(04-2022)
Materials Inspection Report
U.S. NUCLEAR REGULATORY COMMISSION
Page 1 of 1
Add Continuation Page
1. Licensee/Location Inspected:
Cadillac Castings, Inc.
1500 Fourth Ave.
Cadillac, MI 49601
Report Number(s) 2023-001
2. NRC/Regional Office
Region III
U. S. Nuclear Regulatory Commission
2443 Warrenville Road, Suite 210
Lisle, IL 60532-4352
3. Docket Number(s)
030-32072
4. License Number(s)
21-26282-01
5. Date(s) of Inspection
November 29, 2023
LICENSEE:
The inspection was an examination of the activities conducted under your license as they relate to radiation safety and to compliance with the
Nuclear Regulatory Commission (NRC) rules and regulations and the conditions of your license. The inspection consisted of selective
examinations of procedures and representative records, interviews with personnel, and observations by the inspector. The inspection findings
are as follows:
1. Based on the inspection findings, no violations were identified.
2. Previous violation(s) closed.
3. During this inspection, certain of your activities, as described below and/or attached, were in violation of NRC requirements, and
were assessed at Severity Level IV, in accordance with the NRC Enforcement Policy.
B. The following violation(s) is/are being cited in accordance with NRC Enforcement Policy. This form is a NOTICE OF VIOLATION,
which may be subject to posting in accordance with 10 CFR 19.11.
(Violations and Corrective Actions)
Statement of Corrective Actions
I hereby state that, within 30 days, the actions described by me to the Inspector will be taken to correct the violations identified. This statement of corrective
actions is made in accordance with the requirements of 10 CFR 2.201 (corrective steps already taken, corrective steps which will be taken, date when full
compliance will be achieved). I understand that no further written response to NRC will be required, unless specifically requested.
A. The violation(s), specifically described to you by the inspector as non-cited violations, are not being cited because they were self-
identified, non-repetitive, corrective action was or is being taken, and the remaining criteria in the NRC Enforcement Policy
were satisfied.
(Non-cited violation(s) was/were discussed involving the following requirement(s)
TITLE
NRC INSPECTOR
PRINTED NAME
SIGNATURE AND DATE
LICENSEE'S
REPRESENTATIVE
Jason Dykert; Earlon Shirley
BRANCH CHIEF
Jason C. Dykert
Digitally signed by Jason C. Dykert
Date: 2023.12.04 09:12:44 -07'00'
5KH[(GZDUGV
Digitally signed by Rhex A. Edwards
Date: 2023.12.22 07:05:56 -06'00'
(10-04-2022)
U.S. NUCLEAR REGULATORY COMMISSION
Materials Inspection Record
Page 1 of 1
NRC Form 592M (10-04-2022)
1. Licensee Name:
Cadillac Castings, Inc.
2. Docket Number(s):
030-32072
3. License Number(s)
21-26282-01
4. Report Number(s):
2023-001
5. Date(s) of Inspection:
11/29/2023
6. Inspector(s):
Jason Dykert; Earlon Shirley
7. Program Code(s):
03120
8. Priority:
5
9. Inspection Guidance Used:
10. Licensee Contact Name(s):
Erik Olson - RSO
11. Licensee E-mail Address:
eolson@cadillaccasting.com
12. Licensee Telephone Number(s):
231-779-9600
13. Inspection Type:
Initial
Routine
Announced
Non-Routine
Unannounced
14. Locations Inspected:
Hybrid
Main Office
Field Office
Temporary Job Site
Remote
15. Next Inspection Date (MM/DD/YYYY):
11/29/2028
Normal
Reduced
Extended
No change
16. Location(s) Inspected List:
1500 Fourth Avenue, Cadillac, MI
17. Scope and Observations:
This was an assist inspection for Region III. The last routine inspection in 2018 identified 2 SLIV violations, for failure
to perform leak tests at least once every three years, and failing to perform annual audits each year. Corrective
actions for these violations were reviewed during this inspection. Cadillac Castings possessed one fixed gauge, a
Thermo Process Instruments 5201, for monitoring the level of raw material going into a melting furnace.
The inspectors interviewed the RSO and observed the installed gauge in use. Area postings were adequate,
independent surveys indicated the gauge shielding was intact as area dose rates were minimal. The inspectors
observed the RSO properly collect samples for leak test analysis and perform a shutter test. The inspectors
reviewed records of previous leak test results, which had been completed as required since the last inspection. The
RSO had a work order generated every six months to ensure physical inventory and shutter tests were performed as
required. The RSO also performed audits of the program each time the work order was generated, and wrote notes
on the work order form to document the audit. Both violations from 2018 are considered closed.
The inspectors noted that the licensee's fixed gauge had been exchanged by the manufacturer in 2011 with a
generally licensed device (s/n B5414) that is still listed in GLTS under recipient code GL-60803. The licensee has
kept this gauge under their specific license and covered the GL label as permitted under 10 CFR 31.5(c)(8)(iii)(B).
However, the licensee is considering terminating the specific license and reverting to possessing the gauge under a
general license as permitted by 10 CFR 31.5(c)(9), and would make the required report if such a transfer occurred.
The RSO stated that they would plan to coordinate any potential future efforts with Region III licensing staff.
No violations of NRC requirements were identified as a result of this inspection.
Signature and Date - Branch Chief
Digitally signed by Rhex A. Edwards
Date: 2023.12.22 07:05:31 -06'00'