MONTHYEARML21263A2362020-08-0505 August 2020 Safety Evaluation by the Office of Nuclear Reactor Regulation Regarding the Terrapower, LLC Quality Assurance Topical Report Project stage: Approval ML20280A9702020-10-21021 October 2020 Terrapower - Acceptance Topical Report Quality Assurance Program Description Project stage: Other ML20294A3372020-11-10010 November 2020 Letter and Final Safety Evaluation for Kairos Power, LLC Topical Report-KP Fhr Risk-Informed Performance-Based Licensing Basis Development Methodology (Revision 1) (EPID No. L-2019-TOP-0009/CAC No. 000431) Project stage: Approval ML20343A2242020-12-0808 December 2020 Verification Letter of the Approval Version of Kairos Power LLC Topical Report KP-TR-O09-NP, - KP-FHR Risk-Informed Performance-Based Licensing Basis Development Methodology - (Revision 1) (CAC No. 000431) Project stage: Other ML21005A0152020-12-23023 December 2020 Revision to Terrapower, LLC - Quality Assurance Topical Report Project stage: Request ML21021A3642021-01-21021 January 2021 Enclosure 2: Presentation Materials About Construction Permit Application for the KP-FHR (Non-Proprietary) Project stage: Request ML21071A0822021-03-0808 March 2021 Kairos Power, LLC - Quality Assurance Program for the Kairos Power Flouride Salt-Cooled High Temperature Reactor Topical Report (Revision 1) Project stage: Request ML21071A0832021-03-31031 March 2021 Kairos Power, LLC - KP-TR-007-NP, Quality Assurance Program for the Kairos Power Flouride Salt-Cooled High Temperature Reactor Topical Report, Revision 1 (Non-Proprietary) Project stage: Request ML21105A5182021-04-15015 April 2021 Kairos Power LLC, Quality Assurance Program for the Flouride Salt-Cooled High Temperature Reactor Topical Report (Revision 2) Project stage: Request ML21117A0472021-04-26026 April 2021 Kairos Power LLC, Quality Assurance Program for the Flouride Salt-Cooled High Temperature Reactor Topical Report(Revision 3) Project stage: Request ML21117A0482021-04-26026 April 2021 Quality Assurance Program for the Kairos Power Flouride Salt Cooled High Temperature Reactor Topical Report, Revision 3 Project stage: Request ML21105A5192021-04-30030 April 2021 Kairos Power LLC, Quality Assurance Program for the Flouride Salt-Cooled High Temperature Reactor Topical Report Revision 2 Project stage: Request ML21148A2362021-05-28028 May 2021 Response to Request for Additional Information on NRCs Assessment of the Quality Assurance Program Description for Terrapower, LLCs Quality Assurance Topical Report Project stage: Response to RAI ML21147A5472021-06-0909 June 2021 Kairos Power Hermes Test Reactor Psotulated Events Audit Plan Project stage: Other ML21160A2212021-06-22022 June 2021 Letter SE Kairos Fuel Performance Methodology Topical Project stage: Other ML21183A2002021-07-0202 July 2021 Revised Response to Request for Additional Information on NRCs Assessment of the Quality Assurance Program Description for Terrapower, LLCs Quality Assurance Topical Report Project stage: Response to RAI ML21218A0452021-08-17017 August 2021 Kairos Hermes PSAR Pre-Submittal Audit Plan - Rev. 3 Project stage: Other ML21194A4392021-08-20020 August 2021 Draft Kairos Flibe Thermophisical Properties Audit Plan 6 30 21 Project stage: Draft Other ML21281A0922021-10-22022 October 2021 NRC 897 Withholding Determination for KP-FHR Mechanistic Source Term Methodology Topical Report Rev 1 Project stage: Other ML21281A0792021-10-22022 October 2021 Email to Kairos Regarding Mechanistic Source Term Topical Report Withholding Determination.Docx Project stage: Other ML21308A5982021-11-16016 November 2021 Letter - Kairos Power, LLC - Safety Evaluation for Kairos Power, LLC Topical Report KP-TR-007-NP, Quality Assurance Program Project stage: Approval ML21308A5972021-11-16016 November 2021 Enclosure - Safety Evaluation for Kairos Power LLC Topical Report KP-TR-007-NP, Quality Assurance Program for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor, Revision 3 Project stage: Approval ML21363A1802021-12-30030 December 2021 NRC Staff Withholding Determination - Kairos Power Topical Report: KP-TR-012-P, Revision 0, KP-FHR Mechanistic Source Term Methodology Project stage: Other ML22018A3002022-01-21021 January 2022 Letter - NRC Feedback on Terrapower Advanced SER QAPD Project stage: Other ML22018A1612022-01-31031 January 2022 Kairos Power LLC, Kp& 8208;TR& 8208;004& 8208;NP, Regulatory Analysis for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor, Rev. 4 Project stage: Request ML22024A4852022-02-0808 February 2022 OEDO-21-00545 -Safety Evaluation of the Kairos Power LLC Topical Report KP-TR-012-P, Revision 1, KP-FHR Mechanistic Source Term Methodology Project stage: Request ML22088A2312022-03-28028 March 2022 KP-TR-012-NP, Revision 3, KP-FHR Mechanistic Source Term Methodology Topical Report Project stage: Request ML22112A1332022-04-22022 April 2022 Kairos Power, LLC, Safety Evaluation for KP-TR-012 KP-FHR Mechanistic Source Term Methodology Topical Report, Revision 3 (EPID L-2020-TOP-0051/CAC 000431) Project stage: Approval ML22138A1642022-05-19019 May 2022 Email with Withholding Determination for Kairos Power Mechanistic Source Term Methodology Topical Report Revision 3 Project stage: Other ML22138A1632022-05-19019 May 