Confirms Telcons Establishing 870518-22 as Dates for NRC Equipment Qualification Insp.Items to Be Included in Insp Listed.Encl Withheld
ML20235Z766
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 04/29/1987
From: Merschoff E
Office of Nuclear Reactor Regulation
To: Cockfield D
PORTLAND GENERAL ELECTRIC CO.
Shared Package
ML19304B604 List:
References
TAC-42502, NUDOCS 8710210307
Download: ML20235Z766 (3)


Text

.-_

7/hb y.

[

%{'

UNITED STATES 8'

NUCLEAR REGULATORY COMMISSION o

g

E WASHINGTON, D. C. 20655 j

\\*****/

f18g /0 -/

l April 29,'1987

$4 5( N 0 $

l l

Docket No. 50-344 1

Portland General Electric Company ATTN: Mr. D. W. Cockfield Vice President, Nuclear Division i

121 S. W. Salmon Street Portland, Oregon 97204

Dear Mr. Cockfield:

SUBJECT:

EQUIPMENT QUALIFICATION INSPECTION OF TROJAN NOCLEAR PLANT l

(INSPECTIONNO. 50-344/87-13)-

This letter confirms the dates of May 18 through 22, 1987 for the NRC equipment l

qualification (EQ) inspection for Trojan.

These dates were established during previous telephone conversations with your staff by Mr. S. D. Alexander of this-office. The inspection will take place at your corporate engineering offices in Portland on May 18-22, 1987 and at at the plant site May. 20, 1987.

A management entrance meeting is scheduled for.3:00 p.m. on Monday, May 18, 1987-at your corporate engineering offices in Portla'nd.

A management exit meeting is tentatively scheduled for 10:00 a.m. on Friday, May 22, 1987 also at the Portland engineering offices. A plant walkdown inspection is planned for Wednesday, May 20, 1987.

The inspection will include the following:

1.

Review of your implementation of a 10 CFR 50.49 program including preser-

~

vation of the qualified status of qualified equipment.

P.

Review of your implementation of Technical. Evaluation Report / Safety Eval-uation Report EQ corrective action commitments.

3.

Review of EQ documentation files.

4.

Physical inspection of selected plant equipment and selected field wiring.

8710210307 870429 PDR ADOCK 05000344-G PDR

- ~ _. _ _ _ - _ - _ - -. _ - _ _. - _ - - -.. _._

a

r r

f Portland General Electric April 29,~1987' Company :;

j Your cooperation with us during this' inspection will be appreciated. ' Should you have any questions regarding.this ' inspection, please contact Mr. John Burdoin

.of NRC/RV at (415) 943-3852 orMr.StephenAlexander-(LeadInspector)ofNRC/NRR' at(301)492-7480.

Sincerely, A

Gftv

  1. Ellis~W. Merschoff, ng Chief

\\

Vendor Inspection Eranch -

l Division-of Reactor Inspection and Safeguards

' Office of Nuclear Reactor Regulation L

Enclosure:

l Inspection Team Roster l

l l

cc:

C. A. Olmstead, Plant Manager Trojan Nuclear Plant P. O. Box 439 1

Ranier, OR 97048 1

E. L. Davis, Chief Electrical Engineer PG&E.

121 S. W. Salmon Street i

Portland, OR 97204 l

']

1 1

i j

-l L-_-_

3

+

t1 BL

r '

Portland General' Electric

' April 29. 1987

. Company ~

- 31 '

r-Distribution:

NRC PDR

. Local PDR' NRR-DocketFiles(50344)

DRIS Reading

~VIB Reading

'RStarostecki JPartlow BGrimes EMerschoff UPotapovs:

SAlexander

.. %,g, T"ChangNRR/PD5l[43

%ssshaailnM REGION V DISTRIBUTION:-

JMartin,ADM,-RV(LTRONLY)

-DKirsch,(A)D:DRS&P

' ~ -

RPate,'(A)C:RSB,DRS&P SRichards, C:ES.-RSB AChaffee, C:RPB, MMendonca, C:RPS1, RPB JBurdoin, RPS1, RSB Robert C. Barr, SRI Trojan Nuclear Plant Box 0 Ranier, OR 97048 q

l y

?

1 0FC

VIB:DRIS
SC/VIB:DRIS
ABC

.....:..............:....f)p....__:.../VIB:DRIS:

.yg....:...........:.....__.....:............:........

NAME :SAlexander

UPota ovs
EMersthoff' :-

a g............:____........:............:............:........

DATE 4:..............:...........

/51/87

4./2787

,i 4. /23,87