September 2003 Monthly Operating Report for Indian Point Unit 3
ML032930283
Person / Time
Site: Indian Point Entergy icon.png
Issue date: 10/15/2003
From: Dacimo F
Entergy Nuclear Northeast
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-03-162
Download: ML032930283 (6)


Text

Entergy Entergy Nuclear Northeast Indian Point Energy Center 295 Broadway. Suite 1 P.O. Box 249 Buchanan, NY 10511-0249 Tel 914 734 5340 Fax 914 734 5718 Fred Dacirno Vice President, Operations October 15, 2003 Re:

Indian Point, Unit No. 3 Docket No. 50-286 NL-03-162 Document Control Desk U.S. Nuclear Regulatory Commission Mail Stop O-P1-17 Washington, DC 20555-0001

Subject:

Monthly Operating Report for September 2003

Dear Sir:

In accordance with Technical Specification 5.6.4, Entergy Nuclear Operations, Inc. (Entergy) hereby submits the Indian Point 3 Monthly Operating Report for the month of September 2003.

There are no commitments contained in this correspondence.

Should you or your staff have any questions regarding this matter, please contact Mr. John McCann, Manager, Licensing, Indian Point Energy Center at (914) 734-5074.

Sincerely, Fred R. Dacimo Vice President, Operations Indian Point Energy Center

/~94

NL-03-162 Page 2 of 2 Attachments cc:

Mr. Hubert J. Miller Regional Administrator - Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, PA 19406-1498 Mr. Patrick D. Milano, Project Manager Project Directorate I Division of Reactor Projects I/Il U.S. Nuclear Regulatory Commission Mail Stop O-8-C2 Washington, DC 20555-0001 Senior Resident Inspector U.S. Nuclear Regulatory Commission Indian Point Unit 2 P.O. Box 38 Buchanan, NY 10511-0038 Senior Resident Inspector U.S. Nuclear Regulatory Commission Indian Point Unit 3 P.O. Box 337 Buchanan, NY 10511-0337 Mr. Paul Eddy State of New York Department of Public Service 3 Empire Plaza Albany, NY 12223

LETTER NO:

DOCKET NO.

UNIT:

DATE:

COMPLETED BY:

TELEPHONE NO:

NL-03-162 Monthly Operating Report Page 1 of 4 50-286 Indian Point 3 10-02-03 T. Orlando (914) 736-8340 OPERATING DATA REPORT OPERATING STATUS 1.

2.

3.

4.

5.

6.

7.

8.

Unit Name:

Indian Point No. 3 Nuclear Power Plant Reporting Period:

September 2003 Licensed Thermal Power (MWt):

3067.4 Nameplate Rating (Gross MWe):

1013 Design Electrical Rating (Net MWe):

979 Maximum Dependable Capacity (Gross MWe):

1014 Maximum Dependable Capacity (Net MWe):

979 If Changes Occur in Capacity Ratings (Items Number 3 through 7) Since Last Report Give Reasons:

9.

Power Level to Which Restricted, If Any (Net MWe):

10.

Reasons for Restrictions, If Any:

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

Hours In Reporting Period Number Of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Availability Factor Unit Capacity factor (Using MDC Net)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate This Month 720 720 0

720 0

2,207,852 739,123 713,908 100 100 101.3 101.3 0

Yr-to-Date 6,551 5,657.83 0

5,540.33 0

16,724,728 5,591,826 5,407,313 84.6 84.6 84.3 84.3 4.9 Cumulative 237,832 151,895.99 0

148,948.18 0

429,449,612 138,191,999 133,444,187 62.6 62.6 58.8*

58.1*

22.4 24.

25.

26.

Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):-

If Shut Down At End Of Report Period. Estimated Date of Startup:_

Units In Test Status (Prior to Commercial Operation):

Forecast INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

  • Weighted averages Achieved

i LETTER NO:

DOCKET NO.:

UNIT:

DATE:

COMPLETED BY:

TELEPHONE NO:

NL-03-162 Monthly Operating Report Page 2 of 4 50-286 Indian Point 3 10-02-03 T. Orlando (914) 736-8340 AVERAGE DAILY UNIT POWER LEVEL MONTH September 2003 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 987 2

987 3

988 4

989 5

990 6

991 7

991 8

991 9

991 10 991 11 991 12 991 13 992 14 991 15 991 16 991 DAY 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 AVERAGE DAILY POWER LEVEL (MWe-Net) 989 992 993 992 992 993 993 994 996 991 994 993 995 995 INSTRUCTIONS: On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

LETTER NO:

DOCKET NO.

UNIT:

DATE:

COMPLETED BY:

TELEPHONE NO.

NL-03-162 Monthly Operating Report Page 3 of 4 50-286 Indian Point 3 10-02-03 T. Orlando (914) 736-8340 UNIT SHUTDOWNS AND POWER REDUCTIONS REPORT MONTH September 2003 DURATION METHOD OF NO.

DATE TYPE DURATION REASON SHUTTING LICENSEE EVENT SYSTEM COMPONENT CAUSE & CORRECTIVE ACTION TO 1

(HOURS) 2 DOWN REPORT#

CODE CODE PREVENT RECURRENCE

=

J J REACTOR 3 J 1 4 5

NONE (1) Type: F: Forced S: Scheduled (2) Reason: A-Equipment (3) Meth B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & Licensee Examination F-Administrative G-Operational Error H-Other (Explain) hod: 1 -Manual 2-Manual Scram 3-Automatic Scrar 4-Other (Explain)

(4) Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event mn Report (LER) File (NUREG - 0161)

(5) Exhibit 1 - Same Source

Letter No.

Docket No.

Unit:

Date:

Completed By:

Telephone No.:

NL-03-162 Monthly Operating Report Page 4 of 4 50-286 Indian Point 3 10-02-03 T. Orlando (914) 736-8340

SUMMARY

OF OPERATING EXPERIENCE September 2003 The Indian Point Unit No. 3 Nuclear Power Plant was synchronized to the bus for a total of 720 hours0.00833 days <br />0.2 hours <br />0.00119 weeks <br />2.7396e-4 months <br />, producing a gross electrical energy generation of 739,123 MWH.