2022 Withholding Determination for Kairos Power Mechanistic Source Term Methodology Topical Report Revision 3 Project stage: Other ML22138A1402022-05-19019 May 2022 Withholding Determination for Kairos Power Mechanistic Source Term Methodology Topical Report Revision 2 Project stage: Other ML22138A1392022-05-19019 May 2022 Email with Withholding Determination for Kairos Power Mechanistic Source Term Methodology Topical Report Revision 2 Project stage: Other ML22136A0892022-05-26026 May 2022 Safety Evaluation for Kairos Regulatory Analysis Topical Report Kp TR-004, Revision 4 Project stage: Approval ML22164A0602022-06-15015 June 2022 NRC 896 -A Topical Report Verification Review Determination for Kairos Mechanistic Source Term Topical Report Project stage: Other ML22164A0592022-06-15015 June 2022 Email Transmitting NRC Form 896 for Kairos Mechanistic Source Term -A Topical Report Project stage: Other ML22166A3262022-07-0505 July 2022 Email with Withholding Determination for Kairos Power Mechanistic Source Term Methodology Topical Report - a Project stage: Other ML22166A3252022-07-0505 July 2022 Withholding Determination for Kairos Power Mechanistic Source Term Methodology Topical Report -A Project stage: Other ML22186A2132022-07-0505 July 2022 Kairos Power LLC, Fuel Qualification Methodology for Fluoride Salt-Cooled High Temperature Reactor (KP-FHR), Revision 2 Project stage: Request ML22216A1792022-07-29029 July 2022 Submission of X Energy, LLC (X-energy) TRISO-X Pebble Fuel Qualification Methodology Project stage: Request ML22265A2182022-09-21021 September 2022 Withdrawal of X Energy, LLC (X-energy) Xe-100 Topical Report: TRISO-X Pebble Fuel Qualification Methodology, Revisions 1 and 2 Project stage: Request ML22266A2862022-09-23023 September 2022 Submittal of Revised Terrapower, LLC Quality Assurance Topical Report, Revision 14 Project stage: Request ML22318A2362022-11-10010 November 2022 Submission of X Energy, LLC (X-energy) Xe-100 Licensing White Paper Probabilistic Risk Assessment Technical Adequacy Approach Project stage: Request ML23024A2632023-02-0808 February 2023 Staff Response to Advisory Committee on Reactor Safeguards Letter on Safety Evaluation of the Kairos TR Project stage: Request ML23048A3262023-03-0202 March 2023 Final Safety Evaluation for Kairos Fuel Qualification TR Project stage: Approval 2021-07-02
[Table View] |
Text
Fuel Cycle and Transportation of Fuel and Waste Evaluation -
Acceptance Criteria for the Kairos Review Donald Palmrose, PhD Senior Reactor Engineer Environmental Center of Expertise Division of Rulemaking, Environmental, and Financial Services Office of Nuclear Material Safety and Safeguards
2 August 19, 2021 Acceptance/Review Criteria Considerations for the Kairos Hermes Review
- Portions of prior NEPA assessments should apply
- Additional assumptions considered in development of the draft ANR GEIS (est. publishing date in May 2022)
- Should help inform the Kairos Hermes environmental review
3 August 19, 2021 Fuel Cycle Assumptions
- Table S-3 is expected to bound front-end impacts for ANR fuels:
Increasing use of in situ leach uranium mining Current light-water reactors are using nuclear fuel more efficiently Less reliance on coal-fired electrical generation plants Transitioning of U.S. uranium enrichment technology from gaseous diffusion to gas centrifugation
- Waste and spent fuel conditions should not be significantly different from NUREG-2157 For example, assuming once-through fuel cycle for TRISO
4 August 19, 2021 Fuel Cycle Verification
Fuel fabrication source Anticipated levels of fuel burnup Waste and spent fuel conditions bounded by NUREG-2157 Meet 10 CFR Parts 40, 50, 70, 71, 72, and 73
- Confirm if TRISO fuel fabrication has similar impacts as existing fuel fabrication (e.g., performed under existing license)
- Check for missing information using PNNL-29367 Rev. 2, Non-LWR Fuel Cycle Environmental Data (ML20267A217)
5 August 19, 2021 Transportation of Fuel and Waste Assumptions
- Consideration of prior staff assessments such as the Clinch River ESP FEIS analysis Could bound ANRs if similar to conditions in past new reactor EISs
- For the draft ANR GEIS, the staff compiled information from the prior new reactor transportation of fuel and waste impacts
- Believe total annual shipment distances are a good indicator of impacts based on:
Review of 15 new reactor ESP and COL EISs Number of shipments normalized to net electrical output of 880 MW(e) from WASH-1238 (see RG 4.2 Rev 3 Section 6.2.2 for details)
One-way and two-way distances where appropriate
6 August 19, 2021 Transportation of Fuel and Waste Verification
Were prior new reactor analyses relied upon Were certified transportation packages cited Is the Fuel fabrication source and are potential LLRW and spent ANR disposal or away-from-reactor sites provided in the ER Are TRISO release fractions available or can assumptions be applied Can maximum annual one-way and two-way shipment distances can be determined from information in ER
- Based on the outcomes above, may have to consider a full description and detailed analysis See RG 4.2 Rev 3 Section 6.2 and PNNL-29365, Transportation of Fuel and Wastes to and from Non-LWRs (ML20267A157)
7 August 19, 2021 Questions?