repair Organization P.O. No., Job No., etc.
Plant Voqde Address
- 3.
Work Performned by Nuclear Operations Maintenance Name Address
- 4.
Identification Of System 1201 IReactor Coolant System
- 5.
(a) Applicable Construction Code ASME SEC lIl 1977
- Edition, Winter 1977 I
- Addenda, N-249-1 Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacemfents 1989
- 6.
Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE SUPPORT PULLMAN N/A N/A V2-1201-030-H626 1989 REPLACEMENT YES POWER PRODUCTS
- 7.
Description Of Work Snubber AD-501. serial #675 was replaced with AD-501. serial #575 to support surveiffance tesffnq.
- 8.
Test Conducted:
Hydrostatic 5 Pneumaticfl Nominal Operating PressureD WNA J Other D Pressure NWA PSI TestTemp.
NIA OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this rules of the ASME Code, Section Xi.
rel Type Code Symbol Stamp NIA Certificate of horization No. _
N/A Expiration Dat Signed Team Leader Date REPLACEMENT conforms to the
)air or replacement e
N/A Ovdf or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georuia and employed by Hartford Steam Botier Inspection and Insurance Co. of Connecticut of Hartford. Connecticut have inspected the components described In this Owner's Report during the period -05X734 to 56 and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME
- Code, Section Xi.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report.
Furthermore, neither the Inspector nor his employer shall be liable in any m pner for any personal Injury or property damage or a loss of any kind arising from or connected with this acs Commissions
( LA =°3 Insp6ctor's Signature National Board, State, Province and Endorsements Date
/!-
O'
I URIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xi
- 1.
Owner Southern Nuclear Operating Company Name 40 Inverness Center Parkway, Birmingham, AL Vogue Electric Generadng Plant Waynesboro, GA 30830 Date Sheet Unit MWO#
Traveler #
04094 050 7104 I
Of I
4 2 WA OS/(7 20401495 Repair Organization P.O. No., Job No., etc.
Plant Voogte
- 2.
Plant Address
- 3.
Work Performned by Nuclear Operations Maintenance Name Address 1208/Chemyical and Volume Control System 4.
Identification Of System S.
(a) Applicable Construction Code ASME SEC 10 1977
- Edition, Wnter 1977
- Addenda, N-249-1 Code Case (b)Applicable Edition of Section XIl Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE SUPPORT PULLMAN N/A N/A V2-1208-011-H043 1989 REPLACEMENT -
YES POWER PRODUCTS
- 7.
Description Of Work SnubberAD-43 serial# 1512was replacedwithAD-43. senal# 249to supportsurvetilance testing.
- 8.
Test Conducted:
Hydrostatic i]
PneumaticE]
Nominal Operating Pressuref N/A [n Other E Pressure N/A PSI Test Temp.
N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xi.
repair or replacement Type Code Symbol Stamp N/A Certificate of A horization No.
N/A Expiration Date N/A Signed ;7.Z6 eZ Team7Leader Date jL4Z.0Z Ownew6r Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Geormia and employed by Hartford Steam Boi7er Inspection and Insurance Co. of Connecticut of Hartford. Connectcut have inspected the components described In this Owner's Report during the period 051031V4 to A
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described In this Owners Report.
Furthermore, neither the Inspector nor* his employer shall be liable In any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this t
'(-ita44--a Commissions GA o' Inspcor's Signature National Board, State, Province and Endorsements Date 6-t
/
ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler #
04097
- 1.
Owner Southern Nuclear Operating Company Date Name 40 Inverness Center Parkway, Birmingham. AL
. Sheet 05/07/04 I
Of I
- r 2 6i/7/ 4-20401499 Repair Organization P.O. No., Job No., etc.
- 2.
Plant Vogte Electric Generating Plant Unit Waynesboro, GA 30830 MWO #
Address
- 3.
Work Performed by Nuclear Operations Maintenance Name Plant Vogile Address
- 4.
Identification Of System 1301 /Main Steam System
- 5.
