1 to Updated Final Safety Analysis Report, Chapter 3, Figures, Part 1
ML22131A097
Person / Time
Site: Seabrook NextEra Energy icon.png
Issue date: 05/05/2022
From:
NextEra Energy Seabrook
To:
Office of Nuclear Reactor Regulation
Shared Package
ML22131A110 List:
References
SBK-L-22042
Download: ML22131A097 (54)


Text

SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT CHAPTER 3 DESIGN OF STRUCTURES, COMPONENTS, EQUIPMENT AND SYSTEMS FIGURES 3.3-1 Pressure Coefficients Distribution for Cylinders and Spheres 3.3-2 Tornado Size Factor Cs Versus Building Length (L) 3.4-1 Waterproofing Concrete Typical Details 3.5-1 Possible Turbine Missile Trajectory 3.5-2 Coordinate Systems 3.5-3 Plot Plan and Elevation View Showing Effective Target Area 3.5-4 Relationship of Penetration to Scabbing Limit Thickness (Reference 12) 3.5-5 Xm/Xe Curves for Elasto-Plastic System Rectangular Impulse Load (Reference 15) 3.6(B)-1 Main Steam Piping Outside Containment 3.6(B)-2 Feedwater Piping Outside Containment 3.6(B)-3 Containment Penetration (Hot High Energy Lines) 3.6(B)-4 Containment Penetration (Cold High Energy Lines) 3.6(B)-5 RC Line 13 Pipe Whip Restraint Protecting CS, RC and RH Lines and Valves - Containment Zone 438 3.6(B)-6 Pressurizer Surge Line Pipe Whip Restraint Protecting Steam Generator Slowdown and Safety Injection Lines - Containment Zone 458 3.6(B)-7 Pressurizer Surge Line Pipe Whip Restraint Protecting Steam Generator Support, Reactor Coolant and Safety Injection Lines -Containment Zone 448 and 458 3.6(B)-8 RC-58 Pipe Whip Restraint Protecting RC. RH, and SI Lines and Valves Containment Zone 468 3.6(B)-9 Safety Injection Accumulator Line Pipe Whip Restraint Protecting CS, RH and RC Lines and Valves - Containment Zone 4

3.6(B)-10 SI Line Pipe Whip Restraints Protecting RC, RH, and SI Lines and Valves - Containment Zone 448 3.6(B)-11 SI Pipe Whip Restraint Protecting RC and SI Lines and Valves -

Containment Zone 458 3.6(B)-12 SI Pipe Whip Restraint Protecting CS, RC RH and SI Lines and Valves -

Containment Zone 468 3.6(B)-13 MS & FW Pipe Whip Restraints Protecting MS and RC Lines, Upper Level Taps and CRDM Assembly - Containment Zone 57E 3.6(B)-14 Main Steam Pipe Whip Restraints Protecting SB, CBS Lines, Valves and Containment Liner/Penetrations - Containment Zone 53C 3.6(B)-15 Main Steam Line Axial Pipe Whip Restraints Protecting Containment Penetrations - MS and FW Pipe Chase Zone 13B 3.6(B)-16 Main Steam Pipe Whip Restraints Protecting the Main Steam Isolation Valves and the Containment Penetrations - MS and FW Pipe Chase Zone 148 3.6(B)-17 Break and Thrust Locations Isometric for MS Pipes in West Pipe Chase 3.6(B)-18 Main Steam Pipe Whip Restraints Protecting West Pipe Chase North Wall - MS and FW Pipe Chase Zone 14C 3.6(B)-19 Main Steam Pipe Whip Restraint Protecting Containment Liner and Penetrations - Containment Zone SSD 3.6(B)-20 Main Steam Line Axial Pipe Whip Restraints Protecting Containment Penetrations - MS and FW Pipe Chase Zone 16B 3.6(B)-21 Main Steam Pipe Whip Restraints Protecting the Main Steam Isolation Valves and Containment Penetrations - MS and FW Pipe Chase Zone 17B 3.6(B)-22 Break and Thrust Locations Isometric forMS Pipes in East Pipe Chase 3.6(B)-23 Main Steam Pipe Whip Restraints Protecting West Pipe Chase North Wall-MS and FW. Pipe Chase Zone 17C 3.6(B)-24 Main Steam and Feedwater Pipe Whip Restraints Protecting East Wall of Control Building and Electrical Chase - MS and FW Pipe Chase Zone 15B 3.6(B)-25 Feedwater Pipe Whip Restraint Protecting the Containment Liner and Penetrations and CC & SB Lines and Valves - Containment Zone 53C 3.6(B)-26 Feedwater Pipe Whip Restraints Protecting Containment Liner and Penetrations - MS and FW Pipe Chase Zone 13A 3.6(B)-27 Break and Thrust Locations Isometric for FW Pipes in West Pipe Chase

