MONTHYEARML17068A1632017-03-0202 March 2017 NIST Center for Neutron Research Test Reactor - Request for Changes to Technical Specifications to Allow Low Power Testing Project stage: Request ML17068A1642017-03-0202 March 2017 NIST Center for Neutron Research - Statement of No Significant Hazard Resulting from License Amendment Request Dated 03/02/2017 Project stage: Request ML17097A2432017-03-29029 March 2017 Marked-up Version of the License Amendment Request of the Nbsr Technical Specifications Project stage: Request ML17153A1722017-05-25025 May 2017 NIST - Supplement for Request for Changes to Nbsr Technical Specifications to Allow Low Power Testing Project stage: Request ML17318A6952017-11-16016 November 2017 National Institute of Standards and Technology, Request for Additional Information of License Amendment Request for the Renewed Facility License No. TR-5 for the National Bureau of Standards Test Reactor (CAC No. 000955) Project stage: RAI ML17324A4412017-11-17017 November 2017 Supplement for Request for Changes to Nbsr Technical Specifications to Allow Low Power Testing Project stage: Request ML17328A5042017-11-20020 November 2017 Supplement for Request for Changes to Nbsr Technical Specifications to Allow Low Power Testing Project stage: Request ML17335A3692017-12-0101 December 2017 Supplemental Information National Institute of Standards and Technology Request for Additional Information of License Amendment Request for the Renewed Facility License No. R-5 for the National Bureau of Standards Test Reactor Project stage: Supplement ML17292A0622017-12-15015 December 2017 National Institute of Standards and Technology, Amendment No. 11 to the Renewed Facility License No. TR-5 for the National Bureau of Standards Reactor (CAC No. 000955) Project stage: Other ML18010A5622018-02-0202 February 2018 Aerotest Radiography and Research Reactor - Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML18054A2022018-02-21021 February 2018 Response to Request for Holding Information from Public Disclosure Project stage: Request ML18066A0802018-02-28028 February 2018 Submittal of Response to Request for Holding Information from Public Disclosure Project stage: Request ML18074A1112018-04-0202 April 2018 Request for Withholding Information from Public Disclosure Response to Request to Aerotest Operations, Inc. to Supplement the License Renewal Application Project stage: Withholding Request Acceptance ML21272A3762021-09-29029 September 2021 Kairos Power, LLC - Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes) Project stage: Request ML21306A1322021-10-31031 October 2021 Kairos Power LLC Submittal of the Environmental Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes) Project stage: Request ML21319A3542021-11-29029 November 2021 Acceptance of the Hermes Non-Power Test Reactor Construction Permit Application for Kairos Power LLC Project stage: Acceptance Review ML22024A4922022-01-10010 January 2022 Hermes CP RAI - Preliminary Questions on the Hermes PSAR, Email 1 Project stage: Request ML22028A0022022-02-0202 February 2022 Kairos Hermes Environmental Audit Plan Project stage: Other ML22041A3372022-02-0303 February 2022 Kairos Power LLC, Transmittal of Responses-to NRC Questions 2.3-1 and 2.3-2 on the Hermes Preliminary Safety Analysis Report Project stage: Request ML21364A0132022-02-0808 February 2022 Kairos Power LLC - Application for Construction Permit for Hermes Test Reactor Project stage: Other ML22040A3362022-02-0909 February 2022 Kairos Power LLC, Submittal of Response to NRC Questions 2.5-1, 2.5-2, 2.5-3, and 2.5-4 for PSAR Section 2.5 on Hermes Construction Permit Application Project stage: Request ML22040A3382022-02-0909 February 2022 Kairos Power LLC, Response to NRC Questions 2.5-1, 2.5-2, 2.5-3, and 2.5-4 for PSAR Section 2.5 on Hermes Construction Permit Application Project stage: Other ML22039A2262022-02-17017 February 2022 Audit Plan for the Kairos Hermes Preliminary Safety Analysis Report (PSAR) Section 6.3 Decay Heat Removal System - February 2022 Project stage: Other ML22089A1662022-04-0808 April 2022 Kairos Power LLC - Hermes Construction Permit Preliminary Safety Analysis