Special Rept:On 870831,Train a Safety Injection Occurred During Performance of Bimonthly Surveillance of solid-state Protection Sys.Caused by Cognitive Personnel Error.Emergency Procedure 2BEP-0 Entered & Exited When Plant Stabilized
ML20236T932
Person / Time
Site: Byron, Comanche Peak  Luminant icon.png
Issue date: 10/27/1987
From: Querio R
COMMONWEALTH EDISON CO.
To: Davis A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
BYRON-87-1045, NUDOCS 8712020175
Download: ML20236T932 (1)


Text

--

(]

- } Byron Nucleagtion C:mm:nw Edison g

g C

  • 4450 North German Church Rord PRIORITY ROUTIllG q

Byron, Illinois 61010 est lpd p

MEEIC of tG & p yy u

of>R S. A A

-October 27, 1987

,w

\\

(ILfhd2 LTR:

BYRON 87-1045 Mr. A. Bert Davis Regional Administrator

>l Region 3 U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glenn Ellyn, Illinois 60137 l

Dear Sir:

l l

This report is being submitted in accordance withvByrdrEStation Unit 2' I

Operating License, NPF-60, Appendix A, Technical Specification.3.S.3 Action C.

l This report addresses a Train A Safety Injection on Unit 2 during a performance of a Solid State Protection System Bi-Monthly surveillance.

On August 31, 1987, while in Hot Standby, Unit 2 shift personnel were performing a Bi-Monthly Surveillance of the Solid State Protection System.

The Train A Output Cabinet Mode Selector Switch was not placed in the test position, resulting in a Train A Safety Injection..The.cause for this event j

was cognitive personnel error by not placing the Mode Selector switch in test. High head injection occurred through valve 2SI8801A, pressurizer level increased from twenty-five.to forty percent and RCS pressure increased from l

three hundred forty five to three hundred fifty five pounds.

l Emergency procedure 2BEP-0 was entered upon receiving the Safety Injection signal and exited when plant conditions.were stabilized. Licensing Event Report (LER) 87-016-00; Docket No. 50-455 also covers this event.

l This is the first safety injection that has occurred-on Byron Unit Two.

l R. E. Querio Station Manager Byron Nuclear Power Station REQ /RC/bf (0064z)

]

cc: P. Brockman, NRC Senior Resident Inspector U. S..NRC Document Control Desk, Washington D.C.