ML21119A340

From kanterella
Jump to navigation Jump to search
Preparation and Scheduling of Operator Licensing Examinations
ML21119A340
Person / Time
Site: Millstone, Summer, Surry, North Anna  Dominion icon.png
Issue date: 04/29/2021
From: Mark D. Sartain
Dominion Energy Nuclear Connecticut, Dominion Energy South Carolina, Virginia Electric & Power Co (VEPCO)
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
21-136, RIS-2021-01
Download: ML21119A340 (12)


Text

Dominion Energy

Services, Inc.

g 5000 Dominion Boulevard, GlenAllen, VA23060 DominionEnergy.com bQ@f April 29,2021 r

United States Nuclear Regulatory Commission Serial No.: 21-136 Attn:

Document Control Desk NRA/KHB Washington, DC20555-0001 Docket Nos.:50-336/423 50-338/339 i

50-280/281 50-395 License Nos.:

DPR-65 I

NPF-49 NPF-4/7 DPR-32/37 NPF-12 I

VIRGINIA ELECTRIC ANDPOWER COMPANY MILLSTONE POWERSTATIONUNITS2AND3 NORTHANNAPOWERSTATIONUNITS1AND2 f

SURRYPOWERSTATIONUNITS1AND2 VIRGILC.SUMMERNUCLEARSTATIONUNIT1 NRCREGULATORY ISSUE

SUMMARY

202101 PREPARATION ANDSCHEDULING OFOPERATOR LICENSING EXAMINATIONS Inresponse toNRCRegulatory Issue Summary2021-01, enclosed istherequested information onproposed site-specific operator licensing examinationschedules andthe estimated number ofapplicants planning totakethose examinations and/or theNRC's generic fundamentals examinations (GFEs).

Nonewcommitments areintended bythis letter.

Ifyouhaveanyquestions concerning j

this information, please contact Mr.Craig Slyat(804) 273-2784.

II Sincerely, j

/

MarkD.Sartain VicePresident

- Nuclear Engineering andFleet Support Dominion Energy

Services, Inc.

for

(

Dominion Energy Nuclear Connecticut, Inc.

Virginia Electric andPowerCompanyand Dominion Energy South

Carolina, inc.

>b l

i

SN21-136 Scheduling ofOperator Licensing Examinations Page2of3

Enclosures:

1 NRCForm536forMillstone 2.NRCForm536forNorth Anna 3.NRCForm536forSurry

4. NRC Form536forV.C.Summer Commitments made by thisletter:

None cc:

U.S.Nuclear Regulatory Commission Region I

ATTN:Operations Branch 2100Renaissance Boulevard Suite 100 KingofPrussia, PA 19406-2713 U.S.Nuclear Regulatory Commission Region II ATTN:Operations Branch Marquis OneTower 245Peachtree Center

Avenue, NE Suite 1200
Atlanta, GA30303-1257 Mr.Richard Guzman U.S.Nuclear Regulatory Commission OneWhite Flint North MailStopO8C-2 11555Rockville Pike Rockville, MD20852-2738 G.Edward Miller NRCProject Manager U.S.Nuclear Regulatory Commission OneWhiteFlint North 11555Rockville Pike MailStop09E-3 Rockville, MD20852-2738 Vaughan Thomas NRCProject Manager U.S.Nuclear Regulatory Commission OneWhite Flint North 11555Rockville Pike Mail Stop04F-12 Rockville, MD20852-2738

SN21-136 Scheduling ofOperator Licensing Examinations Page3of3 NRC Senior ResidentInspector Millstone Power Station NRCSenior Resident inspector North AnnaPower Station NRCSenior Resident inspector Surry Power Station NRCSenior Resident Inspector V.C.SummerNuclear Station

SN21-136 Scheduling ofOperator Licensing Examinations NRCForm 536 forMillstonePowerStation Millstone PowerStation Dominion Energy Nuclear Connecticut, INC

NRC FORM536 U.S.NUCLEAR REGULATORY COMMISSION APPROVED BYOMB:NO,3150-0131 EXPIRES:

01/31/2024 are Estimated burden per response tocomply with this voluntary information collec6on request 45minutes. !

(01-2021) bog This informa6on collection isused toplan budgets andresources for operator examinations.

Send OPERATORLICENSING comments regarding burden estimate fotheFOlA,

Library, andinformation Collec6ons Branch (T6 j

3 E

=-

A10M),

U.S.

Nuclear Regulatory Commission, Washington, DC 205550001, orbye-mail to 1

/

EXAMINATION DATA infocoirects.Resourceanrc.gov

/and the OMBreviewer atOMBOffice ofInformation adRegulatory j

,g

Affairs, (3150-0131),

Attn:

Desk Omcer for theNuclear Regulatory Commission, 72517th Street NW, Washington, DC20503; email:

h.

TheNRCmaynotconduct or

sponsor, andaperson isnotrequired forespond to,acollec6on ofinformation unless thedocument requesting orrequiring thecollecdon displays acurrently valid OMBcontrol number.

FACILITY NRCREGlON Millstone Unit 2

A.PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 2023 CY2024 CY2025 CY2026 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS

!i B.INITIAL OPERATORLICENSE EXAMINATIONS PROPOSED NUMBER CY2023 CY2024 CY2025 CY2026 j

i NUMBEROFREACTOR 0

8 0

8 OPERATORS i

NUMBER OFSENIOR REACTOR 0

4 0

4 OPERATORS

- INSTANT

,f NUMBER OFSENIORREACTOR j

0 4

0 4

OPERATORS

- UPGRADE f

NUMBER OFSENIORREACTOR 0

0 0

0

'OPERATORS

- LIMITED

i PROPOSED DATES r!

PRIMARY DATE N/A 9/9/2024 N/A 9/14/2026 (

ALTERNATE DATE N/A 9/16/2024 N/A 9/21/2026 j

NRCFORM 536(01-2021)

NRC FORM536 U.S.NUCLEAR REGULATORY COMMISSION APPROVED BYOMB:NO.31500131 EXPIRES:

01/31/2024 (012021)

Estimated burden perresponse tocomply with this voluntary information collection request 45minutes. (

og This information collection isused toplan budgels andresources for operator examinations.

Send

(

OPERATOR LICENSING mis regarding burden estimate totheFOIA,

Ubrary, andInformation Collections Branch (T-6 3

i a

EXAMINATION DATA AiOM),

U.S.

Nuclear Regulatory Commission, Washington, DC 205550001, orbyemail to i

Infocom.Resource@nm.gov, andthe OMBh at0Meomce oHnformadon andRegulatory l

Affairs, (31504131),

Attn:

Desk 0mcer for theNuclear Regulatory Commission, 72517th Sireet NW, gg Washington, DC20503; emall:

nira.submissioa@ombaggov.

TheNRCmaynotconduct or i

sponsor, andaperson isnotrequired 10respond to,acollection ofinformation unless thedocument i

requesting orrequiring the collection displays acurrently valid0MB control number.

FAClUTY NRCREGION Millstone Unit 3

I A.PROPOSED EXAMINATION PREPARATION'SCHEDULE i

~

PROPOSED NUMBER CY2023 CY2024 CY2025 CY2026 ESTIMATED NUMBER OF LICE.NSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B.INITIAL OPERATOR LICENSE EXAMINATIONS j

PROPOSED NUMBER CY2023 CY2024 CY2025 CY2026 j

NUMBER OFREACTOR g

g g

g OPERATORS I

4 0

4 0

NUMBER OFSENIORREACTOR OPERATORS

- INSTANT NUMBER OFSENIORREACTOR 4

0 4

0 OPERATORS

- UPGRADE

,(!

NUMBEROFSENIOR REACTOR 0

0 0

0 i

OPERATORS

- LIMITED PROPOSED DATES 4ti i

PRIMARY DATE 9/11/23 N/A 9/15/25 N/A i

ALTERNATE DATE 9/18/23 N/A 9/22/25 N/A NRCFORM538(01-2021) j i

SN21-136 Scheduling ofOperator Licensing Examinations Enclosure 2

NRCForm 536 forNorth AnnaPowerStation NorthAnnaPowerStation Virginia Electric andPowerCompany

NRCFORM536 U.S.NUCLEAR REGULATORY COMMISSIONAPPROVEDBYOMB:No.31600131 EXPIRES:01/31/2024 W#

neam Estimated burden perresponse tocomply with this voluntary information collection request:

45minutes.

  • og This information collection isusedtoplan budgets andresources for operator examinations.

Send f

3 OPERATOR LICENSING comments regarding burden estimate totheFolA,

Libraiy, andinformation Collections Branch (T6 t;

e A10M),

U.SNuclear Regulatory Commission, Washington, DC 20555-0001, orbye-mail to EXAMINATION DATA iniocosiecis.Resourceanre.govand iheous,eviewerat oueofficeofinformationandRegoi

Affairs, (31500131),

Attn:

DeskOfficer for theNuclear Regulatory Commission, 72517th Street NW, m g Washington, DC20503; e-mail:

ojraft)mjssjon@omAeop,gov.

TheNRCmaynotconduct or

sponsor, andaperson isnotrequired torespond fo,acollection ofinformation unless thedocument requesting orrequiring thecollection displays acurrently valid OMBcontrol number.

FACILITY NRCREGION North AnnaPowerStation II A.PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER CY 23 CY 24 CY 25 CY 26 ESTIMATED NUMBER OF LICENSEE-PREPARED 0

1 0

1 EXAMINATIONS ESTIMATED NUMBEROF NRC-PREPARED 0

0 0

0 EXAMINATIONS B.INITIAL OPERATOR LICENSE EXAMINATIONS PROPOSEDNUMBER CY 23 CY 24 CY 25 CY 26 NUMBER OFREACTOR g

g g

g OPERATORS NUMBEROFSENIORREACTOR 0

4 0

4 OPERATORS

- INSTANT NUMBEROFSENIORREACTOR 0

4 0

4 OPERATORS

- UPGRADE NUMBEROFSENIORREACTOR 0

0 0

0 OPERATORS

- LIMITED PROPOSED DATES PRIMARY DATE 06/03/2024 06/01/2026 ALTERNATE DATE 06/17/2024 06/15/2026 NRCFORM536(01-2021)

SN21-136 Scheduling ofOperator Licensing Examinations Enclosure 3

NRC Form 536forSurry PowerStation Surry PowerStation Virginia Electric andPowerCompany

NRCFORM-536 U.S.NUCLEARREGULATORY COMMISSIONAPPROVED BYOMB:NO.31500131 EXPIRES:

01/31/2024

  1. -M aaom Estimated burden perresponse tocomply with this voluntary information collection request:

45minutes.

