NG-04-0764, November 2004 Monthly Operating Report for Duane Arnold Energy Center
| ML043630346 | |
| Person / Time | |
|---|---|
| Site: | Duane Arnold |
| Issue date: | 12/15/2004 |
| From: | Peifer M Nuclear Management Co |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002, NG-04-0764, TS 5.6.4 | |
| Download: ML043630346 (3) | |
Text
Committed to Nuclear Excellence Duane Arnold Energy Center Operated by Nuclear Management Company, LLC December 15, 2004 NG-04-0764 TS 5.6.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Duane Arnold Energy Center Docket 50-331 License No. DPR -
Monthly Operating Report Please find enclosed the Duane Arnold Energy Center (DAEC) Monthly Operating Report. The report has been prepared in accordance with the guidelines of NRC Generic Letter 97-02: "Revised Contents Of The Monthly Operating Report," and distribution has been made in accordance with DAEC Technical Specifications, Section 5.6.4.
This letter makes no new commitments or changes to any existing commitments.
Mark A. Peifer Site Vice President, Duane Arnold Energy Center NuclearManagement Company, LLC
Enclosure:
(1)'
CC Administrator, Region ll, USNRC Project Manager, DAEC, USNRC Resident Inspector, DAEC, USNRC
.a,
- ., , i '. a _;. .
3277 DAEC Road
- Palo, Iowa 52324-9785 Telephone: 319.851.7611
ENCLOSURE I MONTHLY OPERATING REPORT DOCKET NO. 50-331 UNIT NAME Duane Arnold DATE December 6, 2004 COMPLETED BY Mike Fairchild TELEPHONE (319) 851-7642 REPORTING November 2004 PERIOD:
- 1. Design Electrical Rating (Mwe) 581.40
'-2.Maximum-Dependable Capacity -- -565:50- -
(MWe-Net)
This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was 720.00 7,889.90 209,568.17 Critical
- 4. Number of Hours Generator On-line 720.00 7.853.01 205.138.53
- 5. Reserve Shutdown Hours 0.00 0.00 192.80
- 6. Net Electrical Energy Generated 405,589.60 4.496.172.60 96.451.448.28 (MWHrs)
UNIT SHUTDOWNS Type Method F: Forced of Cause & Corrective S: Duration Shuttinp Action No. Date Scheduled (Hours) Reason ' Down Comments I I I I I I I I 2 Method:
'Reason:
A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)
Page 1 of 2
I -
NARRATIVE
SUMMARY
At the beginning of the month, reactor power was limited to approximately 1500 MWth pending resolution of the 'A" Feedwater Regulating Valve (FRV) control oscillations. On November 4, reactor power was reduced to 889 MWth in preparation for maintenance on the "A" FRV. Following maintenance, full power was achieved on November 5, at 1358. For the remainder of the month, the only other power reductions were for load line adjustments on November 5, 6, 7 and 20.
Page 2 of 2
Text
Committed to Nuclear Excellence Duane Arnold Energy Center Operated by Nuclear Management Company, LLC December 15, 2004 NG-04-0764 TS 5.6.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Duane Arnold Energy Center Docket 50-331 License No. DPR -
Monthly Operating Report Please find enclosed the Duane Arnold Energy Center (DAEC) Monthly Operating Report. The report has been prepared in accordance with the guidelines of NRC Generic Letter 97-02: "Revised Contents Of The Monthly Operating Report," and distribution has been made in accordance with DAEC Technical Specifications, Section 5.6.4.
This letter makes no new commitments or changes to any existing commitments.
Mark A. Peifer Site Vice President, Duane Arnold Energy Center NuclearManagement Company, LLC
Enclosure:
(1)'
CC Administrator, Region ll, USNRC Project Manager, DAEC, USNRC Resident Inspector, DAEC, USNRC
.a,
- ., , i '. a _;. .
3277 DAEC Road
- Palo, Iowa 52324-9785 Telephone: 319.851.7611
ENCLOSURE I MONTHLY OPERATING REPORT DOCKET NO. 50-331 UNIT NAME Duane Arnold DATE December 6, 2004 COMPLETED BY Mike Fairchild TELEPHONE (319) 851-7642 REPORTING November 2004 PERIOD:
- 1. Design Electrical Rating (Mwe) 581.40
'-2.Maximum-Dependable Capacity -- -565:50- -
(MWe-Net)
This Month Yr-to-Date Cumulative
- 3. Number of Hours the Reactor was 720.00 7,889.90 209,568.17 Critical
- 4. Number of Hours Generator On-line 720.00 7.853.01 205.138.53
- 5. Reserve Shutdown Hours 0.00 0.00 192.80
- 6. Net Electrical Energy Generated 405,589.60 4.496.172.60 96.451.448.28 (MWHrs)
UNIT SHUTDOWNS Type Method F: Forced of Cause & Corrective S: Duration Shuttinp Action No. Date Scheduled (Hours) Reason ' Down Comments I I I I I I I I 2 Method:
'Reason:
A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)
Page 1 of 2
I -
NARRATIVE
SUMMARY
At the beginning of the month, reactor power was limited to approximately 1500 MWth pending resolution of the 'A" Feedwater Regulating Valve (FRV) control oscillations. On November 4, reactor power was reduced to 889 MWth in preparation for maintenance on the "A" FRV. Following maintenance, full power was achieved on November 5, at 1358. For the remainder of the month, the only other power reductions were for load line adjustments on November 5, 6, 7 and 20.
Page 2 of 2