ENCLOSURE 2 CONTAINS SECURITY RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 Shane Jurek Regulatory Programs Manager - Licensing, PSEG Nuclear PO Box 236 Hancocks Bridge, New Jersey 08038-0221 (989) 573-2817 Shane.Jurek@PSEG.com 10 CFR 50.71(e) 10 CFR 54.37(b)
NEI 99-04 LR-N24-0067 November 14, 2024 United States Nuclear Regulatory Commission Document Control Desk Washington, DC 20555-0001 Hope Creek Generating Station Renewed Facility Operating License No. NPF-57 NRC Docket No. 50-354 Subject : Submittal of Hope Creek Generating Station Updated Final Safety Analysis Report, Revision 27, Submittal of Hope Creek Generating Station Technical Specification Bases Changes, Summary of Revised Regulatory Commitments for Hope Creek, and 10 CFR 54.37(b) Review Results for Hope Creek PSEG Nuclear LLC (PSEG), hereby submits:
Revision 27 to the Hope Creek Generating Station (Hope Creek) Updated Final Safety Analysis Report (UFSAR) in accordance with the requirements of 10 CFR 50.71(e)(4) and 10 CFR 50.4(b)(6).
A complete updated copy of the Hope Creek Technical Specification (TS) Bases in accordance with the requirements of TS 6.15.d.
A summary of changed/closed regulatory commitments that were not reported by other means since the last submittal in April 2023 in accordance with Nuclear Energy Institute (NEI) Topical Report NEI 99-04.
The results of a review performed as required by 10 CFR 54.37(b) to identify any newly-identified Structure, System, or Component (SSC) that would be subjected to an aging management review or evaluation of time-limited aging analyses (TLAAs) in accordance with 10 CFR 54.21.
Revision 27 to the Hope Creek UFSAR is being submitted in its entirety electronically and contains identified text, table, and figure changes required to reflect the plant configuration as of May 14, 2024, six months prior to this submittal. In addition, there are general editorial changes. In accordance with 10 CFR 50.71(e)(2)(ii), a summary of changes made under the provisions of 10 CFR 50.59 but not previously submitted to the NRC is provided in. The previous revision to the Hope Creek UFSAR was issued on April 13, 2023 (ADAMS Accession No. ML23103A323).
November 14, 2024 10 CFR 50.71(e)
Page 2 10 CFR 54.37(b)
LR-N24-0067 NEI 99-04 Based on NRC Regulatory Issue Summary (RIS) 2015-17, Review and Submission of Updates to Final Safety Analysis Reports, Emergency Preparedness Documents, and Fire Protection Documents, PSEG has reviewed Revision 27 of the UFSAR for security-related information (SRI). Consequently, two versions of Revision 27 of the UFSAR are being transmitted separately with this submittal. provides a version of Revision 27 to the Hope Creek UFSAR which redacts the information that is SRI and designates it as Security Related Information - Withheld Under 10 CFR 2.390. Enclosure 1 is suitable for public disclosure. provides the un-redacted version of Revision 27 to the Hope Creek UFSAR and should be withheld from public disclosure under 10 CFR 2.390. The information that is SRI is designated by the statement Security Related Information - Withhold Under 10 CFR 2.390 at the top of the affected pages. Upon separation of Enclosure 2, the remainder of this submittal may be made publicly available. provides a complete updated copy of the Hope Creek TS Bases. This includes changes through October 31, 2024.
In accordance with the NEI process for managing NRC commitments and associated NRC notifications, PSEG performed a review of regulatory commitments to determine if there were any Hope Creek changed/closed commitments that were not reported by other means since the last submittal in April 2023. The review concluded that there were no changed or closed commitments during that time.
An evaluation was completed to determine whether any newly-identified SSCs existed in support of submitting Hope Creek UFSAR, Revision 27. This evaluation involved reviewing pertinent documentation for the period subsequent to the last Hope Creek UFSAR revision.
The evaluation concluded that there were no newly-identified SSCs and no changes to the Hope Creek current licensing basis that would have caused any newly-identified SSCs for which aging management reviews or TLAAs would apply.
As required by 10 CFR 50.71(e)(2)(i), I certify that to the best of my knowledge, the information contained in the Enclosures and Attachments to this letter, which pertains to the Hope Creek UFSAR, Revision 27, accurately reflects information and analyses submitted to the NRC, or prepared pursuant to NRC requirements as described above. There are no new regulatory commitments contained in this letter.
