Letter Sequence Request |
|---|
EPID:L-2023-CPS-0000, International, Issuance of Materials License SNM-2516 for the HI-STORE Consolidated Interim Storage Facility ISFSI (Approved, Closed) |
Initiation
- Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request, Request
- Acceptance...
Results
Other: ML23268A446, ML23269A176, ML23276B399, ML23296A220, ML23304A209, ML23324A117, ML23338A235, ML23346A016, ML24002B139, ML24024A226, ML24033A181, ML24043A217, ML24046A173, ML24057A387, ML24103A176, ML24103A178, ML24135A260, ML24135A263, ML24193A214, ML24193A244
|
MONTHYEARML23132A3042023-05-22022 May 2023 April 11, 2023 Summary of Closed Meeting with Kairos Power, LLC Regarding Consultations Under National Historic Preservation Act Project stage: Request ML23151A7432023-05-31031 May 2023 Kairos Power, LLC, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), Revision 3 Project stage: Request ML23158A2652023-06-13013 June 2023 Safety Evaluation for the Kairos Power LLC Construction Permit Application for the Hermes Non-Power Test Reactor Project stage: Request ML23195A1222023-07-14014 July 2023 Submittal of the Construction Permit Application for the Hermes 2 Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor. with Enclosure 11 Affidavit Project stage: Request ML23276B3992023-10-0303 October 2023 Email to Kairos Providing the Hermes 2 General Audit Plan Project stage: Other ML23268A4462023-10-0303 October 2023 Hermes 2 General Audit Plan Project stage: Other ML23269A1762023-10-11011 October 2023 Kairos Hermes 2 Construction Permit Application Scheduling and Resource Letter Project stage: Other ML23296A2202023-10-13013 October 2023 Hermes 2 General Audit Questions 1.5-1 and 1.5-2 Project stage: Other ML23300A1442023-10-27027 October 2023 Kairos Power Response to Hermes 2 General Audit Question 1.5-2 Project stage: Request ML23304A2092023-10-31031 October 2023 Hermes 2 General Audit Questions 1.3-1 and 13.1-1 Project stage: Other ML23324A1172023-11-20020 November 2023 Hermes 2 General Audit Questions 2.1-1, 2.1-2, 2.2-1 Through 4, 2.5-1, 7.1-1, 7.2-1, and 7.2-2 Project stage: Other ML23338A2352023-12-0404 December 2023 Hermes 2 General Audit Questions 7.1-2, 7.1-3, 7.1-4, 7.1-5, and 7.2-3 Project stage: Other ML23346A0162023-12-11011 December 2023 Hermes 2 General Audit Questions 3.5-1, 4.3-1, 5.2-1, 7.4-1, 9.8-1, 11.1-1, 13.1-1 Through 13.1-6, 13.2-1, 14.1-1, and 14.1-2 Project stage: Other ML23349A1472023-12-15015 December 2023 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 2 Project stage: Request ML23349A1482023-12-15015 December 2023 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 2 Project stage: Request ML23355A1922023-12-21021 December 2023 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 3 and Chapter 5 Project stage: Request ML23355A1612023-12-21021 December 2023 Kairos Power, LLC - Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 4 Project stage: Request ML23355A1622023-12-21021 December 2023 Kairos Power, LLC - Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 4 Project stage: Request ML23356A0782023-12-22022 December 2023 Kairos Power, LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 13 and KP-TR-022 Project stage: Request ML24002B1392024-01-0202 January 2024 Hermes 2 General Audit Questions 2.5-2, 2.5-3, 4.3-2, 4.3-3, 4.5-1, 5.1-1, 5.1-2, 5.1-3, 5.2-2, 5.2-3, 5.2-4, 5.2-5, 6.3-1, 9.1-1, 9.1-2, 9.6-1, 13.1-7 Through 10, TR-1, TR-2, TR-3 Project stage: Other ML24003A7662024-01-0303 January 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapters 4, 5, 7, and 13 Project stage: Request ML24003A7652024-01-0303 January 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapters 4, 5, 7, and 13 Project stage: Request ML24009A2472024-01-0909 January 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 9 Project stage: Request ML24011A2902024-01-11011 January 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 9 Project stage: Request ML24024A2262024-01-24024 January 2024 Hermes 2 General Audit Question 13.1-11 Project stage: Other ML24025C6852024-01-24024 January 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 3 and Chapter 9 Project stage: Request ML24026A2992024-01-26026 January 2024 Kairos Power LLC - Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 7 Project stage: Request ML24026A3002024-01-26026 January 2024 Kairos Power LLC - Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 7 Project stage: Request ML24033A1812024-02-0202 February 2024 Hermes 2 General Audit Questions 5.2-6, 