ML25197A788

From kanterella
Jump to navigation Jump to search
OMB 3150-0139, 2025 NRC Form 327, NRC Form 327, Special Nuclear Material (SNM) and Source Material (SM) Physical Inventory Summary Report, and NUREG/BR-0096, Instructions and Guidance for Completing Physical Inventory
ML25197A788
Person / Time
Issue date: 12/02/2025
From:
NRC/OCIO
To:
Shared Package
ML25197A785 List:
References
OMB 3150-0139
Download: ML25197A788 (0)


Text

NRC FORM 327 (MM-DD-YYYY) 10 CFR 74.31(c)(5),

74.33(c)(4),

74.43(c)(7),

and 74.59(f)(1)

(Physical inventories of SM pertain only to uranium enrichment facilities.)

Instructions: See NUREG/BR-0096 for detailed instructions for completing this form:

http://www.nrc.gov/reading-rm/doc-collections/nuregs/brochures/br0096/

U.S. NUCLEAR REGULATORY COMMISSION SPECIAL NUCLEAR MATERIAL (SNM)

AND SOURCE MATERIAL (SM)

PHYSICAL INVENTORY

SUMMARY

REPORT NRC FORM 327 (MM-DD-YYYY)

F. Material Balance Report APPROVED BY OMB: NO. 3150-0139 EXPIRES: (MM/DD/YYYY)

LINE NUMBER DESCRIPTION GRAM ELEMENTS (U or Pu)

Grams Isotope Isotope Code

  • Indicate whether the entered values are positive or negative by use of appropriate "+" or "-" signs.

1 2

3 4

5

  • 6
  • 7 PLUS BIAS CORRECTION TO ID (Net sum of all bias corrections pertaining to, but not included in the above quantities)

BEGINNING INVENTORY PLUS ADDITIONS TO INVENTORY MINUS SHIPMENTS MINUS MEASURED DISCARDS EQUALS INVENTORY DIFFERENCE MINUS ENDING INVENTORY

  • 8 PLUS SUM OF PRIOR PERIOD AJUSTMENTS THAT AFFECT THE CURRENT PERIOD ID 9

10a 10b 11a 11b EQUALS ADJUSTED INVENTORY DIFFERENCE STANDARD ERROR OF THE ID LIMIT OF ERROR OF THE ID THE LARGER OF "ADDITIONS TO PROCESS" OR REMOVALS FROM PROCESS" ACTIVE INVENTORY 12a 12b LEID LIMIT SEID LIMIT 13 ID LIMIT (BI)

(A)

(S)

(MD)

(ID)

(EI)

(BC)

(PPA)

(ATP)

(RFP)

(AID)

(SEID)

(LEID)

(AI)

NOTE: ANY SPECIAL EXPLANATIONS OR COMMENTS TO THIS COMPLETED FORM SHOUD BE ATTACHED ON A CORPORATE LETTERHEAD.

A. Licensee Name B. Facility Location C. Docket Number D. SNM License Number E. Plant Designation Beginning Date (MM/DD/YYYY)

Ending Date (MM/DD/YYYY)

LEU HEU U-233 Plutonium PU-238 Uranium in Cascades Normal Uranium Depleted Uranium H. Licensee's Certifying Official (Typed or Printed Name and Title)

Signature Date (MM/DD/YYYY)

Estimated burden per response to comply with this mandatory collection request: 4 hours4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br />. This information is submitted by fuel facility licensees to account for special nuclear material. Send comments regarding burden estimate to the FOIA, Library, and Information Collections Branch (T-6 A10M), U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, or by email to infocollects.resource@nrc.gov, and the OMB reviewer at: OMB Office of Information and Regulatory Affairs, (3150-0139), Attn: Desk Officer for the Nuclear Regulatory Commission, 725 17th Street NW, Washington, DC 20503. The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless the document requesting or requiring the collection displays a currently valid OMB control number.

G. Material Type