Jeffrey T. Gasser Vice President Southern Nuclear Operating Company, Inc.
40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.7721 Fax 205.992.0403 June 11, 2003 Docket Nos.:
50-424 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant Monthly Operating Reports Ladies and Gentlemen:
Enclosed are the May 2003 Monthly Operating Reports as required by Section 5.6.4 of the Technical Specifications.
Sincerely, ef Tasser Jeffrey T. Gasser JTG/NJS
Enclosures:
El - VEGP Unit I Monthly Operating Report E2 - VEGP Unit 2 Monthly Operating Report cc:
Southern Nuclear Operating Company Mr. J. D. Woodard, Executive Vice President Mr. W. F. Kitchens, General Manager - Plant Vogtle Mr. M. Sheibani, Engineering Supervisor - Plant Vogtle Document Services RTYPE: CVC7000 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Mr. F. Rinaldi, NRR Project Manager - Vogtle Mr. J. Zeiler, Senior Resident Inspector - Vogtle SOUTHERN A COMPANY Enery to Serve Your World' NL-03-1313 "I Isl q
OPERATING DATA REPORT Docket No.:
Unit Name:
Date:
Completed By:
Telephone:
50-424 VEGP UNIT 1 June 1, 2003 Andrew R. Cato (706) 826-3823 Operating Status
- 1. Reporting Period:
- 2. Design Electrical Rating (Net MWe):
- 3. Maximum Dependable Capacity (Net MWe):
May 2003 1169 1152 This Month Year To Date
- 4. Number Of Hours Reactor Was Critical:
- 5. Hours Generator On Line:
- 6. Unit Reserve Shutdown Hours:
- 7. Net Electrical Energy Generated (MWHe):
705.4 693.3 0.0 788,388 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES El-I 3584.4 3572.3 0.0 4,185,397 Cumulative 125,757.0 124,195.5 0.0 139,270,221 Date Tag No.
Event Description N/A N/A N/A
UNIT SHUTDOWNS Docket No.:
Unit Name:
Date:
Completed By:
Telephone:
50-424 VEGP UNIT 1 June 1, 2003 Andrew R. Cato (706) 826-3823 Reporting Period:
May 2003 Type Method of F: Forced Duration Shuttng Cause/Corrective No.
Date (YYMMDD)
S: Scheduled (Hours)
Reason (1)
Down (2)
Actions Comments 2003-01 03/05/09 8
50.7 F
I See Below (1) REASON:
(2) METHOD:
A - Equipment Failure (Explain)
E - Operator Training/License Examination
- 1. Manual
- 4. Continuation B - Maintenance or Test F - Administrative
- 2. Manual Trip/Scram 5. Other C - Refueling G - Operational Error (Explain)
- 3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)
CAUSEICORRECTIVE ACTIONICOMMENTS:
EVENT 2003-01 CAUSE:
Hideout Retum Study Outage CORRECTIVE ACTION:
Perform chemistry sampling and mode change prerequisites CRITICAL PATH WAS:
Perform chemistry sampling and mode change prerequisites NARRATIVE REPORT EI-2 May 01 00:00 Unit 1 at 100% power with no significant operating problems.
May 08 20:00 Unit I at 100% began ramp down for planned hideout return study.
May 09 02:43 Unit I Main Turbine Tripped for planned hideout return study. Generator off-line.
May 09 03:56 Unit I entered Mode 2.
May 09 04:23 Unit I entered Mode 3.
May 10 17:19 Unit 1 entered Mode 2. Commenced Reactor startup.
May 10 18:31 Unit 1 Reactor is critical.
May 11 01:21 Unit I entered mode 1. Ramp up in progress.
May 11 05:28 Unit 1 Generator synchronized to the grid.
May 12 14:00 Unit 1 returned to 100% power following the hideout return study.
May 31 23:59 Unit 1 at 100% power with no significant operating problems.
s
OPERATING DATA REPORT Docket No.:
Unit Name:
Date:
Completed By:
Telephone:
50-425 VEGP UNIT 2 June 1, 2003 Andrew R. Cato (706) 826-3823 Operatina Status
- 1. Reporting Period:
- 2. Design Electrical Rating (Net MWe):
- 3. Maximum Dependable Capacity (Net MWe):
- 4. Number Of Hours Reactor Was Critical:
- 5. Hours Generator On Une:
- 6. Unit Reserve Shutdown Hours:
- 7. Net Electrical Energy Generated (MWHe):
May 2003 1169 1 149 This Month 744.0 744.0 0.0 871,025 Year To Date 3585.7 3572.7 0.0 4,122,932 CHALLENGES TO PRESSURIZER PORV AND PRESSURIZER SAFETY VALVES E2-1 Cumulative 1 12,029.5 111,141.6 0.0 125,334,298
UNIT SHUTPOWNS Docket No.:
Unit Name:
Date:
Completed By:
Telephone:
50-425 VEGP UNIT 2 June 1, 2003 Andrew R. Cato (706) 826-3823 Reporting Period:
May 2003 Type Method of F: Forced Duration Shutting Cause/Corrective No.
Date S: Scheduled (Hours)
Reason (l)
Down (2)
Actions Comments N/A N/A N/A N/A N/A N/A N/A (1) REASON:
(2) METHOD:
A - Equipment Failure (Explain)
E - Operator Training/License Examination
- 1. Manual
- 4. Confinuation B - Maintenance or Test F - Administrative
- 2. Manual Trip/Scram 5. Other C - Refueling G - Operational Error (Explain)
- 3. Automatic Trip/Scram D - Regulatory Restriction H - Other (Explain)
CAUSEICORRECTIVE ACTIONICOMMENTS:
EVENT CAUSE:
CORRECTIVE ACTION:
CRITICAL PATH WAS:
NARRATIVE REPORT IMay 01 00:00 Unit 2 at 100%A power with no significant operating problems.
May 31 23:59 Unit 2 at 100% power with no significant operating problems.
l E2-2