5.2-7, 5.2-8, and 5.2-9 Project stage: Other ML24039A1892024-02-0808 February 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 2 Project stage: Request ML24039A1912024-02-0808 February 2024 Kairos Power LLC, Changes to Hermes 2 PSAR Chapter 2 Project stage: Request ML24043A2172024-02-12012 February 2024 Hermes 2 General Audit Questions 5.2-10, 5.2-11, and 5.2-12 Project stage: Other ML24046A1732024-02-15015 February 2024 Hermes 2 General Audit Question 9.3-1 Project stage: Other ML24057A3872024-02-26026 February 2024 Hermes 2 General Audit Questions 5.2-13, 5.2-14, and 5.2-15 Project stage: Other ML24072A2972024-03-12012 March 2024 Kairos Power LLC - Transmittal of Changes to Hermes 2 Construction Permit Application – PSAR Chapter 7 Project stage: Request ML24073A3172024-03-13013 March 2024 Kairos Power LLC, Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 13 and KP-TR-022 Project stage: Request ML24103A1762024-04-12012 April 2024 Transmittal Email from NRC to Kairos Power LLC, Request for Confirmation of Information for the Hermes 2 Preliminary Safety Analysis Report Project stage: Other ML24103A1782024-04-12012 April 2024 Request for Confirmation of Information for Hermes 2 PSAR Project stage: Other ML24103A2432024-04-12012 April 2024 Kairos Power, LLC, Reponses to NRC Requests for Confirmation of Information for the Review of the Hermes 2 PSAR Chapter 5 Project stage: Request ML24135A2632024-05-14014 May 2024 Request for Confirmation of Information 3 for Hermes 2 Preliminary Safety Analysis Report Project stage: Other ML24135A2602024-05-14014 May 2024 Transmittal Email for Request for Confirmation of Information 3 for Hermes 2 Preliminary Safety Analysis Report Project stage: Other ML24138A2142024-05-16016 May 2024 Enclosure 2: Supplemental Information on Rupture Disk Design Code Evaluation (non-proprietary) Project stage: Request ML24193A2442024-07-11011 July 2024 Transmittal Email for the Summary Report for the Regulatory Audit of the Hermes 2 Preliminary Safety Analysis Report Project stage: Other ML24193A2142024-07-11011 July 2024 Summary Report for the Regulatory Audit of the Kairos Power Hermes 2 Preliminary Safety Analysis Report - General Audit Project stage: Other ML24200A1152024-07-19019 July 2024 Safety Evaluation for the Kairos Power LLC Construction Permit Application for the Hermes 2 Non-power Test Reactor Facility Project stage: Approval ML24200A1172024-07-19019 July 2024 Transmittal Letter for the Hermes 2 Safety Evaluation Project stage: Approval 2024-01-02
[Table View] |
Text
KP-NRC-2312-002 Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211 December 21, 2023 Docket No. 50-611 Docket No. 50-612 US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Kairos Power LLC Transmittal of Changes to Hermes 2 Construction Permit Application - PSAR Chapter 4
References:
- 1. Letter, Kairos Power LLC to Document Control Desk, Submittal of the Preliminary Safety Analysis Report for the Hermes 2 Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes 2), Revision 0, July 14, 2023 (ML23195A122)
- 2. Audit Plan, Nuclear Regulatory Commission, Kairos Power LLC - Plan for a General Audit of the Hermes 2 Construction Permit Application (EPID No. L-2023-CPS-0000),
October 3, 2023, (ML23268A446)
In July 2023, Kairos Power submitted Revision 0 of the Preliminary Safety Analysis Report (PSAR)
(Reference 1) as part of the Construction Permit Application (CPA) for the Hermes 2 non-power reactor.
This letter transmits changes to the pages of the PSAR to address NRC feedback received on PSAR Chapter 4 in the General Audit (Reference 2). Changes to the pages of the PSAR are provided in. Kairos Power requests NRC review of these changes as part of the continued review of the Hermes 2 CPA.
If you have any questions or need any additional information, please contact Nicole Schlichting at schlichting@kairospower.com or (980) 215-9252, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on December 21, 2023 Sincerely, Peter Hastings, PE Vice President, Regulatory Affairs and Quality
Enclosure:
Changes to Hermes 2 PSAR Chapter 4
KP-NRC-2312-002 Page 2 xc (w/enclosure):
William Jessup, Chief, NRR Advanced Reactor Licensing Branch Michael Orenak, Project Manager, NRR Advanced Reactor Licensing Branch Matthew Hiser, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor Licensing Branch Samuel Cuadrado de Jesus, Project Manager, NRR Advanced Reactor Licensing Branch Cayetano Santos, Project Manager, NRR Advanced Reactor Licensing Branch