(a) Applicable Construction Code ASME SEC Ia 1977
- Edition, Winter 1977
- Addenda, N-249-1 (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components Code Case NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE SUPPORT PULLMAN N/A N/A V2-1301-110-Hl-004 1989 REPLACEMENT YES POWER PRODUCTS
- 7.
Description Of Work SnubberAD-151L. serial 470was replaced with AD-151L. serial 598 to supportsurveillance testing.
- 8.
Test Conducted:
Hydrostatic 5 PneumaticE5 Nominal Operating PressureD NIA [n Other 51 Pressure NIA PSI Test Temp.
N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl.
repair or replacement Type Code Symbol Stamp N/A Certificate of Aut orization No.
N/A Expiration Date N/A Signed Team Leader Date Owe Owner's Designee, Title I
CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel inspectors and the State or Province of Georgia and employed by Hartford Steam Boiler Inspecbion and Insurance Co. of Connecticut of Hartford. Connecticut have inspected the components described In this Owner's Report during the period.05/03V4 to 6- /- 01
, and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or Implied, concerning the examinations and corrective measures described In this Owners Report.
Furthermore, neither the Inspector nor 'his employer shall be liable In any manrr for any personal Injury or property damage or a loss of any kind arising from or connected with this lnsm
- 3,Commissions CA.4a Inspecibr's Signature National Board, State, Province and Endorsements Date __
/___-
I UhII3INAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl
- 1.
Owner Southern Nuclear Operating Company Date Name 40 Invemess Center Parkway, Birmingham, AL
- 2.
Plant Voqtle Electdc Generating Plant Sheet Unit MWO #
Traveler #
04098 05SV704 I
Of I 2-ACd144-h<<
20401501 Waynesboro, GA 30830 Address
- 3.
Work Performed by Nuclear Operations Maintenance Name Repair Organization P.O. No., Job No., etc.
Plant Vogte Address
- 4.
Identification Of System 1302/Auxiary Feedwater System
- 6.
(a) Applicable Construction Code ASME SEC IIl 1977
- Edition, Winter 1977
- Addenda, N-249-1 Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL REPAIRED.
ASME CODE OF OF SERIAL BOARD OTHER YEAR REPLACED OR STAMPED COMPONENT MANUFACTURER NO.
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE SUPPORT PULLMAN N/A N/A V2-1302-110-H002 1989 REPLACEMENT -
YES POWER PRODUCTS
- 7.
Description Of Work Snubber AD-503. serial #536 was replaced with AD-503. serial # 238 to support surveiYance testing.
- 8.
Test Conducted:
Hydrostatic [J Pneumatic[]
Nominal Operating Pressuredl NIA [
Other ir Pressure NIA PSI Test Temp.
NWA OF CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code,Section XI.
repair or replacement Type Code Symbol Stamp N/A Certificate of A horization No.
N/A Expiration Date N/A Signed TaZmL eader Date C
//a 12; OwnAl or Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Georgia and employed by Hartford Steam Boiler Inspection and Insurance Co. of Connecticut of Hartford. Connecticut have inspected the components described in this Owner's Report during the period
. 05V3104 to 5- /Z
{
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described in this Owners Report in accordance with the requirements of the ASME
- Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or a loss of any kind arising from or connected with this lns 3
D d<
Commissions GA gol3 Insgctor's Signature National Board, State, Province and Endorsements Date _
-/_
ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section Xl Traveler #
04099 05.J7X04
- 1.
Owner Southern Nuclear Operating Company Namne 40 Inverness Center Parkway, Birmingham, /
- 2.
Plant VogUe Electdc Generating Plant Wavnesboro, GA 30830 Date AL
.Sheet Unit MWO #
I Of I
f-Z %">
C657104 20401503 Repair Organization P.O. No., Job No., etc.
Plant Vogile Address
- 3.
Work Performed by Nuclear Operations Maintenance Name Address 4.'
Identification Of System 1302/Auxliary Feedwater System
- 5.
(a) Applicable Construction Code ASME SEC XIl 1977
- Edition, Wnter 1977
- Addenda, N-249-1 Code Case (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6.
Identification Of Components Repairs Or Replacement Components NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
PIPE SUPPORT PULLMAN N/A N/A V2-1302-108-HO19 1989 REPLACEMENT YES POWER PRODUCTS__
- 7.
