ML23047A389
| ML23047A389 | |
| Person / Time | |
|---|---|
| Issue date: | 02/28/2023 |
| From: | Couret I Office of Public Affairs |
| To: | |
| References | |
| NUREG-1350, Vol. 34 | |
| Download: ML23047A389 (1) | |
Text
- The Atomic Energy Commission issued a provisional operating license allowing commercial operations.
Notes: This list is limited to reactors licensed to operate. Year is based on the date the initial full-power operating license was issued.
NRC-abbreviated reactor names are listed. Data are current as of September 2022.
1969 Dresden 2*
Ginna*
Nine Mile Point 1*
(1974) 1970 Point Beach 1*
Robinson 2 1971 Dresden 3 Monticello 1* (1970) 1972 Quad Cities 1 Quad Cities 2 Surry 1 Turkey Point 3 1973 Browns Ferry 1 Oconee 1 Oconee 2 Peach Bottom 2 Point Beach 2*
Surry 2 Turkey Point 4 1974 Arkansas Nuclear 1 Browns Ferry 2 Brunswick 2 Calvert Cliffs 1 Cooper D.C. Cook 1 FitzPatrick Hatch 1 Oconee 3 Peach Bottom 3 Prairie Island 1 Prairie Island 2 1975 Millstone 2 1976 Beaver Valley 1 Browns Ferry 3 Brunswick 1 Calvert Cliffs 2 Salem 1 St. Lucie 1 1977 Davis-Besse 1 D.C. Cook 2 Farley 1 1978 Arkansas Nuclear 2 Hatch 2 North Anna 1 1980 North Anna 2 Sequoyah 1 1981 Farley 2 McGuire 1 Salem 2 Sequoyah 2 1982 LaSalle 1 Summer 1 Susquehanna 1 1983 McGuire 2 St. Lucie 2 1984 Callaway Columbia Diablo Canyon 1 Grand Gulf 1 LaSalle 2 (1983)
Susquehanna 2 1985 Byron 1 Catawba 1 Diablo Canyon 2 Fermi 2 Limerick 1 Palo Verde 1 River Bend 1 Waterford 3 Wolf Creek 1 1986 Catawba 2 Hope Creek 1 Millstone 3 Palo Verde 2 Perry 1 1987 Beaver Valley 2 Braidwood 1 Byron 2 Clinton 1 Harris 1(1986)
Nine Mile Point 2 Palo Verde 3 Vogtle 1 1988 Braidwood 2 South Texas Project 1 1989 Limerick 2 South Texas Project 2 Vogtle 2 1990 Comanche Peak 1 Seabrook 1 1993 Comanche Peak 2 1996 Watts Bar 1 2015 Watts Bar 2 APPENDIX E Commercial Nuclear Power Reactor Operating Licenses Issued by Year