ML25121A315

From kanterella
Jump to navigation Jump to search
National Organization of Test, Research, and Training Reactors 2024 Presentation by Duane Hardesty and Holly Cruz on the Non-power Production and Utilization Facility License Renewal Final Rule
ML25121A315
Person / Time
Issue date: 10/01/2024
From: Holly Cruz, Duane Hardesty
Office of Nuclear Reactor Regulation
To:
National Organization of Test, Research, & Training Reactors (TRTR)
Shared Package
ML25121A274 List:
References
Download: ML25121A315 (30)


Text

Non-power Production or Utilization Facility (NPUF)

License Renewal Rulemaking Holly Cruz, Chief Non-power Production and Utilization Facility Licensing Branch

2 Relationship of NPUF Entities 2

Class 104 a or c Testing Facilities**

licensed under § 50.21(c) or

§ 50.22 for R&D; accident radiation doses > 1 Rem TEDE associated risk warrant classification as Testing facility Commercial Medical Radioisotope Irradiation and Processing Facilities Research Reactors licensed under § 50.21(c) or § 50.22 for R&D; accident radiation doses

< 1 Rem TEDE Class 103 Research mission

    • Deletes previous power levels and notable safety considerations:

Circulating loop through the core used for fuel experiments Liquid fuel loading Large experimental facility in the core (> 16 in2 in cross-section)

3 9 rulemaking objectives

NPUF Rule Summary 4

Commercial Medical Therapy R&D Testing

1. Create related NPUF definitions
2. Extend applicability of 10 CFR 50.59
3. 10 CFR 50.135 license renewal process

N/A N/A

4. Eliminate NPUF financial qualification information requirement

N/A N/A

5. Amend timely renewal provision
6. Provide an accident dose criterion

N/A

7. Eliminate license terms N/A

N/A

8. Clarify existing environmental reporting requirements
9. Require updated FSAR submittals
1. Related NPUF Definitions
  • Conforming changes to definitions for nonpower reactor, research reactor, etc.

5

Conforming Changes 6

Non-power production or utilization facility means a non-power reactor or other production or utilization facility, licensed under § 50.21(a), § 50.21(c), or

§ 50.22, that is not a nuclear power reactor or a production facility as defined under paragraphs (1) and (2) of the definition of production facility in § 50.2.

Non-power reactor means:

(1) A testing facility; or (2) A research reactor, which is a nuclear reactor licensed under § 50.21(c) or

§ 50.22 for research and development:

(i) For which a safety assessment demonstrates accident radiation doses consistent with § 50.34(a)(1)(ii)(D)(2); and (ii) That is not a testing facility Testing facility means a nuclear reactor licensed under § 50.21(c) or § 50.22 for research and development for which:

(1) Analyzed accident radiation doses are in excess of those set forth in § 50.34(a)(1)(ii)(D)(2); or (2) The Commission determines that the design, operation, or use and the associated risk warrant classification as a testing facility

2. Extend Applicability of 10 CFR 50.59 7

Extend applicability to NPUFs regardless of decommissioning status 10 CFR 50.59 currently is not applicable to NPUFs once fuel is moved offsite Avoid burden of issuing license amendments

3. New License Renewal Process 8

Consolidate license renewal requirements under 10 CFR 50.135 for testing facilities and NPUFs licensed under 10 CFR 50.22 Clarify license renewal process Enhance regulatory efficiency Class 104 a or c Testing Facilities**

licensed under § 50.21(c) or § 50.22 for R&D; accident radiation doses >

1 Rem TEDE associated risk warrant classification as Testing facility Commercial Medical Radioisotope Irradiation and Processing Facilities Research Reactors licensed under § 50.21(c) or § 50.22 for R&D; accident radiation doses

< 1 Rem TEDE Class 103 Research mission

4. Eliminate NPUF Financial Qualification Information Requirement 9

Eliminate 10 CFR 50.33(f)(2) financial qualification requirement at license renewal only Primary means to ensure safety is through NRCs oversight and enforcement programs Reduce licensee burden without compromise to public health and safety Class 104 a or c Testing Facilities**

licensed under § 50.21(c) or § 50.22 for R&D; accident radiation doses >

1 Rem TEDE associated risk warrant classification as Testing facility Commercial Medical Radioisotope Irradiation and Processing Facilities Research Reactors licensed under § 50.21(c) or § 50.22 for R&D; accident radiation doses

