Summary of September 18, 2025, Public Meeting to Discuss Melco Meltac Rev3 Draft SE Comments (EPID L-2023-TOP-0036) - Memo
ML25328A230
Person / Time
Issue date: 12/05/2025
From: Marshall M
Licensing Processes Branch
To: Aida Rivera-Varona
Office of Nuclear Reactor Regulation
Shared Package
ML25328A234 List:
References
EPID L-2023-TOP-0036
Download: ML25328A230 (0)


Text

OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION December 5, 2025 MEMORANDUM TO:

Aida Rivera-Varona, Acting Director Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation FROM:

Michael L. Marshall, Jr., Acting Branch Chief /RA/

Licensing Projects Branch Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation

SUBJECT:

SUMMARY

OF THE SEPTEMBER 18, 2025, US NUCLEAR REGULATORY COMMISSION PARTIALLY CLOSED OBSERVATION MEETING WITH MITSUBISHI ELECTRIC CORPORATION ON THE DRAFT SAFETY EVALUATION FOR REVISION 3 OF THE TOPICAL REPORT, SAFETY SYSTEM DIGITAL PLATFORM - MELTAC, EPID L-2023-TOP-0036 On September 18, 2025, the U.S. Nuclear Regulatory Commission (NRC) staff held a partially closed observation meeting with the Mitsubishi Electric Corporation (MELCO) to discuss MELCOs comments on the draft safety evaluation (SE) for the 'Review and Approval of JEXU-1041-1008, [Mitsubishi Electric Total Advanced Controller Platform] MELTAC Safety Systems Digital Platform' Topical Report.

The meeting notice is available in the NRCs Agencywide Documents Access and Management System (ADAMS) at Accession No. ML25259A218, and the presentation slides are available at Accession No. ML25259A132. The enclosure to this summary provides the attendees for the meeting as captured by Microsoft Teams (MS Teams) and in the meeting room.

During the meeting, MELCO representatives presented their comments on several topics in the draft SE and asked clarifying questions. The topics focused on the expanded use of MELCO controlled network technology. Specific topics were proprietary in nature, and a summary of the closed meeting discussion is provided as an enclosure to this memorandum The NRC staff expressed appreciation for MELCOs comments and feedback. As a follow-up to the meeting, MELCO mentioned that they plan to add two of the comments to the draft SE comment resolution table for NRCs consideration. No additional feedback was captured during the public comment period of the meeting.

Please direct any inquires to Jeff Smith at 301-415-1057 or via email at jeffery.smith@nrc.gov.

Enclosures:

1. Attendance List
2. Meeting Summary NOTICE: Enclosure to this letter contains Proprietary Information. Upon separation from Enclosure, this letter is DECONTROLLED.

OFFICIAL USE ONLY - PROPRIETARY INFORMATION OFFICIAL USE ONLY - PROPRIETARY INFORMATION U.S. Nuclear Regulatory Commission Public Meeting - Attendees List September 18, 2025

Title:

SUMMARY

OF THE SEPTEMBER 18, 2025, US NUCLEAR REGULATORY COMMISSION PARTIALLY CLOSED OBSERVATION MEETING WITH MITSUBISHI ELECTRIC CORPORATION ON THE DRAFT SAFETY EVALUATION FOR REVISION 3 OF THE TOPICAL REPORT, SAFETY SYSTEM DIGITAL PLATFORM - MELTAC, EPID L-2023-TOP-0036 Participants Name Affiliation/ Role Kerri Kavanagh Nuclear Regulatory Commission (NRC)

Jennie Rankin NRC Ankur Bhattacharya NRC Calvin Cheung NRC Leslie Fields NRC John Robbins NRC Jack Zhao NRC Deanna Zhang NRC Adam McHenry Mitsubishi Electric Power Products, Incorporated (MEPPI)

Chad Modro MEPPI James Dolfi MEPPI Ken Krayvo MEPPI Kenichi Furuno Mitsubishi Electric Corporation (MELCO)

Keiichi Hirabayashi MELCO Kunihiro Yamato MELCO Susumu Okuda MELCO Tomonori Yamane MELCO Jongmin Kim Holtec Monica Haneman Holtec Patrick Essner Holtec Bruce Geddes Southern Engineering Mary H. Miller Public

ML25328A234 (Package)

ML25328A230 (Memo)

ML25259A218 (Notice)

ML25259A132 (Presentation Slides)

ML25328A231 (Summary)

OFFICE NRR/DORL/LLPB/PM NRR/DORL/LLPB/LA NRR/DORL/LLPB/PM NRR/DORL/LLPB/PM NAME ABhattacharya DHarrison JSmith LFields DATE 11/25/25 12/1/25 12/1/2025 12/2/2025 OFFICE NRR/DEX/EICB/BC NRR/DRO/IQVB/BC NRR/DORL/LLPB/BC (Acting)

NRR/DORL/LLPB/PM NAME SDarbali KKavanagh MMarshall ABhattacharya DATE 12/8/25 12/4/2025 12/5/2025 12/5/2025