IR 05000254/2021401

From kanterella
(Redirected from ML21251A506)
Jump to navigation Jump to search
Security Baseline Inspection Report 05000254/2021401 and 05000265/2021401
ML21251A506
Person / Time
Site: Quad Cities  Constellation icon.png
Issue date: 09/09/2021
From: Steven Orth
Plant Support Branch II
To: Rhoades D
Exelon Generation Co, Exelon Nuclear
References
IR 2021401
Download: ML21251A506 (4)


Text

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION - SECURITY BASELINE INSPECTION REPORT 05000254/2021401 AND 05000265/2021401; INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION REPORT 07200053/2021401

Dear Mr. Rhoades:

On July 29, 2021, the U.S. Nuclear Regulatory Commission (NRC) completed an inspection at Quad Cities Nuclear Power Station and discussed the results of this inspection with Mr. K. Ohr, Site Vice President, and other members of your staff. The results of this inspection are documented in the enclosed report.

One finding of very low security significance (Green) is documented in this report.

This finding involved a violation of NRC requirements. We are treating this violation as a non-cited violation (NCV) consistent with Section 2.3.2 of the Enforcement Policy.

If you contest the violation or the significance or severity of the violation documented in this inspection report, you should provide a response within 30 days of the date of this inspection report, with the basis for your denial, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Enforcement; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Quad Cities Nuclear Power Station.

The following cross cutting aspect was assigned to a finding using Inspection Manual Chapter 0310 Aspects Within Cross Cutting Areas: [H.12] - Avoid Complacency.

If you disagree with a cross-cutting aspect assignment in this report, you should provide a response within 30 days of the date of this inspection report, with the basis for your disagreement, to the U.S. Nuclear Regulatory Commission, ATTN: Document Control Desk, Washington, DC 20555-0001; with copies to the Regional Administrator, Region III; the Director, Office of Nuclear Security and Incident Response; and the NRC Resident Inspector at Quad Cities Nuclear Power Station.

September 9, 2021 This letter will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public Inspections, Exemptions, Requests for Withholding.

The enclosed report contains Security-Related Information, so the enclosed report will not be made publicly available in accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390(d)(1). If you choose to provide a response that contains Security-Related Information, please mark your entire response Security-Related Information-Withhold from public disclosure under 10 CFR 2.390 in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). The NRC is waiving the affidavit requirements for your response in accordance with 10 CFR 2.390(b)(1)(ii).

Sincerely, Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket Nos. 05000254; 05000265; 07200053 License Nos. DPR-29; DPR-30; General License ISFSI Enclosure:

As stated cc: D. Bush, Quad Cities Station Security Manager A. Khayyat, State Liaison Officer, Illinois Emergency Management Agency A. Leek, State Liaison Officer, State of Iowa cc w/o encl: Distribution via LISTSERV Signed by Orth, Steven on 09/09/21 Letter to David Rhoades from Steven K. Orth dated September 9, 2021.

SUBJECT:

QUAD CITIES NUCLEAR POWER STATION - SECURITY BASELINE INSPECTION REPORT 05000254/2021401 AND 05000265/2021401; INDEPENDENT SPENT FUEL STORAGE INSTALLATION SECURITY INSPECTION REPORT 07200053/2021401 DISTRIBUTION w/encl:

Daryl Johnson Niry Simonian Eric Wharton Stacy Prasad Fred Bower Binoy Desai Douglas Garner John Giessner Mohammed Shuaibi Ray Kellar DISTRIBUTION w/o encl:

Jessie Quichocho Aaron McCraw RidsNrrDorlLpl3 RidsNrrPMQuadCities Resource RidsNrrDroIrib Resource John Giessner Mohammed Shuaibi Jamnes Cameron Allan Barker DRPIII DRSIII

ML21251A506 Entire Report:

SUNSI Review Non-Sensitive Sensitive Publicly Available Non-Publicly Available Cover Letter Only:

x SUNSI Review x Non-Sensitive Sensitive x Publicly Available Non-Publicly Available OFFICE RIII RIII RIII NAME GBonano:jw MZiolkowski SOrth DATE 09/09/21 09/09/21 09/09/21