January 10, 2022 LICENSEE:
Entergy Operations, Inc.
FACILITY:
Arkansas Nuclear One, Unit 1
SUBJECT:
SUMMARY
OF DECEMBER 16, 2021, PRESUBMITTAL TELECONFERENCE WITH ENTERGY OPERATIONS, INC. TO DISCUSS PROPOSED AMENDMENT REQUEST CONCERNING TECHNICAL SPECIFICATION 3.4.4, RCS [REACTOR COOLANT SYSTEM] LOOPS, MODES 1 AND 2, FOR ARKANSAS NUCLEAR ONE, UNIT 1 (EPID L-2021-LRM-0120)
On December 16, 2021, an Observation presubmittal meeting was held between the U.S. Nuclear Regulatory Commission (NRC) and Entergy Operations, Inc. (the licensee) via teleconference. The purpose of the meeting was to discuss the licensees forthcoming license amendment request (LAR) regarding proposed technical specification (TS) changes for TS 3.4.4, RCS [Reactor Coolant System] Loops, Modes 1 and 2, for Arkansas Nuclear One, Unit 1 (ANO-1). The meeting notice and agenda dated December 3, 2021, are available in the NRCs Agencywide Documents Access and Management System (ADAMS) under Accession No. ML21337A087. A list of meeting participants is provided in the enclosure.
During the meeting, the licensee presented information (ADAMS Accession No. ML21348A126) regarding its forthcoming LAR. The licensee provided background information concerning the reason for the planned LAR and a detailed description of the proposed changes to the ANO-1 TSs, and identified some precedent LARs. The licensee informed the NRC staff that it expected to submit the LAR in January 2022.
The NRC staff queried the licensee throughout the presentation. The NRC staff did not make any regulatory decisions or commitments at the meeting. Members of the public participated in the teleconference. Public Meeting Feedback forms were not received.
Please direct any inquiries to me at 301-415-4037, or via e-mail to Thomas.Wengert@nrc.gov.
/RA/
Thomas J. Wengert, Senior Project Manager Plant Licensing Branch IV Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket No. 50-313
Enclosure:
List of Attendees cc: Listserv
Enclosure LIST OF ATTENDEES DECEMBER 16, 2021, TELECONFERENCE MEETING WITH ENTERGY OPERATIONS, INC.
ARKANSAS NUCLEAR ONE, UNIT 1 FORTHCOMING LICENSE AMENDMENT REQUEST REGARDING TECHNICAL SPECIFICATION 3.4.4, RCS [REACTOR COOLANT SYSTEM]
LOOPS, MODES 1 AND 2 U.S. Nuclear Regulatory Commission Fred Forsaty, NRR1/DSS2 Santosh Bhatt, NRR/DSS Vic Cusumano, NRR/DSS Calvin Cheung, NRR/DEX3 Jennifer Dixon-Herrity, NRR/DORL4 Tom Wengert, NRR/DORL Entergy Operations, Inc.
Clint Alday Corporate Manager, Nuclear Fuels Analysis Matt Bindeman Arkansas Nuclear One (ANO) Safety Analysis Terrence Brimfield Corporate Supervisor, Safety Analysis Bob Clark ANO Regulatory Assurance Phil Couture Corporate Senior Manager, Regulatory Assurance Ron Gaston Corporate Director, Regulatory Compliance Michael Hall ANO Regulatory Assurance Riley Keele Manager, ANO Regulatory Assurance Kenyon McNeaill ANO Manager, Assistant Operations Mark Reid ANO Regulatory Assurance Chris Walker ANO Safety Analysis State of Arkansas Bernie Bevill Section Chief, Arkansas Department of Health, Radiation Control Section 1 Office of Nuclear Reactor Regulation 2 Division of Safety Systems 3 Division of Engineering and External Hazards 4 Division of Operating Reactor Licensing
- by e-mail OFFICE NRR/DORL/LPL4/PM* NRR/DORL/LPL4/LA* NRR/DORL/LPL4/BC*
NRR/DORL/LPL4/PM*
NAME TWengert PBlechman JDixon-Herrity (WOrders for)
TWengert DATE 1/10/2022 1/3/2022 1/10/2022 1/10/2022