NG-04-0436, June 2004 Monthly Operating Report for Duane Arnold Energy Center

From kanterella
Jump to navigation Jump to search
June 2004 Monthly Operating Report for Duane Arnold Energy Center
ML042100250
Person / Time
Site: Duane Arnold NextEra Energy icon.png
Issue date: 07/13/2004
From: Peifer M
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, NG-04-0436
Download: ML042100250 (3)


Text

Nuie Committed to Nuclear Excellene Duane Arnold Energy Center Operated by Nuclear Management Company, LLC July 13, 2004 NG-04-0436 TS 5.6.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station 0-Pl-17 Washington, DC 20555-0001 DUANE ARNOLD ENERGY CENTER DOCKET 50-331 LICENSE No. DPR-49 MONTHLY OPERATING REPORT Please find enclosed the Duane Arnold Energy Center Monthly Operating Report.

The report has been prepared in accordance with the guidelines of NRC Generic Letter 97-02: "Revised Contents Of The Monthly Operating Report," and distribution has been made in accordance with DAEC Technical Specifications, Section 5.6.4.

This letter makes no new commitments or changes to any existing commitments.

Sincerely, Mark A. Peifer Site Vice President, Duane Arnold Energy Center CC Regional Administrator, USNRC, Region III Project Manager, USNRC, NRR NRC Resident Inspector (DAEC)

Enclosure:

OPERATING DATA REPORT .-

1. .

,~~~ ., , -. !1 e'I

~~ : ~ ' '" . ' ' ':  ;,',. . .

1-- TIG4-3277 DAEC Road

  • Palo, Iowa 52324-9785 Telephone: 319.851.7611

July 13, 2004 Enclosure to NG-04-0436 Page 1 of 2 OPERATING DATA REPORT DOCKET NO. 50-331 UNIT NAME Duane Arnold DATE July 2, 2004 COMPLETED BY Mike Fairchild TELEPHONE (319) 851-7642 REPORTING June 2004 PERIOD:

1. Design Electrical Rating (MWe) 581.40
2. Maximum Dependable Capacity 565.50 (MWe-Net)

This Month Yr-to-Date Cumulative

3. Number of Hours the Reactor was 720.00 4,295.57 205,973.84 Critical
4. Number of Hours Generator On-line 720.00 4273.23 201,558.75
5. Reserve Shutdown Hours 0.00 0.00 192.80
6. Net Electrical Energy Generated 412,259.40 2,470.631.70 94,425,907.38 (MWHrs)

UNIT SHUTDOWNS Type Method F: Forced of Cause & Corrective S: Duration Shutting Action No. Date Scheduled tHours) Reason 1 Down Comments

-__ -_ . .Y __ I.

'Reason: 2 Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

July 13, 2004 Enclosure to NG-04-0436 Page 2 of 2 NARRATIVE

SUMMARY

During the month of June departures from full power operation occurred for the following:

1) June 5-6, a sequence exchange.
2) June 7, a load line adjustment.

Text

Nuie Committed to Nuclear Excellene Duane Arnold Energy Center Operated by Nuclear Management Company, LLC July 13, 2004 NG-04-0436 TS 5.6.4 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station 0-Pl-17 Washington, DC 20555-0001 DUANE ARNOLD ENERGY CENTER DOCKET 50-331 LICENSE No. DPR-49 MONTHLY OPERATING REPORT Please find enclosed the Duane Arnold Energy Center Monthly Operating Report.

The report has been prepared in accordance with the guidelines of NRC Generic Letter 97-02: "Revised Contents Of The Monthly Operating Report," and distribution has been made in accordance with DAEC Technical Specifications, Section 5.6.4.

This letter makes no new commitments or changes to any existing commitments.

Sincerely, Mark A. Peifer Site Vice President, Duane Arnold Energy Center CC Regional Administrator, USNRC, Region III Project Manager, USNRC, NRR NRC Resident Inspector (DAEC)

Enclosure:

OPERATING DATA REPORT .-

1. .

,~~~ ., , -. !1 e'I

~~ : ~ ' '" . ' ' ':  ;,',. . .

1-- TIG4-3277 DAEC Road

  • Palo, Iowa 52324-9785 Telephone: 319.851.7611

July 13, 2004 Enclosure to NG-04-0436 Page 1 of 2 OPERATING DATA REPORT DOCKET NO. 50-331 UNIT NAME Duane Arnold DATE July 2, 2004 COMPLETED BY Mike Fairchild TELEPHONE (319) 851-7642 REPORTING June 2004 PERIOD:

1. Design Electrical Rating (MWe) 581.40
2. Maximum Dependable Capacity 565.50 (MWe-Net)

This Month Yr-to-Date Cumulative

3. Number of Hours the Reactor was 720.00 4,295.57 205,973.84 Critical
4. Number of Hours Generator On-line 720.00 4273.23 201,558.75
5. Reserve Shutdown Hours 0.00 0.00 192.80
6. Net Electrical Energy Generated 412,259.40 2,470.631.70 94,425,907.38 (MWHrs)

UNIT SHUTDOWNS Type Method F: Forced of Cause & Corrective S: Duration Shutting Action No. Date Scheduled tHours) Reason 1 Down Comments

-__ -_ . .Y __ I.

'Reason: 2 Method:

A Equipment Failure (Explain) I Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training & License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

July 13, 2004 Enclosure to NG-04-0436 Page 2 of 2 NARRATIVE

SUMMARY

During the month of June departures from full power operation occurred for the following:

1) June 5-6, a sequence exchange.
2) June 7, a load line adjustment.