3.6(B)-28 Feedwater Pipe Whip Restraints Protecting Containment Liner and Penetrations - MS and FW Pipe Chase Zone 14A 3.6(B)-29 Feedwater Pipe Whip Restraints Protecting Containment Liner and Penetrations - Containment Zone SSC 3.6(B)-30 Feedwater Pipe Whip Restraints Protecting Containment Liner and Penetrations - Containment Zone 16A 3.6(B)-31 Break and Thrust Locations Isometric for FW Pipes in East Chase 3.6(B)-32 Feedwater Pipe Whip Restraints Protecting Containment Liner and Penetrations -Containment Zone 17A 3.6(B)-33 Pipe Bridge West Main Steam and Feedwater Pipe Whip Restraints Protecting Turbine and Control Buildings 3.6(B)-34 Pipe Bridge East Main Steam and Feedwater Pipe Whip Restraints Protecting Turbine Building and Condensate Storage Tank 3.6(N)-1 Loss of Reactor Coolant Accident Boundary Limits 3.6(N)-2 Reactor Coolant System, Pipe Break and Whip Restraint Locations 3.7(B)-1 Time History Accelogram (0.25g), Horizontal Component 1 - SSE 3.7(B)-2 Time History Accelogram (0.25g), Horizontal Component 2 - SSE 3.7(B)-3 Time History Accelogram (0.25g), Vertical Component - SSE 3.7(B)-4 0.50% Critical Damping Ground Response Spectrum, Horizontal Component 1.,. SSE 3.7(B)-5 1% Critical Damping Ground Response Spectrum, Horizontal Component 1-SSE 3.7(B)-6 2% Critical Damping Ground Response Spectrum, Horizontal Component 1-SSE 3.7(B)-7 5% Critical Damping Ground Response Spectrum, Horizontal Component 1-SSE 3.7(B)-8 7% Critical Damping Ground Response Spectrum, Horizontal Component 1 - SSE 3.7(B)-9 10% Critical Damping Ground Response Spectrum, Horizontal Component 1 - SSE 3.7(B)-10 0.5% Critical Damping Ground Response Spectrum, Horizontal Component 2 - SSE 3.7(B)-11 1% Critical Damping Ground Response Spectrum, Horizontal Component 2 - SSE 3.7(B)-12 2% Critical Damping Ground Response Spectrum, Horizontal Component 2 - SSE

3.7(B)-13 5% Critical Damping Ground Response Spectrum, Horizontal Component 2 - SSE 3.7(B)-14 7% Critical Damping Ground Response Spectrum, Horizontal Component 2 - SSE 3.7(B)-15 10% Critical Damping Ground Response Spectrum, Horizontal Component 2 - SSE 3.7(B)-16 1% Critical Damping Ground Response Spectrum, Vertical Component -

SSE 3.7(B)-17 2% Critical Damping Ground Response Spectrum, Vertical Component -

SSE 3.7(B)-18 5% Critical Damping Ground Response Spectrum, Vertical Component -

SSE 3.7(B)-19 7% Critical Damping Ground Response Spectrum, Vertical Component -

SSE 3.7(B)-20 10% Critical Damping Ground Response Spectrum, Vertical Component

- SSE 3.7(B)-21 Containment Shell-Seismic Model 3.7(B)-22 Containment Internals-Mathematical Model 3.7(B)-23 Primary Auxiliary Building Seismic Analysis-Mathematical Model 3.7(B)-24 Control/Diesel Generator Building Seismic Analysis - Mathematical Model 3.7(B)-25 Fuel Storage Building Seismic Analysis - Mathematical Model 3.7(B)-26 Amplified Response Spectra-SSE-Containment Shell-7% Structural Damping; 2% Equipment Damping 3.7(B)-27 Amplified Response Spectra-SSE-Primary Auxiliary Building -7%

