ML22224A022
| ML22224A022 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 08/12/2022 |
| From: | Robert Kuntz Plant Licensing Branch III |
| To: | Steinman R Exelon Generation Co |
| References | |
| L-2022-LLR-0059 | |
| Download: ML22224A022 (2) | |
Text
From:
Kuntz, Robert Sent:
Friday, August 12, 2022 7:28 AM To:
rebecca.steinman@constellation.com
Subject:
Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Alternative I6R-09 related to Use of Certain 2013 Edition ASME Code Requirements (EPID: L-2022-LLR-0059)
Ms. Steinman, By letter dated July 25, 2022, Constellation Energy Generation, LLC, submitted a relief request I6R-09 for Quad Cities Nuclear Power Station, Units 1 and 2, for an alternative to the American Society of Mechanical Engineers Boiler and Pressure Vessel (ASME BPV) Code to apply certain 2013 non-destructive examination requirements. The purpose of this e-mail is to provide the results of the U.S. Nuclear Regulatory Commission (NRC) staffs acceptance review of this relief request. The acceptance review was performed to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review.
The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.
Pursuant to Sections 50.55a(z)(1) and 50.55a(z)(2) of Title 10 of the Code of Federal Regulations (10 CFR), the applicant shall demonstrate that the proposed alternatives would provide an acceptable level of quality and safety, or that compliance with the specified requirements of Section 50.55a would result in hardship or unusual difficulty without a compensating increase in the level of quality or safety.
Based on the information provided in your submittal the NRC staff has estimated that this licensing request will take approximately 80 hours9.259259e-4 days <br />0.0222 hours <br />1.322751e-4 weeks <br />3.044e-5 months <br /> to complete. The NRC staff expects to complete this review in approximately 7 months, which is March 31, 2023. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates, will be communicated during the routine interactions with the assigned project manager.
These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of scope to the review, and review by NRC advisory committees or hearing-related activities.
If you have any questions, please contact me.
Robert F. Kuntz, Senior Project Manager Plant Licensing Branch III Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation
Hearing Identifier:
NRR_DRMA Email Number:
1747 Mail Envelope Properties (SA9PR09MB464026F859DB9A81C88A7E0799679)
Subject:
Quad Cities Nuclear Power Station, Units 1 and 2 - Acceptance of Alternative I6R-09 related to Use of Certain 2013 Edition ASME Code Requirements (EPID: L-2022-LLR-0059)
Sent Date:
8/12/2022 7:28:25 AM Received Date:
8/12/2022 7:28:00 AM From:
Kuntz, Robert Created By:
Robert.Kuntz@nrc.gov Recipients:
"rebecca.steinman@constellation.com" <Rebecca.Steinman@constellation.com>
Tracking Status: None Post Office:
SA9PR09MB4640.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 2425 8/12/2022 7:28:00 AM Options Priority:
Normal Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date: