9 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems, Figures
ML20339A043
Person / Time
Site: Ginna Constellation icon.png
Issue date: 11/20/2020
From:
Exelon Generation Co
To:
Office of Nuclear Reactor Regulation
Shared Package
ML20339A309 List: ... further results
References
Download: ML20339A043 (18)


Text

Figure 9.1-1 Fuel Handling Structures GINNA/UFSAR CHAPTER 9 AUXILIARY SYSTEMS Revision 29 11/2020

~;

==

ILDINC

- 00 8 CJD CJ 0

ROCHESTER GAS AND R.E. CJNNA NUCLEAR f'INAL SAfETY UPDATED ANALYSIS F'igur e 9.1-1 H.ndhng Slruclurc :s F'uel REV. 16 4/0l

Figure 9.1-2 Figure DELETED GINNA/UFSAR CHAPTER 9 AUXILIARY SYSTEMS Revision 29 11/2020 Figure Deleted

Figure 9.1-3 Arrangement of Spent Fuel Storage Racks GINNA/UFSAR CHAPTER 9 AUXILIARY SYSTEMS Revision 29 11/2020

i.
  • .,.*w 18

+

IC ID 83 SPENT FU£!.

rfi FRESH FUEL

+

+

1£ 28 IF ROCHESTER GAS AND ELECTIUC CORPORATION R.E. GINNA NUCLEAR POWER PLANT UPDATED FINAL SAFETY ANALYSIS REPORT Figure 9.1-3 Arrangement of Spent Fuel Storage Racks REV. 15 10/99

Revision 26 4/2016 Figure 9.1-4 Figure DELETED GINNA/UFSAR CHAPTER 9 AUXILIARY SYSTEMS Revision 29 11/2020 Figure Deleted

Revision 26 4/2016 Figure 9.1-5 Figure DELETED GINNA/UFSAR CHAPTER 9 AUXILIARY SYSTEMS Revision 29 11/2020 Figure Deleted

Figure 9.1-6 Figure DELETED GINNA/UFSAR CHAPTER 9 AUXILIARY SYSTEMS Revision 29 11/2020 Figure Deleted

Figure 9.1-7 Spent Fuel Pool Cooling Cycle GINNA/UFSAR CHAPTER 9 AUXILIARY SYSTEMS Revision 29 11/2020 SPENT F EL POOL WATER LVEL El. 276'\\ 1 J/4" r-----------------------t l. l'lfi'!i i i I i f EL. 276'0" TOP OF SLOT E:'.L 25\\ '8"

[l. 260'6" OP,E:RATING FLOOR El. 271 '0° SPENT run POOL HE'.AT EXCHANGER

!NTERt-1£0LATE FLOOR EL. 253'0" SPfNT FUEL POOL Fl.OCR E:L. 236'8"

~----~

~* <# L-t-J~---=---==~---

L;.!.:..::~-~--7_-_:-_~_t_:--..:;_-._-_-_-.:_-_:_-T-_-::.)

BASEMENT FLOOR EL. 2JS'8'"

NOTE:S:

1, Di SCHARG[ IS TO FLOOR ELEVATION AT WEST END or POOL.

2. ALL ELEVATIONS ARE REFERENCE DIMENSIONS.

ROCHESTER GAS AND ELECTRIC CORPORATION R.E. GINNA NUCLEAR POWER PLANT UPDATED FINAL SAFETY ANALYSIS REPOR'f Figure 9.1-7 Spent Fuel Pool Cooling Cycle REV. 15 10/99

Figure 9.1-8 Figure DELETED GINNA/UFSAR CHAPTER 9 AUXILIARY SYSTEMS Revision 29 11/2020 Figure Deleted

Figure 9.1-9 Figure DELETED GINNA/UFSAR CHAPTER 9 AUXILIARY SYSTEMS Revision 29 11/2020 Figure Deleted

Figure 9.1-10 Reactor Vessel Head Lifting Device GINNA/UFSAR CHAPTER 9 AUXILIARY SYSTEMS Revision 29 11/2020 6-5/ 8 i n. DIAMETER BOTTOM PIN ---J.....

SL ING ASSEMBLY LINK---,..,a.:-

4 i n. DIAMETER CLEVIS PIN SUPPORT LUG 0

6-5/8 in. DIAMETER HOOK PIN LIFTING PLATE LI NK LUG PPER CLEVIS i n. DIAMETER CLEVIS PI N RING GIRDER LEG CLEVIS PLATE 3 in. DIAMETER CLEV IS PIN ROCHHTtR GAS ANO ELECTRIC COfll'ORATION R.E. GINNA NUCLEAR POWER P'LANT UP'OATtO FINAL SAFETY ANAL Y111 REP'ORT figure 9. 1-10 React or Vessel Head Li fting Device

Figure 9.1-11 Fuel Handling Devices GINNA/UFSAR CHAPTER 9 AUXILIARY SYSTEMS Revision 29 11/2020 I ~IATlat.w.PI.E IIANtll 116 TOOl 42 FT LOIIG ft Ell FIR ASSEM81. Y IWIOl.!N6Tt0.

Z2 IN. lOljG THll'IBI.£ PLUG HAlllll!NG TOOl Z9 FT LONG lOO DIIIYE SIWT Toot 19 FT LONG IIUW\\Bl[ POllOll ROO ASSE!el.Y ROIOVAl TOOL 32 FT lOIIG SPl'NT fU[l ASS016lY lfMDl I HG !Oil.

32 FT lOHG 5PENTFUEL CASK LOADING TOOl 27 s* LONG 6

POATABI.E RCCA TOOL USED IN SPENT RJ8. POOL 33FTLONG

Figure 9.3-1 Maximum Tritium Activity Released to Primary Coolant GINNA/UFSAR CHAPTER 9 AUXILIARY SYSTEMS Revision 29 11/2020 l11soo+---------- -=-=***----*-

1 t~ +---------,,<---~.-!*c...*-----_-_--_***_**_**_***_**_**_***_**_**_**_* ----

E c:.

-s

~

J 0

10

-oeslsn Bash Clad ~1ea1e (l°")

      • E,pee1ed Clad ~lease (2%)

lS CVcltTlme (months) 20

Revision 26 4/2016 Figure 9.5-1 Figure DELETED GINNA/UFSAR CHAPTER 9 AUXILIARY SYSTEMS Revision 29 11/2020 Figure Deleted

Revision 26 4/2016 Figure 9.5-2 Figure DELETED GINNA/UFSAR CHAPTER 9 AUXILIARY SYSTEMS Revision 29 11/2020 Figure Deleted

Revision 26 4/2016 Figure 9.5-3 Figure DELETED GINNA/UFSAR CHAPTER 9 AUXILIARY SYSTEMS Revision 29 11/2020 Figure Deleted

Revision 26 4/2016 Figure 9.5-4 Figure DELETED GINNA/UFSAR CHAPTER 9 AUXILIARY SYSTEMS Revision 29 11/2020 Figure Deleted

Figure 9.5-5 Figure DELETED GINNA/UFSAR CHAPTER 9 AUXILIARY SYSTEMS Revision 29 11/2020 Figure Deleted

Figure 9.5-6 Diesel Engine Lubricating Oil Systems (Simplified)

GINNA/UFSAR CHAPTER 9 AUXILIARY SYSTEMS Revision 29 11/2020 w

z:

'-" 5 0

a:

w

<.!)

a:

c<v">

I:'-'l uz o-a:<

o:::,w I-I- a:,

w a:,

...JC.

w:c

~~ "'

w 1-__

,...,:....._--1 3 Fl ROCHESTER GAS AND ELECTRIC CORPORATION R. E. GINNA NUCLEAR POWER PLANT UPDATED FINAL SAFETY ANALYSIS REPORT Figure 9. 5-6 Diesel Eng ine Lubricating Oil System (Simplified)

REV 3 12/87