Report I&C Repor (Chapter 7) Audit Plan (Cac/Epid No. 000955/05007513/L-2021-NEW-0011) Project stage: Other ML22143B0162022-05-27027 May 2022 Audit Plan for Hermes Site Characteristics PSAR Chapter 2 Project stage: Other ML22230D0762022-08-0505 August 2022 Final RCI 349 on Salt Purity in the Chemistry Control System and the Inert Gas System Project stage: Other ML22227A1802022-08-0808 August 2022 Final RAI 348 on Shutdown Rod Reliability Project stage: RAI ML22286A1672022-10-17017 October 2022 Atomic Alchemy Inc Preliminary Safety Analysis Report Pre-Submittal Audit Plan Project stage: Other ML23093A0272023-04-0404 April 2023 Atomic Alchemy, Inc., PSAR Secondary Pre-Submittal Audit Plan Project stage: Other ML23158A2682023-06-13013 June 2023 Safety Evaluation for Hermes Construction Permit Application Project stage: Approval ML23158A2662023-06-13013 June 2023 Transmittal of Safety Evaluation for Hermes Construction Permit Application Project stage: Approval ML24284A1712023-07-14014 July 2023 NRC-002B - Kairos Power LLC, Construction Permit Application - General Information (July 14, 2023) Project stage: Other ML23195A1252023-07-14014 July 2023 Enclosure 3: Environmental Report H2-ER-0000001, Rev. 0 Project stage: Request ML23181A1072023-07-18018 July 2023 Summary of August 25 and 30 2022 Public Meetings on the Kairos Hermes Preliminary Safety Analysis Report Project stage: Meeting ML23237B4652023-09-11011 September 2023 FRN: General Notice. Acceptance for Docketing of the Kairos Power LLC Hermes 2 Test Reactor Construction Permit Project stage: Request ML23290A0302023-10-17017 October 2023 Atomic Alchemy Inc PSAR Tertiary Pre-Submittal Audit Plan Project stage: Other ML23353A0692024-01-0505 January 2024 Kairos Power, LLC-Hermes 2-Environmental Report Audit Plan Project stage: Other 2022-10-17
[Table View] |
Text
Enclosure 1 Kairos Power Response to NRC Questions 2.5-1, 2.5-2, 2.5-3, and 2.5-4 (Non-Proprietary)
Page1of1
QuestionNumber:2.51
Section2.5.3oftheapplicationreliesontheinformationofClinchRiverEarlySitePermit applicationsearthquakecatalog,whichendsin2013.Anupdated(20132021)earthquake catalogshouldbeprovidedtodemonstratethattheassumptionsandconclusionsinthe CRNPSHAremainvalid.
KairosPowerResponse:
ThepossiblechangesinearthquakeactivityintheHermes,andClinchRiverNuclear(CRN),
siteregionduringthe20132021periodrelativetotheCRNrateshavenotyetbeen finalized.ThePSARreflectsanassumptionthattheClinchRiverEarlySitePermitapplication earthquakecatalogisrepresentativeoftheseismicactivitytobeexpectedattheHermes site,basedonproximitytoCRNandthefactthatrecentseismicactivityintheCentraland EasternUnitedStates(CEUS)sincethe2012MineralVirginiaearthquakeeventhasnotbeen significant.
KairosPowerisnotrequestingfinalapprovalofaseismichazarddesignprofileforHermes aspartofthePSAR.Theinformationprovidedissufficienttodeterminesuitablyofthesite fortheproposeduseofatestreactor.TheHermesOperatingLicenseApplicationwill reporttheseismichazardwithupdatedearthquakecatalogrecurrencerates.
ImpactonLicensingDocument:
ThisresponsehasnoimpactonthecontentofPSARSection2.5.
References:
None
({J Kairos Power
Page1of1
QuestionNumber:2.52
ForSection2.5.4.3,howdoesKairosintendtodeterminethatthefoundationrockshowsno evidenceofkarsticdissolution?
KairosPowerResponse:
BoringdataclosesttotheproposedHermesreactorlocationindicatesthetopofthe weatheredrockisencounteredatadepthofapproximately13.5ft.,andthetopofsound rockatadepthofapproximately30ft.Theoverburdensoilsandtheweatheredrockwillbe excavated.Belowtheweatheredrock,soundbedrockrecoveredfromtheboringsdrilled showsnoevidenceoftheweakeningorweatheringthatisobservedintheinterfacecloser tothesurface.TheHermesfoundationwillbedeployedoveranengineeredcrushedstone orleanconcretefillplaceddirectlyoversoundrock.Theexcavationisplannedtoreachthe approximately30ftdepth,exposingthesurfaceofthefoundationrocktoallowfor inspectionandsurfacepreparation.Theseactivities,boringdataandfoundationrock inspectionfollowingexcavation,willallowthedeterminationtobemadethatthe foundationrockshowsnoevidenceofkarsticdissolution.
ImpactonLicensingDocument:
ThisresponsehasnoimpactonthecontentofPSARSection2.5.
