Forwards Insp Rept 50-267/89-04 on 890227-0303.No Violations or Deviations Noted
ML20247A995
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 03/17/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Robert Williams
PUBLIC SERVICE CO. OF COLORADO
Shared Package
ML20247A999 List:
References
NUDOCS 8903290249
Download: ML20247A995 (2)


See also: IR 05000267/1989004

Text

'

~

l

l

.

au.

-

.

.."

MAR I 7 lggg

q

d

In Reply. Refer To:

Docket: '50-267/89-04

_ i

'

,

,

' Public Service Company of. Colorado

. ATTN: Robert 0. Williams, Jr., Senior:

.

a'

Vice. President, Nuclear.0perations

P.O. Box 840..

Denver, Colorado 80201-0840

1

Gentlemen:

-This refers to. the inspection. conducted by Mr. R.'. B. Vickrey of this office

j

during the. period February 27 through March 3,1989, of. activities authorized '

'

by NRC Operating License DPR-34 for Fort St. Vrain Nuclear Generating Station,.

and to the discussion of.'our' findings with Mr. C. H. Fuller and other members of

your staff. at the. conclusion of the.. inspection..

1

)

i

.

Within.

1

L

The area examined during'the inspection was licensed operator training.

.this area,'the inspection consisted of selective examination ~of procedures and

)

!.

representative records, interviews with personnel, and observations by the NRC

inspector. The inspection findings are documented in the enclosed inspection

report.

'

Within the scope of the inspection, no violations or deviations were

identified.

!

We have also examined actions.you.have'taken with regard to aLpreviously

)

identified inspection finding. The' status of this item:is' identified in

j

paragraph 2.of the enclosed report.

1

Should you.have any questions concerning this' inspection, we will be pleased' to

l

discuss'them with you.

~

-i

Sincerely,

Original stycg g

A. B. Beach

L. J. Callan, Director-

Division of Reactor Projects

Enclosure:

j.

Appendix - NRC Inspection Report

50-267/89-04-

!

s

cc w/ enclosure:

(see next page)

(

'

RIV:0PS*

.

.C:0PS* '

.D:DRS*

)/OR

~

RBVickrey/lb

JEGagliardo

JLMilhoan

JMlan

/ /89

/',/89

'/ L/89

3/l1/89

  • previcusly concurred

!

8903290249 890317

4

f

4

'

PDR

ADOCK 05000267

-

'.[

O

PDC

j ..

u

.

'

1_

_ . . _ _ . . _ _ _

'

_

-___- - _ - _

-

u

,

Public Service Company of Colorado

-2-

cc w/ enclosure:

Fort St. Vrain Nuclear Station

ATTN:

C. Fuller, Manager, Nuclear

Production Division

16805 WCR 191

Platteville, Colorado 80651

'

Fort St. Vrain Nuclear Station

ATTN:

P. Tomlinson, Manager

Quality Assurance Division

16805 WCR 19)

Platteville, Colorado' 80651

Colorado Public Utilities Conmission

ATTN:

Palph Teague, P.E.

1580 Logan Street OL1

Denver, Colorado 80203

Colorado Radiation Control Program Director

bec to DMB (IE01)

bec distrib. by RIV:

  • RRI
  • R. D. Martin, RA
  • SectionChief(DRP/B)
  • Project Engineer, DRP/B
  • RPB-DRSS

Lisa Shea, RM/ALF

  • MIS System
  • RSTS Operator
  • K. Heitner, NRR Project Manager (MS:

13-D-18)

  • RIV File
  • DRS
  • DRP

J. E. Gagliardo

R. B. Vickrey

  • w/766