If you have any questions or require additional information, please do not hesitate to contact Mr. Eric Otruba at Eric.Otruba@pseg.com.
Sincerely, Shane Jurek Regulatory Programs Manager - Licensing PSEG Nuclear, LLC Sincerely, Shane Jurek
November 14, 2024 10 CFR 50.71(e)
Page 3 10 CFR 54.37(b)
LR-N24-0067 NEI 99-04 Attachments: - Summary Report of UFSAR Changes
Enclosures:
- Hope Creek UFSAR Revision 27 (Redacted Version - Suitable for Public Disclosure) - Hope Creek UFSAR Revision 27 (Security Related Information - Withhold under 10 CFR 2.390) - Hope Creek Technical Specification Bases cc:
(Cover Letter, Attachment 1, Enclosures 1 and 3)
Administrator - Region I - USNRC USNRC Project Manager - Hope Creek USNRC Senior Resident Inspector - Hope Creek Manager, New Jersey Bureau of Nuclear Engineering
November 14, 2024 10 CFR 50.71(e)
Page 4 10 CFR 54.37(b)
LR-N24-0067 NEI 99-04 bcc:
(Cover Letter, Attachment 1 and Enclosure 3)
Plant Manager - Hope Creek Executive Director, Regulatory Affairs and Nuclear Oversight Director - Site Regulatory Compliance Regulatory Programs Manager - Licensing Site Compliance Commitment Coordinator Records Management
LR-N24-0067 Summary Report of UFSAR Changes
LR-N24-0067 Summary Report of UFSAR Changes 1
HCN#
Section Description Basis21-001 1.8, T1.11-1, 8.3, 9.5, T9.5-2 Implements a change to remove the CO2 fire suppression automatic function and operate the system in manual for various areas.
Fire Protection Change Regulatory Review 21-003 T6.2-16, 7.3 Update information regarding the Reactor Auxiliaries Cooling System supply and return valve bypass functionality.
10 CFR 50.59 Evaluation for Design Change Package (DCP) 80128187 and approved by Fleet Review Committee (FRC)21-021 1.2, 2.1 Update information regarding land within the site boundary that is being leased to the New Jersey Economic Development Authority in support of the offshore wind port development project.
10 CFR 50.59 Evaluation for DCP 80128565 and approved by FRC 21-022 15.4, T15.4-6, T15.4-10, F15.4-4A, F15.4-4B, F15.4-4C Update Control Rod Drop Accident (CRDA) dose calculation to include additional post-CRDA release paths through the gland seal exhausters and steam jet air ejectors.
10 CFR 50.59 Evaluation for DCP 80130650 and approved by FRC 22-011 9.2 Update various operating parameters of service water and river water consistent with ultimate heat sink temperature License Amendment 231 and power level consistent with measurement uncertainty removal License Amendment 212.
10 CFR 50.59 Screen for DCP 80132217 and NRC Safety Evaluations (SEs) for Hope Creek License Amendments 212 and 231 (ADAMS Accession Nos. ML18096A542 and ML21348A713 respectively)22-013 9.5 Change main control room lighting system from fluorescent to LED lighting fixtures.
10 CFR 50.59 Screen for DCP 80131201
LR-N24-0067 Summary Report of UFSAR Changes 2
HCN#
Section Description Basis22-018 10.2 Update low pressure turbine maintenance interval to be maintained by the Preventive Maintenance Program.
The change meets the NEI 98-03 criteria for a non-regulatory change 23-001 3.10, T3.10-2 Update manufacturer information for various safety related inverters.
10 CFR 50.59 Screen for DCP 80132391 and 10 CFR 50.59 Evaluation for DCP 80128252 approved by FRC 23-003 2.1, F2.1-1 Update site description and boundary figures to reflect transfer of certain land ownership to other PSEG corporate entities.
10 CFR 50.59 Screen, 10 CFR 72.48 Screen, 10 CFR 50.54(q)
Evaluation, and 10 CFR 50.54(p)
Evaluation for DCP 80132759 23-004 12.3, 12.5 Update certain personnel qualification requirements to American National Standards Institute/American Nuclear Society (ANSI/ANS)-3.1-2014.
Evaluation performed by Nuclear Oversight 23-005 T7.5-1 Update Regulatory Guide (RG) 1.97 type and classification for the primary containment hydrogen and oxygen concentration variables that were inadvertently omitted during implementation previous revision.