Description Of Work SnubberAD-501, senal #415 was replaced with AD-501. sedal #569 to support surveillance testna.
- 8.
Test Conducted:
Hydrostatic !1 Pneumaticr]
Nominal Operating Pressure!
N/ANg Other Pressure N/A PSI TestTemp.
N/A
- F CERTIFICATE OF COMPLIANCE We certify that the statements made in the report are correct and this REPLACEMENT conforms to the rules of the ASME Code, Section Xl.
repair or replacement Type Code Symbol Stamp N/A Certificate of Atorization No.
N/A Expiration Date N/A Signed
/
1 Team Leader Date Owner er Owner's Designee, Title CERTIFICATE OF INSERVICE INSPECTION 1, the undersigned, holding a valid commission Issued by the national Board of boiler and Pressure vessel Inspectors and the State or Province of Geormia and employed by Hartford Steam BoilerInspection and Insurance Co. of Connecticut of Hartford. Connecticut have inspected the components described In this Owner's Report during the period 051V31D4 to 5
and state that to the best of my knowledge and belief, the Owner has performed examinations and taken corrective measures described In this Owners Report In accordance with the requirements of the ASME
- Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report..
Furthermore, neither the Inspector nor his employer shall be liable In any manar for any personal Injury or property damage or a loss of any kind arising from or connected with this 7______g__,_,___
Commissions G*A ;23 Inspector's Signature National Board, State, Province and Endorsements Date 5-IS -o4
ORIGINAL FORM NIS-2 OWNER'S REPORT FOR REPAIRS OR REPLACEMENTS As Required By The Provisions Of The ASME Code Section XI
- Traveler #
04100
- 1. Owner Southern Nuclear Operating Company Date May 11,2004 Name 40 Inverness Center Parkway, Birmingham, AL -
Sheet I
of I
- 2. Plant Address Vogtle Electric Generating Plant Plant Waynesboro, GA 30830 Unit MWO#
Address
- 3. Work Performed by Nuclear Operations Maintenance Name
- 4. Identification Of System 1204) SAFE'
- 5. (a) Applicable Construction Code ASME Section IMI 1977 Edition, (b)Applicable Edition of Section Xl Utilized For Repairs Or Replacements 1989
- 6. Identification Of Components Repairs Or Replacement Components 2
20401504 Repair Organization P.O. No., Job No., etc.
Plant Vogtle Address 17Y INJECTION Wib nter 1977 Addenda, N-249-1 Code Case NAME NAME MANUFACTURER NATIONAL
NO.
IDENTIFICATION BUILT REPLACEMENT (YES OR NO)
Pipe Support Pullman Power WVA WA V2-1204.034-H002 1989 REPLACEMENT YES Products
- 7. Description Of Work Snubber AD-603, serial #372 was replaced with snubber AD-503, serial #660 to support surveillance testing.
S. Tests Conducted:
Hydrostatic 0 Pneumatic a Nominal Operating Pressure 0 NIA E Other El Pressure NWA PSI Test Temp.
N/A OF CERTIFICATE OF COMPLIANCE We certify that the statements made In the report are correct and this replacement conforms to the rules of the ASME Code,Section XI.
repair or replacement Type Code Symbol Stamp NIA Certificate of Au horization No.
NIA Expiration Date NWA Signed Team Leader Date
/
or Owner e Title CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and the State or Province of Georgla and employed by Hartford Steam Boiler Inspection and Insurance Co of Connecticut of Hartford Connecticut have inspected the components described in this Owner's Report during the period May 3,2004 to
_T-q and state that to the best of my knowledge and belief, the Owner has performed examinations and tests and taken corrective measures described In this Owners Report in accordance with the requirements of the ASME Code, Section Xl.
By signing this certificate, neither the Inspector nor his employer makes any warranty, expressed or implied, concerning the examinations and corrective measures described in this Owners Report. Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal Injury or property damage or a loss of any kind arising from or connected with this Commissions (A ;4 0 5 Inspeolor's Signature National Board, State, Province and Endorsements Date 5-- JAI-a'l