_ _ - _ _ - _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ - _ _ _ - - _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _. _ - _ _ _ - _ _ _ _ _ _ _ _ _
l s
S 0
l so.am m Pilgrim Nuclear Power Stefon Rocky Hill Road 1
Plymouth, Massachusetts 02360-5599 l
I l
Nancy L Desmond June 25, 1998 Regulatory Relatione Group Manager BECo Ltr. 2.98.081 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Docket No. 50-293 License No. DPR-35 0
Revised Technical Specification Paoes By letter dated September 19,1997, Boston Edison Company submitted proposed changes to the Pilgrim Nuclear Power Station Technical Specifications (TS) to relocate the Radioactive Effluent Technical Specifications and the Radiological Environmental Monitoring Program to the Offsite Dose Calculation Manual in accordance with the recommendations of Generic Letter 89-01 and NUREG 1433. In order to minimize future revisions to plant programs and procedures, changes to other sections were also proposed to align the current TS with NUREG 1433.
The subsequent NRC review of this submittal determined additional revisions to the proposed TS would be appropriate to improve certain sections. The ravisions discussed with your staff on June 3,1998, have been incorporated into pages 3/4.8.1 and 2, B3/4.8-1,4,5,
- 6. and 7, and 5.0-7 of the " Revised Technical Specification Pages" of our submittal (Attachment B). We are providing a complete set of " Revised Technical Specification Pages" with change burs applied (original did not have change bars).
These revisions are editorialin nature and do not affect the conclusions previously submitted regarding our determination of no significant hazards consideration.
If you have any questions, please contact Marie T. Lenhart, Regulatory Affairs Department, at (508) 838-7937.
/
Nancy L. Besmond
Attachment:
Revised Technical Specification Pages s
h00' 9806220310 980615
~^
yDR ADOCK O M 2931 PDR '
~
l
I l
cc:
Mr. Alan B. Wang, Project Manager U.S. Nuclear Regulatory Commission I
Project Directorate 1-3 Region 1 Office Of Nuclear Reactor Regulation 475 Allendale Road Mail Stop: OWFN 14B2 King of Prussia, PA 19406 1 White Flint North 11555 Rockville Pike Senior Resident inspector Rockville, MD 20852 Pilgrim Nuclear Power Station Mr. Robert M. Haillsey, Director Mr. Peter LaPorte, Director Operator Licensing and Human Performance Massachusetts Emergency Mangement Center for Communicable Dieseases Office of Emergency Preparedness Mass Dept. of Public Health 400 Worcester Road 305 South Street P.O. Box 1495 Jamaica Plain, MA 02130 Framingham, MA 01701-0317 l
Mr. Jim Muckerheide 400 Worcester Road P.O. Box 1496 Framingham, t/ A 01701
,