< 1 Rem TEDE Class 103 Research mission

5. Amend Timely Renewal Provision Create two-year timely renewal for Class 103 and testing facilities and exempt Class 104a and 104c NPUFs, other than testing facilities 30 days in 10 CFR 2.109 is not a sufficient period of time for adequate assessment of license renewal application Two years would provide sufficient time and allow facility to operate under current license terms 10

11

6. Provide an Accident Dose Criterion
  • Create new accident dose criterion for NPUFs, other than testing facilities, in 10 CFR 50.34
  • Part 20 public dose limits are unnecessarily restrictive as accident criteria
  • Proposed criterion would align with early phase EPA PAG and provide adequate protection from unnecessary exposure to radiation 11
7. Eliminate License Terms 12
  • Exempt Class 104a and 104c NPUFs, other than testing facilities, from 40-year fixed term in 10 CFR 50.51
  • No license term specified in AEA for Class 104 NPUFs
  • Consistent with AEAs minimum regulation standard
  • Reduce burden for licensees and NRC, but maintains public health and safety Class 104 a or c Testing Facilities licensed under § 50.21(c) or § 50.22 for R&D; accident radiation doses >

1 Rem TEDE associated risk warrant classification as Testing facility Commercial Medical Radioisotope Irradiation and Processing Facilities Research Reactors licensed under § 50.21(c) or § 50.22 for R&D; accident radiation doses < 1 Rem TEDE Class 103 Research mission

Implementation 13

  • Separated into 4 groups

- Class 104a and 104c licensed NPUFs, other than testing facilities:

  • Group 1 and 2 issued an immediately effective non-expiring license by Order
  • FSAR update set by Order.

- Group 1 spaced between 1 and 3 years

- Group 2 spaced between 2 and 5 years

- Will be issued a non-expiring license when renewed

- FSAR update based on date non-expiring license issued

- Class 103 and 104c testing facilities

  • Current Class 103 CPs, issued OL with 20 year* term

- FSAR update based on date of issuance of OL

8. Clarify Existing Environmental Reporting Requirements 14 Add requirement in 10 CFR 51.56 for NPUFs to provide an environmental report per 10 CFR 51.45 Historically, NRC has relied on 10 CFR 51.41 to collect environmental information Improve consistency and clarify Part 51 requirements for licensing actions
9. Require Updated FSAR Submittals 15 Extend applicability of 10 CFR 50.71(e) to NPUFs Ensure timely documentation of changes to licensing basis Benefit knowledge management, NRCs inspection program, and licensee operator training and exams

FSAR Contents 16 Examples of things the FSAR Updates should include:

- Changes to the facility or facility operations resulting from new or amended regulatory requirements Changes and the effects of changes to the facility or procedures and experiments that are not described in the FSAR

- licensee changes under 10 CFR 50.59 that result in changes to the FSAR

- evaluations and analyses performed by the licensee to support an amendment to an NPUF operating license under 10 CFR 50.90;

- responses by the licensee to the NRCs requests for additional information

- changes in the facility site environs (e.g., new transportation, military, industrial, or residential facilities near your site

- Refer to Reg Guide 2.7 for more examples

FSAR Submittal 17

- By 10 CFR 50.4, Written communications, and the technical specifications:

- The initial submittal must be on a total replacement basis (i.e., a complete FSAR that will replace the existing docketed FSAR)

- Change pages are acceptable for subsequent updates unless submitted electronically, then a full FSAR is to be submitted.

- The licensee is required to submit a list that identifies the affected pages of the FSAR changed in the submittal

- a certification by a duly authorized officer of the licensee that:

- the information accurately presents changes made since the previous submittal (up to a maximum date of 6 months before the submittal date

- or that no such changes were made or needed

- sensitive or proprietary information that the licensee seeks to have withheld from the public must be marked and submitted in accordance with 10 CFR 2.390

QUESTIONS?

18

19 BACK UP SLIDES

20 20 Purpose of the NPUF Final Rule

  • Implement Commission direction to streamline the license renewal process by establishing a more efficient, effective and focused regulatory framework
  • Fix existing shortcomings in regulations for non-power licensees

Commission directed rulemaking 21

  • The idea to eliminate license terms (or indefinite license term) was discussed in several SECY papers addressing license renewal for research and test reactors.

