ML20245G877
| ML20245G877 | |
| Person / Time | |
|---|---|
| Site: | Maine Yankee |
| Issue date: | 08/01/1989 |
| From: | Whittier G Maine Yankee |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GDW-89-252, GL-89-12, MN-89-101, NUDOCS 8908160241 | |
| Download: ML20245G877 (3) | |
Text
@ ' ~ ~ r V'.
'ia, Lg a %
- ys y MaineYankee
c
+
REUABLE ELECTRICITY FOR MAINE SINCE 1972 h
4 EDISON DRIVE. AUGUSTA, MAINE 04330. (207) 622 4868
!?
y
. August 1,'1989-MN-89-101-GDH-89-252 UNITED' STATES NUCLEAR REGULATORY COMMISSION s
- Attention: Document Control Desk lHashington, DC 20555 Attention: ' Document Control Desk ~
m
References:
(a)- License No. DPR-36 (Docket No. 50-309)
(b) USNRC Generic Letter 89-12 (Operator Licensing Examinations). dated July 6,;1989 p.
' Sub'j ect: Generic Letter 8'9-12 Gentlemen:
n Please find enclosed the Operator. Licensing Examination information Lrequested-in Generic' Letter.89-12.
Very truly yours, MAINE YANKEE L
.))]>l1V G. D. Whittier, Manager Nuclear Engineering and Licensing GDH/HSD'
- Enc 1'osures ig
?
cc: Mr. Richard H. Nessman
[;
,Mr.'Hilliam T. Russell j
b Mr. Patrick M. Sears LMr. Cornelius-Holden F
Mr. Kenneth E. Perkins, Jr., Chief, Operator Licensing Branch go03 f
gBig0y 8'
- 04031-SLH 09 V
1 l
__._____1_________
c l m :J F
v
- ,eY*h
_,[
T.
m f:-
l e
I.h i
. PROPOSED OPERATOR LICENSING EXAMINATION SCHEDULE :
q Facility : Maine Yankee NRC Region I
-j
~
,.c
.i
~
FY 1990.
FY 1991 FY 1992-FY 1993'.
J (10/1/89-9/30/90)
(10/1/90-9/30/91)
(10/1/91-9/30/92)
(10/1/92-9/30/93)
-j p
1.
A'ssigned:
- l Date..
(GL 89-03) 9/90 9/91-9/92 9/93
.#R0 5
7 2
__ 2
'#SRO Instant 1
2-2 2
-l
~s
- SRO Upgrade.
3 4
2 2
- SRO Limited i
'I
- 23 kssigned d
Date
'(GL 89-03)'
- R0z j
~#SRO In'stant
- SRO Upgra'de
-l
- SRO Limited Please indicate-initial cold license examinations by placing an asterisk (*)
)
by the date. Please indicate examinations intended to extend'an operator's license to a'second or subsequent unit with two asterisks (**).
(For example, l
if Unit 1 is in operation and Unit 2 is approaching fuel load, and three R0 1
' candidates with no previous license are to be examined on both Units 1 and 2, tand five with R0 candidates licensed on Unit 1 are to be examined to extend 1
i
.their licenses to Unit 2, then indicate "R0 3,5**.")
i i
1 l
l 04031'-SLH
=
.y,., - i 2-- <. *y PROPOSED REQUALIFICATION EXAMINATION SCHEDULE
. Facility Maine Yankee NRC Region I
Certified - 4/87 Planned Simulation Facility Certification / Approval Date Audited
- 8/88
-1.
FY 1990 FY 1991 FY 1992 FY 1993 f(10/1/89-9/30/90)
(10/1/90-9/30/91)
(10/1/91-9/30/92)
(10/1/92-9/30/93)
- 1..
Date 3/12/90 Date 4/15/91 Date 5/11/92 Date 5/03/93 2.
Date-Date 4/22/91 Date 5/18/92' Date_E/.10192
'3.
Date' Date 4/29/91 Date 5/25/92 Date 5/17/93 4.
Date _...
Date 5/06/91 05te 6/01/92 Date'5/24/93
- 5.<.
Date Date 5/13/91 Date 6/08/92 Date 5/31/93 1.l i
l l
l
{
L04031-SLH
- _ _ _ - _ _ _ _ _ _ _ _ _ - - _ _ _ _ _ _ _