References:
None
({J Kairos Power
Page1of2
QuestionNumber:2.53
GeologiccrosssectionAA(Figure2.52)appearstobemissingtheMascotDolomite,which isshownonthemap(Figure2.51)butnotinthecrosssection.Provideanewcrosssection thatincludesallgeologicunitsshownonthesurfaceandencounteredinthesubsurface.
KairosPowerResponse:
Figure2.52hasbeenupdatedtoaddtheMascotDolomite,consistentwithFigure2.51.
Locationofinterfacesanddipsareindicatedasapproximate.
ImpactonLicensingDocument:
ThePSARSection2.5Figure2.52,SubsurfaceProfileAAhasbeendeletedandreplacedby theupdatedFigure2.52(attached).Thischangewillbeincludedinafuturerevisiontothe PSAR.
References:
None
({J Kairos Power
Page2of2
UPDATEDFIGURE2.52SubsurfaceProfileAA
ELEV [ft]
780 770 760 750 740 730 720 710 FILL Fat clay w/rock fragments Stiff to very Stiff N=10 to 20 RESIDIUUM CLAY Fat Clay Very Soft N = 2 to 5 CLAY FILL
~
CLAY FILL & GRAVEL LIMESTONE
~
DOLOMITIC LIMESTONE
~
RESIDIUM CLAY ALLUVIAL CLAY RESIDIUM ROCK lfil WEATHERED LIMESTONE PROFILE A-A' RESIDIUUM ROCK Weathered Limestone Fragments LIMESTONE Light Olive Gray
=
CT WEATHERED LIMESTONE o'<"'
GEOLOGIC BOUNDARY
\\
- Ops: Pond Springs Formation
- Om: Murfreesboro Limestone
- Oma: Mascot Dolomite o"'
go
- Unit interfaces and dips shown are approximate (Tennessee Geological Survey, 2015)
-~- GROUNDWATER TABLE (Approximate)
SURFACE SOILS Om p-,
B-5 Limestone Light Gray I
0 50' 200'
[HORIZONTAL ]
p-,
I 0
20' 50'
[VERTICAL]
Information between borings is assumed and actual conditions may vary
Page1of2
QuestionNumber2.54
GeologiccrosssectionBB(Figure2.53)showstheMascotDolomiteappearingtodipto thenorthwest.However,geologicmapsofthesiteshowallunitsatthesitelocationdipping tothesoutheast(seeGeologicMapoftheElvertonQuadrangle,TennesseeGeological Survey,2015).PleaseconfirmthecorrectdipdirectionoftheMascotDolomiteandprovide anewcrosssectionthatshowsthecorrectdipifneeded.
KairosPowerResponse:
AnupdatetoFigure2.53isprovidedshowingthedipoftheinterfaceconsistentwiththe ElvertonQuadrangle(Reference1).Figure2.53hasbeenupdatedtobeconsistentwith Figure2.51andtheReference1geologicmap.Thelocationofinterfacesanddipsare indicatedasapproximateandconsistentwithReference1.
ImpactonLicensingDocument:
ThePSARSection2.5Figure2.53,SubsurfaceProfileBBhasbeendeletedandreplacedby theupdatedFigure2.53(attached).Thischangewillbeincludedinafuturerevisiontothe PSAR.
References:
1.
PSARSection2.5.6Reference4,Limiszki,P.,"GeologicMapoftheElvertonQuadrangle, Tennessee,"TennesseeGeologicSurvey.2015.
({J Kairos Power
Page2of2
UPDATEDFIGURE2.53SubsurfaceProfileBB
ELEV [ ft]
780 770 760 750 740 730 720 710 700 690 RESIOIUU M CLAY Fat Clay Very Soft N=2to5 Ill CLAY FILL
~
CLAY FILL & GRAVEL Ill LIMESTONE
~
DOLOMITIC LIMESTONE
~
RESIDIUM CLAY Ill ALLUVIAL CLAY RESIDIUM ROCK LJ WEATHERED LIMESTONE PROFILE B-B' Oma DOLOMITE light Olive Gray R"'
GEOLOGIC BOUNDARY o \\
- Ops: Pond Springs Formation o"'
- Om: Murfreesboro Limestone
- Oma: Mascot Dolomite
- Unit interfaces and dips shown are approximate (Tennessee Geological Survey, 2015)
-*- GROUNDWATER TABLE (Approximate)
Ops LIMESTONE Light Olive Gray
{assumed) 0 50' 200'
[ HORIZONTAL]
0 20' 50'
[VERTICAL ]
Information between borings is assumed and actual conditions may vary