February 15, 2024 LICENSEE:
Tennessee Valley Authority FACILITY:
Sequoyah Nuclear Plant, Units 1 and 2
SUBJECT:
SUMMARY
OF FEBRUARY 8, 2024, PUBLIC PREAPPLICATION MEETING WITH TENNESSEE VALLEY AUTHORITY REGARDING A FUTURE LICENSE AMENDMENT REQUEST RELATED TO TECHNICAL SPECIFICATION SURVEILLANCE REQUIRMENT 3.8.1.8 (EPID L-2024-LRM-0008)
On February 8, 2024, the U.S. Nuclear Regulatory Commission (NRC) staff held a virtual public meeting with representatives from Tennessee Valley Authority (TVA). The purpose of the meeting was to discuss the licensees plans to submit a license amendment request applicable to Sequoyah Nuclear Plant, Units 1 and 2 (Sequoyah) to delete technical specification surveillance requirement 3.8.1.8. The meeting notice and agenda, dated January 18, 2024, are available in the NRCs Agencywide Documents Access and Management System (ADAMS) under Accession No. ML24037A230. A list of attendees is provided in the enclosure.
During the meeting, the licensee presented information (ADAMS Accession No. ML24037A025) regarding the Sequoyah Technical Specifications 3.8.1, AC [alternating current] Sources -
Operating, and 3.8.2, AC Sources - Shutdown, and their applicability to the current configuration of offsite electrical power connections.
In response to the TVA presentation, the NRC staff discussed with TVA the following elements that would help ensure a comprehensive license amendment request:
- 1. Include the history of surveillance requirement 3.8.1.8 for context.
The NRC staff did not make any regulatory decisions or commitments at the meeting. There were no members of the public in attendance.
Please direct any inquiries to me at 301-415-1383 or by e-mail to Perry.Buckberg@nrc.gov.
/RA/
Perry H. Buckberg, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-327 and 50-328
Enclosure:
List of Attendees cc: Listserv
Enclosure LIST OF ATTENDEES FEBRUARY 8, 2024, VIRTUAL PUBLIC MEETING WITH TENNESSEE VALLEY AUTHORITY, ET AL.
SEQUOYAH NUCLEAR PLANT, UNITS 1 AND 2 PRE-APPLICATION MEETING REGARDING TECHNICAL SPECIFICATION SURVEILLANCE REQUIREMENT 3.8.1.8 U.S. Nuclear Regulatory Commission Perry Buckberg, NRR1 /DORL2 /LPLII-23 Steve Wyman, NRR/DEX4 /EEEB5 Tennessee Valley Authority Andrew Taylor Rebecca Travis Paul Parashak Andrew McNeil Tamatha Womack Shawna Hughes Jasjit Grewal Jesse Baron Frank Girault 1 Office of Nuclear Reactor Regulation 2 Division of Operating Reactor Licensing 3 Plant Licensing Branch II-2 4 Division of Engineering and External Hazards 5 Electrical Engineering Branch
ML24044A034 (Package)
ML24044A037 (Summary)
ML24037A025 (Presentation)
ML24037A230 (Meeting Notice)
OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA NRR/DEX/EEEB/BC NRR/DORL/LPL2-2/BC NAME PBuckberg ABaxter WMorton (VGoel for)
DWrona DATE 02/15/2024 02/15/2024 02/15 /2024 2 /15/2024 OFFICE NRR/DORL/LPL2-2/PM NAME PBuckberg DATE 02/15/2024