1 1c73
1
1
l
l
Cincinnati Cas and Electric Company
Docket No. 50-358
!
I
ATTN: Mr. W. B. Dickhoner Vice President
Engineering & Electrical Production
139 East 4th Street
Cincinnati, Ohio
45201
Gentlemen:
This refers to the inspection conducted by Mr. L. J. Garvin of the
Region V, Directorate of Regulatory, Operations Office, on August 6-8,
1973, at the Associated Piping and Engineering Plant located fn
Cotcpton, California, with regard to the f abrication of the primary
steam piping for the Zimmer No. I reactor facility and to the dis-
cussion of our findings at the conclusion of the inspection with
representative of Associated Piping and Engineering Company, General
Electric Company, and Mr. Schwiers of your staff.
The area examined during the inspection is identified in the enclosed
(
inspection report. Within this area,~the inspection consisted of
selective examination of the manufacturer's quality control manual and
records, interviews with plant personnel, and observations by the
i'.nspector.
During the innpection, it was found that certain of your activities
cppear to be in violation of AEC requirements. The activities and
reference to the pertinent requirements are listed in the enclosure
to this letter.
This notice is sent to you pursuant to the provisions of Section 2.201
of ths AEC's " Rules of Practice," Part 2, Title 10, Code of Federal
(
Regulations. Section 2.201 requires you to submit to this office,
l
within thirty (30) days cf your receipt of this notice, a written
l
statement or explanation in reply, including:
(1) corrective steps
l
which have been taken by you, and the results achieved; (2) corrective
steps which will be taken to avoid further violations; and (3) the
date when full compliance will be achieved.
'
4
In accordance with Section 2.790 of the AEC's " Rules of Practice,"
Part 2, Title 10, Code of Pederal Regulations, a copy of this letter
I
'
and the enclosed inspection report will be placed in the AEC's Public
]
. i
(
1
1
8709240290 070921
MENZ87-111
+
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
1
_ _
_ _ _ .
..
l
.
.
\\
Cincinnati Cas and
'f
Electric Company
-2-
^
OCT
1 1973
,
Document Room. _ If this report contains any information' that you (or
your contractors) believe to be proprietary, it is necessary that
you make a written application to this office, within 20 days of the
date of this letter, requesting that such information be withheld
from public disclosure. The application must include a full state-
ment of the reasons why it is claimed that the information is
proprietary. The application should be prepared so that any -
I
proprietary information identified is contained in an enclosure to
the application, since the application without the enclosure will
i-
also be placed in-the Public Document Room. If we do not hear from
i
l
you within the specified period, the report will be placed in the
'
Public Document Room.
t
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
Sincerely yours,
James G. Keppler
Regional Director
tuelosures:
1.
Description of Violations
2.
RO Inupsetica Ept No. 030-353/73-06
bec: R0 Chief, FS&EB
RO:HQ (4)
Licensing (4)
DR Central Files _
RO Files
Regions I & II
Local PDR
DTIE
{
t
.
.
,
-
<
..:
- '. . J ' ., -
'
+'
,
,
,
,
,g.,
,
ENCLOSURE
Cincinnati Gas and Electric Company.
'
Docket No. 50-358
i
'l
Certain activities under your construction permit No 'CPPR-88, appear
These apparent violations are
,
to be in violation of AEC requirements.
considered to be of Category II severity and are listed as follows:
.
I
1.
Criterion VI - Document control
" Measures shall be established to
{
Criterion VI states, in part, that:
'
control the issusace of documents, such as instructions, procedures, -
and drawings, including changes thereto, which prescribe all activities
'affecting quality."
g.
Contrary to the above - requirements , ' obsolete drawings , No. . F-15097-A25
Revision 0, and No. F-15097-A26, Revision 0, were not marked " Void"
and were being used in the shop to control work and inspection
activities.
2.
Criterion XVIII - Audits
" Followup action, including
Criterion XVIII states, in part, that:
reaudit of deficient areas, shall be taken where indicated."
.
' Contrary to the above requirement, departments in the vendor shop,-
were not reaudited subsequent to a finding of deficient performance
A8sociated Piping and Engineering
during a quality Assurance audit b7
in March 1973.
~