/

  • og This information collection isusedtoplan budgets andresources for operator examinations.

Send

/

  • g OPERATOR LICENSING cometsreganting burden es6mate totheFOM,Ubmry, andInformaUon Cdections Branch

@6 t

=

A10M),

U.S.Nuclear Regulatory Commission, Washington, DC 20555-0001, orbyemail to g

,f EXAMINATION DATA infoesects.Resourceanec.gov, andtheousreviewer at:ousOffice ofInformation andRegulatory

' w

+*

Affairs, (31540131),

Attn:

DeskOfficer for theNudear Regulatory Commission, 72517th Street NW, Washington, DC20503; email:

oirasubmission@omtLeggov.

TheNRCmaynotconduct or

sponsor, andaperson isnotrequired torespond to, acollection ofinformation unless thedocument requesting orrequiring thecollection displays acurrently valid OuBcontrol number.

FAClLITY NRCREGION Surry Power Station ll A.PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSEDNUMBER CY 2023 CY2024 CY2025 CY2026 ESTIMATED NUMBER OF LICENSEE-PREPARED 1

0 1

0 EXAMINATIONS ESTIMATED NUMBEROF NRC-PREPARED 0

0 0

0 EXAMINATIONS B.INITIAL OPERATORLICENSEEXAMINATIONS PROPOSED NUMBER CY2023 CY2024 CY2025 CY2026 NUMBEROFREACTOR 11 11 OPERATORS NUMBEROFSENIORREACTOR OPERATORS

- INSTANT 3

3 NUMBEROFSENIOR REACTOR OPERATORS

- UPGRADE 2

2 NUMBER OFSENIORREACTOR 0

0 OPERATORS

- LIMITED PROPOSED DATES PRIMARY DATE 8/21/2023 8/18/2025 ALTERNATE DATE 8/28/2023 8/25/2025 NRCFORM536(01-2021)

SN21-136 Scheduling ofOperator Licensing Examinations Enclosure 4

NRCForm 536 forVirgil C.SummerNuclear Station Virgil C.SummerNuclear Station Dominion Energy SouthCarolina, INC.

NRCFORM536 U.S.NUCLEARREGULATORY COMMISSIONAPPROVED BYOMB:NO 3160-0131 EXPIRES:01/31/2024 (01-2021) saneag Estimated burden perresponse tocomply with this voluntary information collection request:

45minutes.

  • og OPERATORLICENSING comments regarding burden estimate totheFOlA,Library, andInformation Collections Branch (T-6 This information collection isusedtoplan budgets andresources for operator examinations.

Send f

3 EXAMINATION DATA A10M),

U.S.Nuclear Regulatory Commission, Washington, DC 20555-0001, orbye-mail to t;

e infocollects.Resource@nre.gov, andtheOMBreviewer atOMBOffice ofInformation andRegulatory

Affairs, (31504131),

Attn:

Desk Officer for theNuclear Regulatory Commission, 72517th Street NW, mg Washington, DC 20503; e-maitom.

TheNRCmaynotconduct or

sponsor, andaperson isnotrequired torespond to,acollection ofinformation unless thedocument requesting orrequiring thecollection displays acurrently valid OMBcontrol number.

FACILITY NRCREGION V.C.SUMMER REGIONII A.PROPOSED EXAMINATION PREPARATION SCHEDULE PROPOSED NUMBER Cy 2023 CY2024 CY2025 CY2026

~~:::.::...

ESTIMATED NUMBEROF LICENSEE-PREPARED I

0 1

0 EXAMINATIONS ESTIMATED NUMBER OF NRC-PREPARED 0

0 0

0 EXAMINATIONS B.INITIAL OPERATORLICENSE EXAMINATIONS PROPOSED NUMBER CY2023 CY2024 CY2025 CY2026 NUMBEROFREACTOR g

g g

g OPERATORS NUMBEROFSENIORREACTOR 2

0 2

0 OPERATORS

- INSTANT NUMBER OFSENIORREACTOR 4

0 4

0 OPERATORS

- UPGRADE NUMBEROFSENIORREACTOR g

g g

g OPERATORS

- LIMITED PROPOSED DATES 10/23-11/03 N/A 7/7-7/18 N/A PRIMARY DATE 10/23-11/03 N/A 7/7-7/18 N/A ALTERNATE DATE 11/6-11/17 N/A 7/14-7/25 N/A NRCFORM536(01-2021)