Structural Damping; 2% Equipment Damping 3.7(B)-28 Amplified Response Spectra - SSE - Control/Diesel Generator Building -

7% Structural Damping; 2% Equipment Damping 3.7(B)-29 Amplified Response Spectra-SSE-Fuel Storage Building - 7%

Structural Damping; 2% Equipment Damping 3.7(B)-30 Typical Ceiling to Floor Supported Cable Tray System 3.7(B)-31 Mathematical Model of Typical Ceiling to Floor Supported Cable Tray System 3.7(B)-32 Mounting Detail of Triaxial Time History Accelerograph, XT 6700, in East Air Intake Structure 3.7(B)-33 Mounting Detail of Triaxial Peak Accelerograph, XR-6703, on Safety Injection Piping (Line 203)

3.7(B)-34 Mounting Detail of Triaxial Peak Accelerograph, XR-6704, on PCCW Piping 3.7(B)-35 Primary Auxiliary Building Amplified Response Spectra (Vertical) OBE, 4% Damping 3.7(B)-36 Primary Auxiliary Building Amplified Response Spectra (Vertical) OBE, 1% Damping 3.7(B)-37 Typical Pipe Support Systems 3.7(B)-38 Alternative to Regulatory Guide 1.61 Damping Values 3.7(N)-1 Multi-Degree of Freedom System 3.8-1 Containment Structure Mat Reinforcing 3.8-2 Containment Structure Typical Reinforcing 3.8-3 Containment Structure Equipment Hatch Typical Reinforcing 3.8-4 Containment Structure Personnel Air Lock Typical Reinforcing 3.8-5 Containment Structure Liner Details 3.8-6 Containment Structure Reinforcing at Penetrations 3.8-7 Containment Structure Dome Reinforcing 3.8-8 Design Temperature Gradient through Containment Wall 3.8-9 Containment Pressure Transients Following a LOCA 3.8-10 Containment Cylinder Liner Temperature Transients Curve 3.8-11 Containment Dome Liner Temperature Transients Curve 3.8-12 Axisymetric Modeling Elements 3.8-13 Reinforced Concrete Idealization 3.8-14 Boundary Conditions for Equipment Hatch Analysis - Model Sketch 3.8-15 Shell Section Illustrating Computed Force and Moment Resultants 3.8-16 Containment Axisymetric Model 3.8-17 Three-Dimensional Finite Element Model for Equipment Hatch Analysis 3.8-18 Layered Cross Section Model for MARC-CDC Element 22 3.8-19 Finite Element Model of Containment Mat 3.8-20 Containment Structure Personnel Airlock 3.8-21 Containment Structure Equipment Hatch with Personnel Airlock 3.8-22 Typical High Energy Piping Penetration 3.8-23 Typical Moderate Energy Piping Penetration

3.8-24 Typical Electrical Penetration 3.8-25 Fuel Transfer Tube Arrangement 3.8-26 Typical Ventilation Penetration 3.8-27 Electrical Penetration Seal Temperature Response Following 0.84 ft2 Split Rupture at 75% Power 3.8-28 Reactor Vessel Lateral Support 3.8-29 Primary Shield Wall Main Reinforcement and Anchorage System 3.8-30 Design of Kick-Back Plate, Clamp Plate, Base Plate and Anchor Bolts for Polar Crane 3.8-31 Control Room Makeup Air Intake Structure East and West 3.8-32 Enclosure for Condensate Storage Tank 3.8-33 Pipe Tunnels (Typical) 3.8-34 Safety-Related Electrical Duct Banks-Typical Cross Section 3.8-35 Typical Safety-Related Electrical Manholes 3.8-36 Typical Reinforcing Detail at Base Slab and Wall 3.8-37 Service Water Pipe Access Vault Concrete Plan & Sections Precast Roof Option 3.9(N)-1 Reactor Coolant Loop Support System, Dynamic Structural Model 3.9(N)-2 Through-Wall Thermal Gradients 3.9(N)-3 Control Rod Drive Mechanism 3.9(N)-4 Control Rod Drive Mechanism Schematic 3.9(N)-5 Nominal Latch Clearance at Minimum and Maximum Temperature 3.9(N)-6 Control Rod Drive Mechanism Latch Clearance Thermal Effect 3.9(N)-7 Lower Core Support Assembly (Core Barrel Assembly) 3.9(N)-8 Upper Core Support Structure 3.9(N)-9 Plan View of Upper Core Support Structure 3.11-1 Service Environment Chart 3A-1 Composite Piping Zones (Nuclear) Key Plan 3A-2 Turbine Building Zone Key Plan Piping 3A-3 Auxiliary Building Zone Key Plan Piping