NRC SE for Hope Creek License Amendment 160 (ADAMS Accession No. ML050410361)23-006 9.5 Update that suspended acoustical ceiling panels satisfy American Society for Testing and Material ASTM-E84 requirements.
Fire Protection Change Regulatory review
LR-N24-0067 Summary Report of UFSAR Changes 3
HCN#
Section Description Basis23-007 9.5 Clarify that the commitment to provide fire and smoke detection in rooms with combustible loading in excess of 8,000 BTU/ft2 is limited to safety-related areas.
Fire Protection Change Regulatory review 23-008 T15.6-12, 15A.6, 15A.10 Editorial changes to correct improperly incorporated HCNs regarding parameters and computer code versions used in accident analyses.
The change meets the NEI 98-03 criteria for a non-regulatory change 23-009 10.4 Removes specified inspection frequency for at least one turbine bypass valve based on revision to Nuclear Electric Insurance Limited Loss Control Manual.
10 CFR 50.59 Screen 23-010 8.3 Editorial correction to intentionally left blank page.
The change meets the NEI 98-03 criteria for a non-regulatory change 24-001 9.4 Clarify that the B VH401 Fan Inlet Damper is secured open per temporary change and no longer has automatic closing function.
10 CFR 50.59 Screen for DCP 80135920 24-002 6.2, T6.2-22, T6.2-23 Update ANSI/ANS code standard referenced to ANSI/ANS 56.8-2020 for primary containment integrated leak rate test.
10 CFR 50.59 Screen 24-003 Appendix-A, Table A-5 Restore Commitment 38 text that was inadvertently deleted in previous revision.
The change meets the NEI 98-03 criteria for a non-regulatory change
LR-N24-0067 Summary Report of UFSAR Changes 4
HCN#
Section Description Basis24-005 7.7, 10.2 Update that a loss of stator cooling causes a turbine trip and no longer causes a recirculation pump runback.
10 CFR 50.59 Screen for DCP 80136073 24-006 3.6, 15.2 Update that the Low-Low Suction Pressure Trips to the B and C reactor feedwater pumps have been restored following removal of a temporary design change.
10 CFR 50.59 Screen for DCP 80129612 24-007 6.2, T6.2-16, T6.2-24, F6.2-27, 9.3, T 9.3-3 Remove Post Accident Sampling System valves as primary containment isolation valves.
10 CFR 50.59 Screen for DCP 80136292 24-008 Master TOC, 15.2, 15D.2, 15D.3, 15D.4, 15D.5, T15D-1, T15D-2, T15D-3, T15D-5, T15D-6, T15D-7, T15D-8, T15D-9, F15D-1, F15D-2, F15D-3, F15D-4, F15D-5 Update cycle-specific reload analysis results for Cycle 26 and implementation of the Pressure Regulator Out of Service operating condition.
10 CFR 50.59 Screen for DCP 80133560 24-009 5.2, T5.2-10, F5.2-11 Update to temporarily replace B recirculation pump outer seal element flow detection switch with 1/2 piping.
10 CFR 50.59 Screen for DCP 80136057 24-011 1.2 Update land ownership to other PSEG entity to supplement HCN 23-003.
The change meets the NEI 98-03 criteria for a non-regulatory change 24-013 All Formatting changes to clean up latent formatting errors, improve legibility, and eliminate blank pages.
The change meets the NEI 98-03 criteria for a non-regulatory change 24-014 TOC 2, TOC 5, TOC 6, TOC 7, TOC 9, TOC 12, TOC 15 Correct multiple Table of Contents (TOC) editorial errors.
The change meets the NEI 98-03 criteria for a non-regulatory change
LR-N24-0067 Summary Report of UFSAR Changes 5
HCN#
Section Description Basis24-015 T3.8-2, T3.9-4l, T3.9-4v, F4.4-1, T9A-2, T9A-3, T9A-4, T9A-5, 15.1, 15.8 Correct multiple typographical errors and HCNs that were previously incorporated incorrectly.
The change meets the NEI 98-03 criteria for a non-regulatory change
LR-N24-0067 Hope Creek UFSAR Revision 27 (Redacted Version - Suitable for Public Disclosure)
(6169 Pages Total)
LR-N24-0067 SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 Hope Creek UFSAR Revision 27 (Security Related Information - Withhold under 10 CFR 2.390)
(6169 Pages Total)
LR-N24-0067 Technical Specification Bases (137 Pages Total)