July 14, 1998-L LICENSEE: Detroit Edison Company FACILITY:

Fermi 2 Nuclear Plant ll

SUBJECT:

MEETING WITH THE DETROIT EDISON COMPANY TO DISCUSS THE l

FERMI 2 IMPROVED STANDARD TECHNICAL SPECIFICATIONS

' CONVERSION

' The NRC staff met with DECO at NRC Headquarters on July 7 and 8,1998, to discuss issues related to the Fermi-2 submittal for the conversion to the improved standard technical specifications (STS). The primary focus of the meeting was a review of Section 3.4 of the STS.

i However, a number of more general issues were also discussed. Enclosure 1 lists the meeting participants.

The licensee asked for the status of the beyond-scope issues it had identified in the STS

' submittal. The staff indicated that work packages had been prepared and forwarded to the appropriate technical staff branches for review. The licensee than asked about NRC use of contractors for the review and the staff indicated that three different contractors would be used to review specific sections to identify ' potential problem areas and to propose requests for additionalinformation. The NRC staff will use the results as an input to its review of the STS l

submittal. The participants also discussed the status of proposed amendments to the current l

technical specifications (TSs) and their potential impact on the STS conversion and the timing for a supplemental submittal to incorporate recent amendments and any other changes.

The discussion then turned to a detailed review of the proposed Section 3.4 of the Fermi ;

conversion to the STS. The staff did not note any significant concems with this section. ' Some items were raised that require resolution. These items are listed in Enclosure 2. The licensee and the staff also discussed the outstanding proposed amendments to the current TSs, including their status and likely approaches to incorporating them into the STS.

Both the NRC staff and the licensee felt the meeting was beneficial in terms of identifying potential issues early in the process. Additional meetings to discuss other sections of the conversion are planned for the future.

ORIGINAL SIGNED BY Andrew J. Kugler, Project Manager

/

Project Directorate lll-1 kg)/

9907240114 990714 q

Division of Reactor Projects - Ill/IV

/

DR ADOCK O 1

Office of Nuclear Reactor Regulation p

Docket No. 50-341 i

Enclosures:

As stated j

cc w/ encl: See next page l

DISTRIBUTION. See attached list DOCUMENT NAME: G:\\WPDOCS\\ FERMI \\FE-STS01.MTS

, To vecchre e copy of this document, ind6cate in the box: 'C" e Copy Wthout attachment / enclosure T = Copy Weh attac$rnenUenclosure N" = No copy OFFICE PM:PD31 lE LA:PD31

{N PD:PD3-1 lE I~

NAME AKugler db 0%

CJamersen ( /-

CCarpenter CE DATE-07/ 14 /98 U 07/ W /98 '[2 07/ A /98 l

OFFICIAL RECORD COPY I

4 6

l

!t m'

Detroit Edison Company Fermi 2 t

L cc:

John Flynn, Esquire Mr. Douglas R. Gipson Senior Attomey Senior Vice President Detroit Edison Company Nuclear Generation 2000 Second Avenue Detroit Edison Company Detroit, Michigan 48226 6400 North Dixie Highway l

Newport, MI 48166 Drinking Water and Radiological Protection Division Michigan Department of Environmental Quality 3423 N. Martin Luther King Jr B!/d P. O. Box 30630 CPH Mailroom Lansing, Michigan 48909-8130 U.S. Nuclear Regulatory Commission Resident inspector's Office 6450 W. Dixie Highway Newport, Michigan 48166 Monroe County Emergency Management Division 963 South Raisinville Monroe, Michigan 48161 Regional Administrator, Region 111 U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351 Norman K. Peterson Director, Nuclear Licensing Detroit Edison Company Fermi 2 -280 TAC 6400 North Dixie Highway Newport, Michigan 48166 l

l I

August 1997

e i

e 4

MEETING ATTENDEES FOR JULY 7 AND 8,1998, FERMI 2 MEETING ON THE IMPROVED STANDARD TECHNICAL SPECIFICATIONS CONVERSION NAME AFFILIATION Andrew Kugler NRC/NRR/DRPW/PD31, Project Manager Jack Foster

  • NRC/NRR/ADPR/TSB, Conversion Lead Reviewer Maggalean Weston*

NRC/NRR/ADPR/TSB, Fermi Section 3.4 Lead Reviewer Rodney Johnson

  • Detroit Edison, Supervisor, Licensing Glenn Ohlemacher Detroit Edison, Licensing Charles Boyce Excel Inc. (contractor to Detroit Edison)

Dan Williamson Excel Inc. (contractor to Detroit Edison)

Sid Crawford*

Member of the Public l

l

  • Part-time participant ENCLOSURE 1

e a

?

i ITEMS IDENTIFIED FROM THE FERMI-2 STS SUBMITTAL, SECTION 3.4

1. The NRC Project Manager needs to ensure that the appropriate NRC reviewers are aware of the status of amendments to the current technical specifications (TSs).
2. Current TS 3.4.3.2 includes limiting condition for operation f. for an increase in unidentified leakage in the drywellin Operational Conditions 2 and 3. The standard TS (STS) do not include a similar requirement. The licensee chose to remove this requirement in the conversion. The Section 3.4 lead reviewer will discuss this change with the technical staff.
3. Current TS 3.4.3.2 includes Table 3.4.3.2-1 which lists allowable leakage values for each pressure isolation valve. The STS lists an allowable value per inch of valve size. The licensee adopted the STS except for four valves that are considered a special case. The staff will evaluate whether this is a beyond-scope issue.
4. In STS surveillance requirement 3.4.5.1, the licensee adopted only part of the bracketed frequency entry. It appears to the staff that the proposed TS differs from both the current TS and the STS. The licensee and the staff will discuss this item further at a future date.
5. The licensee did not include STS 3.4.6 bracketed Action B.2. The licensee believes that this was the intent of the bracket for plants that have three methods of reactor coolant system leakage detection. However, there is no clear documentation to support this position. The proposed conversion TS also differs from the current TS. The staff will evaluate whether this is a beyond-scope issue.
6. Current TS 3.4.9.2 includes a requirement to maintain reactor water level greater than or equal to 214 inches. GTG 3.4.9 does not include a similar requirement and the licensee chose not to include the level requirement in its proposed TS. The staff requested that the licensee provide additionalinformation conceming the removal of this requirement in a future submittal.

l I

ENCLOSURE 2 t

i

4 46 t

l-DISTRIBUTION FOR FERMI-2 MEETING

SUMMARY

DATED: July 14, 1998 l

Hard Conv

[. Docket File (60-341)~#

PUBOC"~"" ' ' ~ ~

PD3-1 R/F j

OGC ACRS AKugler E-mail i

SCollins/FMiraglia (SJC1/FJM)

BBoger (BAB2)

EAdensam (EGA1)

BBurgess (BLB)

ESchweibinz (ERS) i TMartin (SLM3) i THiltz (TGH)

JFoster (JWF) i MWeston (MWW)

CJamerson (CAJ1) l 7

j l.

- - _ _ _ _ _ _ _ _ _ _ _ _ -.. - - -..------_______-_ _______ ______________ _ ____ __________ ;