Pressure Coefficients Distribution for Cylinders and Spheres SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.3-1

1.0 0.9 0.8 0.7 0.6 0.5 0.4 0.3 0.2 0.1 Size Factor CS = Average Pressure/Max. Tornado Pressure Size Factor CS = Average Pressure/Max. Tornado Pressure 300 270 240 210 180 150 120 60 30 90 L (Feet)

G:\\Images_P\\UFSAR\\332.ds4 Tornado Size Factor Cs Versus Building Length (L)

SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.3-2

Composite Piping Zones (Nuclear) Key Plan SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3A-1 See 805067

Turbine Building Zone Key Plan Piping SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3A-2 See 202117

Auxiliary Building Zone Key Plan Piping SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3A-3 See 202118

Waterproofing Concrete Typical Details SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.4-1 See 101696

Possible Turbine Missile Trajectory SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.5-1

Y X

Y R

L U

Z G:\\Word\\Images_P\\UFSAR\\352.ds4 8

Coordinate Systems SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.5-2

Containment Containment Waste Proc Aux Fuel Pump House Turbine Turbine Admin Heater Bay Heater Bay D. G.

Control D. G.

Control Aux Fuel Elevation View From The NNW Plan View M. N.

N Scale in Feet 0

100 200 Dashed Envelope is Target Area For Large Aircraft.

Crossed Section of Envelope is FB-111A Target Area.

G;\\Word\\Images_P\\UFSAR\\353.ds4 Plot Plan and Elevation View Showing Effective Target Area SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.5-3

2 16 14 12 10 8

6 4

G:\\Images_P\\UFSAR\\354.ds4 D1 = Penetration d = Diameter of Missle DS = Thickness required to Prevent Spalling D1/d 2

4 6

8 10 12 Spalling Limit Limit Thickness DS d

Relationship of Penetration to Scabbing Limit Thickness (Reference 12)

SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.5-4

Xm/Xe Curves for Elasto-Plastic System Rectangular Impulse Load (Reference 15)

SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.5-5

Main Steam Piping Outside Containment SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-1

Feedwater Piping Outside Containment SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-2

Containment Penetration (Hot High Energy Lines)

SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-3

Containment Penetration (Cold High Energy Lines)

SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-4

RC Line 13 Pipe Whip Restraint Protecting CS, RC and RH Lines and Valves - Containment Zone 43B SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-5

Pressurizer Surge Line Pipe Whip Restraint Protecting Steam Generator Blowdown and Safety Injection Lines -

Containment Zone 45B SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-6

Pressurizer Surge Line Pipe Whip Restraint Protecting Steam Generator Support, Reactor Coolant and Safety Injection Lines -Containment Zone 44B and 45B SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-7

RC-58 Pipe Whip Restraint Protecting RC, RH, and SI Lines and Valves - Containment Zone 46B SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-8

Safety Injection Accumulator Line Pipe Whip Restraint Protecting CS, RH and RC Lines and Valves - Containment Zone 43B SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-9

SI Line Pipe Whip Restraints Protecting RC, RH, and SI Lines and Valves - Containment Zone 44B SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-10

SI Pipe Whip Restraint Protecting RC and SI Lines and Valves -Containment Zone 45B SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-11

SI Pipe Whip Restraint Protecting CS, RC, RH and SI Lines and Valves - Containment Zone 46B SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-12

MS & FW Pipe Whip Restraints Protecting MS and RC Lines, Upper Level Taps and CRDM Assembly -

Containment Zone 57E [2 Sheets]

SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-13 Sh. 1 of 2

MS & FW Pipe Whip Restraints Protecting MS and RC Lines, Upper Level Taps and CRDM Assembly -

Containment Zone 57E [2 Sheets]

SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-13 Sh. 2 of 2

Main Steam Pipe Whip Restraints Protecting SB, CBS Lines, Valves and Containment Liner/Penetrations - Containment Zone 53C SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-14

Main Steam Line Axial Pipe Whip Restraints Protecting Containment Penetrations - MS and FW Pipe Chase Zone 13B SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-15

Main Steam Pipe Whip Restraints Protecting the Main Steam Isolation Valves and the Containment Penetrations - MS and FW Pipe Chase Zone 14B SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-16

Break and Thrust Locations Isometric for MS Pipes in West Pipe Chase SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-17

Main Steam Line Axial Pipe Whip Restraints Protecting Containment Penetrations-MS and FW Pipe Chase Zone 16B SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-18

Main Steam Pipe Whip Restraint Protecting Containment Liner and Penetrations - Containment Zone 55D SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-19

Main Steam Line Axial Pipe Whip Restraints Protecting Containment Penetrations - MS and FW Pipe Chase Zone 16B SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-20

Main Steam Pipe Whip Restraints Protecting the Main Steam Isolation Valves and Containment Penetrations - MS and FW Pipe Chase Zone 17B SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-21

Break and Thrust Locations Isometric for MS Pipes in East Pipe Chase SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-22

Main Steam Pipe Whip Restraints Protecting West Pipe Chase North Wall - MS and FW Pipe Chase Zone 17C SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-23

Main Steam and Feedwater Pipe Whip Restraints Protecting East Wall of Control Building and Electrical Chase - MS and FW Pipe Chase Zone 15B SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-24

Feedwater Pipe Whip Restraint Protecting the Containment Liner and Penetrations and CC & SB Lines and Valves -

Containment Zone 53C SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-25

Feedwater Pipe Whip Restraints Protecting Containment Liner and Penetrations - MS and FW Pipe Chase Zone 13A SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-26

Break and Thrust Locations Isometric for FW Pipes in West Pipe Chase SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-27

Feedwater Pipe Whip Restraints Protecting Containment Liner and Penetrations - MS and FW Pipe Chase Zone 14A SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-28

Feedwater Pipe Whip Restraints Protecting Containment Liner and Penetrations - Containment Zone 55C SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-29

Feedwater Pipe Whip Restraints Protecting Containment Liner and Penetrations - Containment Zone 16A SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-30

Break and Thrust Locations Isometric for FW Pipes in East Chase SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-31

Feedwater Pipe Whip Restraints Protecting Containment Liner and Penetrations - Containment Zone 17A SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-32

Pipe Bridge West Main Steam and Feedwater Pipe Whip Restraints Protecting Turbine and Control Buildings SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-33

Pipe Bridge East Main Steam and Feedwater Pipe Whip Restraints Protecting Turbine Building and Condensate Storage Tank SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(B)-34

Boundary Boundary Boundary Boundary Test Connection (Means of Verifying That Check Valve Is Closed)

CASE I Outgoing Lines With Normally Closed Valve Reactor Coolant Piping Note: Pressurizer Safety Valves Are Included Under This Case.

CASE II Outgoing Lines With Normally Open Valve Note: The Reactor Coolant Pump No. 1 Seal Is Assumed To Be Equivalent To First Valve Restraint Fail Closed or Fail-As-Is Valves R

R CASE III Incoming Lines Normally With Flow No. 1 No. 2 Test Connection CASE IV Incoming Lines Normally Without Flow CASE V All Instrumentation Tubing and Instruments Connected Directly to the Reacotor Coolant System is Considered as a Boundary. However, a Break Within this Boundary Results in a Relatively Small Flow Which Can Normally be Made Up With the Charging System.

G:\\Word\\Images_P\\UFSAR\\36N1.ds4 Loss of Reactor Coolant Accident Boundary Limits SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(N)-1

Steam Generator 2

Steam Generator Upper Support Reactor Coolant Pump Reactor Coolant Pump Support Steam Generator Lower Support Reactor Pressure Vessel 1

3 G:\\Word\\Images_P\\UFSAR\\36N2.ds4 Reactor Coolant System, Pipe Break and Whip Restraint Locations SEABROOK STATION UPDATED FINAL SAFETY ANALYSIS REPORT Figure 3.6(N)-2