ML23047A386

From kanterella
Jump to navigation Jump to search
App B Pages from Final_Section 6-2022-23-2
ML23047A386
Person / Time
Issue date: 02/28/2023
From: Couret I
Office of Public Affairs
To:
References
NUREG-1350, Vol. 34
Download: ML23047A386 (1)


Text

100 l APPENDICES Applicant Docket Number Type Submittal Date Design Site State Existing Plant?

Date Accepted Status Combined License (Construction and Operating)

Nuclear Innovation North America, LLC (NINA) 05200012 &

05200013 COL 09/20/07 09/20//07 ABWR South Texas Project, Units 3 and 4 TX Yes 11/29/07 COL terminated 07/12/2018 Tennessee Valley Authority (TVA) 05200014 &

05200015 COL 10/30/07 AP1000 Bellefonte, Units 3 and 4 AL No 01/18/08 Withdrawn-12/02/2016 Dominion Virginia Power 05200017 COL 11/27/07 ESBWR North Anna, Unit 3 VA Yes 01/28/08 COL Issued 06/02/2017 Duke Energy Carolinas 05200018 &

05200019 COL 12/13/07 AP1000 Lee Nuclear Station, Units 3 and 4 SC No 02/25/08 COL Issued 12/19/2016 Progress Energy 05200022 &

05200023 COL 02/19/08 AP1000 Shearon Harris, Units 2 and 3 NC Yes 04/17/08 Suspended-05/02/2013 Southern Nuclear Operating Co., Inc.

05200025 &

05200026 COL 03/28/08 AP1000 Vogtle, Units 3 and 4 GA Yes 05/30/08 COL Issued 02/10/2012 AmerenUE 05200037 COL 07/24/08 U.S. EPR Callaway, Unit 2 MO Yes 12/12/08 Withdrawn-10/29/2015 DTE Electric Company 05200033 COL 09/18/08 ESBWR Fermi, Unit 3 MI Yes 11/25/08 COL Issued 05/01/2015 Luminant Generation Co.

05200034 &

05200035 COL 09/19/08 US-APWR Comanche Peak, Units 3 and 4 TX Yes 12/02/08 Suspended-03/31/2014 Entergy 05200036 COL 09/25/08 ESBWR River Bend, Unit 3 LA Yes 12/04/08 Withdrawn-06/14/2016 PPL Bell Bend 05200039 COL 10/10/08 U.S. EPR Bell Bend (1 Unit)

PA Yes 12/19/08 Withdrawn-09/22/2016 Florida Power and Light 05200040 &

05200041 COL 06/30/09 AP1000 Turkey Point, Units 6 and 7 FL Yes 09/04/09 COL Issued 04/12/2018 Duke Energy Florida 05200029 &

05200030 COL 07/30/08 AP1000 Levy County, Units 1 and 2 FL No 10/06/08 COL Terminated 04/26/2018 Oklo Power LLC 05200049 COL 03/11/20 Aurora Idaho National Laboratory ID No 06/05/20 Denied-06/06/2022 APPENDIX B New Nuclear Power Plant Licensing Applications

APPENDICES l 101 Applicant Docket Number Type Submittal Date Design Site State Existing Plant?

Date Accepted Status Design Certification AREVA NP 05200020 DC 12/11/07 U.S. EPR N/A N/A N/A 02/25/08 Suspended-03/27/2015 Mitsubishi Heavy Industries 05200021 DC 12/31/07 US-APWR N/A N/A N/A 02/29/08 Suspended-03/03/2020 Korea Electric Power Company and Korea Hydro and Nuclear Power 05200046 DC 12/23/14 APR1400 N/A N/A N/A 03/04/15 Certified Issued 09/19/2019 Toshiba Corporation 05200044 DC 10/27/10 ABWR N/A N/A N/A 12/14/10 Withdrawn-12/30/2016 GE-Hitachi Nuclear Energy 05200045 DC 12/7/10 ABWR N/A N/A N/A 02/14/11 Certified Issued 09/29/2021 NuScale Power LLC 05200048 DC 01/6/17 NuScale N/A N/A N/A 03/23/17 Scheduled Early Site Permit PSEG Power, LLC, and PSEG Nuclear, LLC (PSEG) 05200043 ESP 05/25/10 Not yet announced PSEG Site NJ Yes 08/04/10 Issued 05/06/2016 Tennessee Valley Authority 05200047 ESP 05/12/16 Not yet announced Clinch River Site TN No 12/30/16 Issued 12/19/2019 Notes: Withdrawal was requested for Calvert Cliffs, Grand Gulf, Nine Mile Point, Victoria County, Bellefonte, and Callaway combined license and early site permit (ESP). In September 2017, Duke Energy announced cancellation of William States Lee III nuclear station Units 3 and 4.

Data are current as of September 30, 2022.. NRC-abbreviated reactor names listed.

APPENDIX B New Nuclear Power Plant Licensing Applications (continued)