November 24, 2025 LICENSEE:
Florida Power and Light. NextEra FACILITY:
Point Beach Nuclear Plant, Units 1 and 2, Seabrook Station, Unit 1, St. Lucie Plant, Unit Nos. 1 and 2, Turkey Point Nuclear Generating, Unit Nos. 3 and 4
SUBJECT:
SUMMARY
OF AUGUST 26, 2025, PARTIALLY CLOSED OBSERVATION MEETING WITH FLORIDA POWER AND LIGHT/NEXTERA ON PLANNED ONLINE MONITORING PROGRAM (EPID L-2025-LRM-0102)
On August 26, 2025, the U.S. Nuclear Regulatory Commission (NRC) staff held a partially closed observation virtual meeting with Florida Power and Light/NextEra (NextEra, the licensee). The purpose of the meeting was to discuss to discuss NextEras planned license amendment request (LAR) for implementing online monitoring (OLM) methodology at Point Beach Nuclear Plant, Units 1 and 2, Seabrook Station, Unit 1, St. Lucie Plant Units, 1 and 2, and Turkey Point Nuclear Generating, Units 3 and 4. The meeting notice and agenda, dated July 31, 2025, are available in the NRCs Agencywide Documents Access and Management System (ADAMS) at Accession No. ML25212A067. The enclosure to this summary contains a list of attendees. The licensees presentation slides are available in ADAMS at ML25237A187 (non-proprietary). A portion of the meeting was closed to the public so that meeting participants could discuss sensitive information.
During the meeting, the representatives of NextEra provided an overview of its planned use of topical report, AMS-TR-0720R2-A, to implement its OLM methodology. The licensee described the scope of the LAR, which will revise definitions and add a new OLM program to the technical specifications (TS) at each site. NextEra emphasized the LAR alignment with topical report, industry standards and NRC precedents, as well as and outlined the programs technical implementation, including transmitter selection, data collection and analysis, and noise analysis techniques. The licensee plans to submit the request in October 2025 and will request the NRC to complete the review by October 2026.
During the meeting, the NRC staff described the information needed to support an efficient and thorough review of the LAR. The NRC staff requested that the submittal provides a comprehensive technical basis for transmitter amenability to OLM, including justification for inclusion of each transmitter model, documentation of setpoint coverage, and demonstration of similarity analysis for any transmitter not explicitly listed in the AMS topical report. The NRC staff emphasized the need for clear mapping of the implementation process to AMS-TR-0720R2-A, robust documentation of data acquisition and analysis methods, and clarity on the establishment and application of backstop intervals to maintain defense-in-depth. NextEra stated that the LAR would include detailed technical evaluations for each site, including amenable transmitter lists and similarity analyses, data collection and analysis methods, proposed TS markups, and a summary of lessons learned from previous During the closed portion of the meeting, the representatives of NextEra described the site-specific amenable transmitters that will be part of the planned LAR.
The NRC staff did not make any regulatory decisions at the meeting. Members of the public were not in attendance. Public Meeting Feedback forms were not received Please direct any inquiries to me at (301) 415-1721, or Theo.Edwards@nrc.gov.
/RA/
Theo Edwards, Project Manager Plant Licensing Branch 1 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-266, 50-301, 50-335, 50-389, 50-443, 50-250, and 50-251
Enclosure:
List of Attendees cc: Listserv
Enclosure LIST OF ATTENDEES AUGUST 26, 2025, MEETING WITH FLORIDA POWER AND LIGHT/NEXTERA POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2, SEABROOK STATION, UNIT 1, ST. LUCIE PLANT, UNITS 1 AND 2, AND TURKEY POINT NUCLEAR GENERATING, UNITS 3 AND 4 Name Organization Gilberto Blas U.S. Nuclear Regulatory Commission (NRC)
Norbert Carte NRC Stephen Cumblidge NRC Roberto Torres Davis NRC Theo Edwards NRC Hipo González NRC Michael Marshall NRC Tarico Sweat NRC Ralph Heistand Florida Power and Light/ NextEra (NextEra)
Jarrett Mack NextEra Maribel Valdez NextEra Caleb M. Crosby Analysis and Measurement Services Corporation (AMS)
Greg Morton AMS Brent Shumaker AMS
ML25273A127 (Package)
ML25237A187 (Non-Proprietary)
ML25237A188 (Proprietary)
ML25272A282 (Meeting Summary)
- via eConcurrence NRC-001 OFFICE NRR/DORL/LPL1/PM NRR/DORL/LPL1/LA NRR/DORL/LPL1/BC NRR/DORL/LPL1/PM NAME TEdwards KEntz HGonzález TEdwards DATE 9/26/2025 11/13/2025 11/19/2025 11/24/2025