ML24197A062
Jump to navigation
Jump to search
| ML24197A062 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 07/15/2024 |
| From: | NRC/RGN-III/DORS/OB |
| To: | Detroit Edison, Co |
| Bryan Bergeon | |
| Shared Package | |
| ML24088A296 | List: |
| References | |
| Download: ML24197A062 (1) | |
Text
Form 5.1-1 Postexamination Check Sheet Postexamination Check Sheet Facility: Fermi II Dates of Examination: June 12, 2024 Activity Description Date Complete
- 1. *Received postexamination package from facility licensee and verified complete. (ES-4.4) 06/14/2024
- 2. *Reviewed and incorporated any necessary facility and applicant written examination comments. NRC grading of written examination completed. (ES-4.4)
N/A
- 3. *Reviewed and incorporated any necessary facility and applicant operating test comments. NRC grading of operating test completed.
(ES-3.6) 06/14/2024
- 4. *Completed NRC chief examiner review of operating test and written examination grading. (ES-3.6 and ES-4.4) 06/14/2024
- 5. Completed licensing official review.
06/21/2024
- 6. Mailed licenses, preliminary results, and pass letters.
06/24/2024
- 7. Notified facility licensee of results.
06/21/2024
- 8. Issued the examination report (refer to Operator Licensing Manual Chapter (OLMC) 510, Operator Licensing Examination Reports).
07/09/2024
- 9. Returned reference material after final resolution of any informal NRC staff reviews, hearing demands, or both.
N/A
- 10. Performed examination recordkeeping activities (refer to OLMC 520, Operator Licensing Examination Records and Documentation, and Management Directive 3.53, NRC Records and Document Management Program).
07/15/2024
- Activity may not be applicable for a retake examination. If this activity does not apply, place an N/A in the Date Complete column.