- SECY-08-0161, Enclosure 1 -

  • license renewal streamlining options including an Extended License Term option which included the concept of indefinite terms

- SRM for SECY-08-0161 states:

  • This long term plan should consider elements of the generic analysis approach, generic siting analysis, and the extended license term described in to SECY-08-0161.

Extended license terms

  • SECY-09-0095, Enclosure 2 discusses extended license terms and explains that the staff needs to study the topic:

The extended license term process could potentially provide significant benefit to RTR licensees while ensuring that the NRC continues to maintain adequate protection of the public and the environment.

22

No Notable Safety Considerations 23

  • Accident dose criterion of 1 Rem TEDE or less

- small fission product inventory

- small radiological consequence for maximum hypothetical accident

  • Low energy systems

- low operating power and temperatures

- minimal decay heat No significant aging considerations

- simple designs

- proactive aging management / aging-related surveillance requirements

- loss of coolant is an analyzed condition

  • Slowly evolving licensing basis

- Very low number of design changes each year

- Few rulemakings apply

No Nexus between License Renewal and Safety Class 104a or c, except testing facilities

  • In light of the following measures:

- NUREG-1537

- Inspection program

- Technical specifications

- Existing reporting requirements

  • Safety issues with SSCs
  • Maintenance activities

- FSAR Update rule requirement 24

25 Summary of the NPUF Proposed Rule

  • Costs and Cost Savings (Undiscounted)
  • Total Net Benefit (Undiscounted): $13 million

- 3 Percent discounting: $8.9 million

- 7 Percent discounting: $5.3 million

- Section 50.109 does not apply to NPUFs

- Section 50.109 not applied to this proposed rule

26 Regulatory Policy - Class 104 The policy for regulation of Class 104 NPUFs is described in the Atomic Energy Act of 1954, as amended, Section 104a. and c.

Sec. 104. Medical Therapy and Research and Development

a. the Commission is directed to permit the widest amount of effective medical therapy possible with the amount of special nuclear material available for such purposes and to impose the minimum amount of regulation consistent with its obligations under this Act to promote the common defense and security and to protect the health and safety of the public.
c. The Commission is directed to impose only such minimum amount of regulation of the licensee as the Commission finds will permit the Commission to fulfill its obligations under this Act to promote the common defense and security and to protect the health and safety of the public and will permit the conduct of widespread and diverse research and development.

26

27 27 Regulatory Policy - Class 103 The policy for regulation of Class 103 NPUFs is described in the Atomic Energy Act of 1954, as amended, Section 103.

Sec. 103. Commercial Licenses

a. The Commission is authorized to issue licenses to persons applying therefor to transfer or receive in interstate commerce, manufacture, produce, transfer, acquire, possess, use100 import, or export under the terms of an agreement for cooperation arranged pursuant to section 123, utilization or production facilities for industrial or commercial purposes.101 Such licenses shall be issued in accordance with the provisions of chapter 16 and subject to such conditions as the Commission may by rule or regulation establish to effectuate the purpose and provisions of this Act.
c. Each such license shall be issued for a specified period, as determined by the Commission, depending on the type of activity to be licensed, but not exceeding forty years from the authorization to commence operations and may be renewed upon the expiration of such period.

27

28 Regulatory Definitions

  • Non-power reactor means a research or test reactor licensed under §§50.21(c) or 50.22 of this part for research and development [10 CFR 50.2 Definitions].
  • Research reactor means a nuclear reactor licensed by the Commission under the authority of subsection 104c of the Act and pursuant to the provisions of § 50.21(c) of this chapter for operation at a thermal power level of 10 megawatts or less, and which is not a testing facility as defined by paragraph (m) of this section [§170.3 Definitions].

28

29 Regulatory Definitions (cont.)

  • Testing facility means a nuclear reactor which is of a type described in §50.21(c) of this part and for which an application has been filed for a license authorizing operation at:

(1) A thermal power level in excess of 10 megawatts; or (2) A thermal power level in excess of 1 megawatt, if the reactor is to contain:

(i) A circulating loop through the core in which the applicant proposes to conduct fuel experiments; or (ii) A liquid fuel loading; or (iii) An experimental facility in the core in excess of 16 square inches in cross-section. [§ 170.3 Definitions]

29

U.S. Non-Power Facilities 30

  • 35 regulated NPUFs 29 reactors operating in 21 States 3 reactors permanently shut down and in decommissioning 3 CPs; Shine, ACU, and Kairos