Summary of August 11, 2020, Teleconference Call with Tennessee Valley Authority Regarding a Planned License Amendment Request for Watts Bar Nuclear Plant, Units 1 and 2
ML20233A835
Person / Time
Site: Watts Bar  Tennessee Valley Authority icon.png
Issue date: 08/25/2020
From: Kimberly Green
Plant Licensing Branch II
To: Jim Barstow
Tennessee Valley Authority
Green K
References
EPID L-2020-LRM-0064
Download: ML20233A835 (5)


Text

August 25, 2020 LICENSEE:

Tennessee Valley Authority FACILITY:

Watts Bar Nuclear Plant, Units 1 and 2

SUBJECT:

SUMMARY

OF AUGUST 11, 2020, TELECONFERENCE CALL WITH TENNESSEE VALLEY AUTHORITY REGARDING A PLANNED LICENSE AMENDMENT REQUEST FOR WATTS BAR NUCLEAR PLANT, UNITS 1 AND 2 (EPID L-2020-LRM-0064)

On August 11, 2020, a Category 1 public teleconference call was held between the U.S. Nuclear Regulatory Commission (NRC) staff and representatives of Tennessee Valley Authority (TVA). The purpose of the meeting was to discuss TVAs planned license amendment request (LAR) for Watts Bar Nuclear Plant (WBN), Units 1 and 2. The LAR would seek to revise WBN Technical Specification (TS) 3.3.2, Table 1 Function 6.e Auxiliary Feedwater Auto -Start from Loss of Main Feedwater Pumps.

The meeting notice and agenda, dated July 17, 2020, are available in Agencywide Documents Access and Management System (ADAMS) at Accession No. ML20202A061. TVAs slides for the meeting are available at ADAMS Accession No. ML20220A202. A list of participants is provided as an enclosure to this summary. No regulatory decisions were made at this meeting.

A previous meeting on this subject was held on May 27, 2020 ADAMS Accession No. ML20153A362 to acquaint NRC staff with the regulatory history of the standby main feedwater pump (SBMFP) at WBN. At the May 27th meeting, TVA stated that it would schedule a pre-submittal meeting in August 2020.

During the August 11th meeting, TVA stated that the purpose of TS 3.3.2, Table 1 Function 6.e, Trip of all Turbine Driven Main Feedwater Pumps (TDMFWPs), for Auxiliary Feedwater (AFW) auto-start function is an anticipatory function that provides early actuation of AFW system to mitigate the consequences of a loss of normal feedwater. For the Loss of Normal Feedwater event, the credit for that AFW safety function actuation is from the AFW auto-start on low-low steam generator (SG) level, which is TS 3.3.2, Table 1 Function 6.b.

TVA recalled the function and operation of main feedwater system (see description in ADAMS Accession No. ML20153A362).

TVA explained that it wants to change Function 6.e because controlling SG water level and feedwater control using AFW motor-driven pumps at low reactor thermal power can be challenging. Additionally, feedwater swings affect temperature and power, which is not ideal at low powers when there are tight control bands. TVA places a TDMFP in service at around 4 percent reactor thermal power (RTP), but the use of the TDMFP is more suitable at a higher reactor thermal power. TVA proposes to use the SBFMP to provide feedwater flow from Mode 3 to Mode 1, up to 15 percent RTP. At approximately 15 percent RTP, a TDMFP would be placed in service in Mode 1 to control SG water levels, and the SBMFP would be removed from service. TVA stated that the use of the SBMFP during start up activities would simplify startup activities.

To make the change, TVA proposes to revise the AFW auto-start logic by adding a SBMFP power supply breaker contact interface to the AFW auto-start logic. This breaker contact will close when the breaker is open. This will cause the AFW auto-start logic to initiate from the trip of both TDMFPs and the SBMFP. TVA explained that the SBMFP trip channel will be provided with a manual trip enable switch (hand switch) that allows operators to enable the trip when the SBMFP is not operable. The revised circuitry will remain as an anticipatory AFW auto-start function but will not be credited in the WBN accident analyses. The NRC staff asked why it was necessary to include the hand switch for bypass of the SBMFP AFW actuation contact. TVA replied that this will allow the operators to defeat the SBMFP AFW actuation when MFPs are operating so that the loss of MFPs when the plant is operating at higher power levels will ensure AFW actuation regardless of the state of the SBMFP. The NRC staff suggested that TVA consider including language in the TS about the operation of the hand switch. TVA indicated that it will consider the staffs feedback.

The NRC staff asked TVA if there would be a need for a note to require bypass of the SBMFP trip when operating at high loads with the SBMFP and both TDMFPs in service. The staff commented that the anticipatory AFW pump start following a trip of both TDMFPs (e.g., due to loss of condenser vacuum) at high-power with the SBMFP continuing to operate may be more safety-significant than an anticipatory AFW pump start following a SBMFP trip during startup and at low power. TVA stated that it has an analysis for when both TDMFPs are unavailable and the conclusion is that a partial loss of normal feedwater is not worse than a complete loss of normal feedwater. However, TVA said that it would consider the staffs feedback.

The NRC staff noted that the ability to operate the SBMFP and the TDMFPs simultaneously is conservative in certain circumstances. The staff wanted to be sure that the licensee could take advantage of the added flexibilities during startup. The staff stated that there might be a safety benefit to have main feedwater pump idling and ready even if its not feeding water to the steam generators. TVA said that it would also consider this feedback from the staff.

The proposed TS changes will include a revision to TS 3.3.2, Table 1 Function 6.e to denote that the AFW auto-start will include the trip of the two TDMFPs and the SBMFP. They will also include the applicability of the SBMFP trip channel to Modes 1 and 2, and a new TS 3.3.2 condition to address the inoperability of the SBMFP trip function.

TVA plans to submit the LAR on or about September 1, 2020.

No comments or public meeting feedback were received.

Please direct any inquiries to me at 301-415-1627, or Kimberly.Green@nrc.gov.

/RA/

Kimberly J. Green, Senior Project Manager Plant Licensing Branch II-2 Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation Docket Nos. 50-390 and 50-391

Enclosure:

List of Participants cc: Listserv

ML20233A835

  • via email OFFICE NRR/DORL/LPL2-2/PM NRR/DORL/LPL2-2/LA* NRR/DORL/LPL2-2/BC* NRR/DORL/LPL2-2/PM NAME KGreen BAbeywickrama UShoop KGreen DATE 08/24/2020 08/21/2020 08/24/2020 08/25/2020

Enclosure LIST OF PARTICIPANTS AUGUST 11, 2020, PUBLIC TELECONFERENCE CALL TENNESSEE VALLEY AUTHORITY REGARDING PLANNED LICENSE AMENDMENT REQUEST WATTS BAR NUCLEAR PLANT, UNITS 1 AND 2 Name Organization Kim Green U.S. Nuclear Regulatory Commission (NRC)

Steve Smith NRC Calvin Cheung NRC Rich Stattel NRC Steve Jones NRC Vic Cusumano NRC Brian Wittick NRC Wesley Deschaine NRC Craig Kontz NRC Russell Wells Tennessee Valley Authority (TVA)

Tony Langley TVA Gordon Williams TVA Don Lewis TVA Daniel Fox TVA Kasey Decker TVA Charles Broesche TVA Alex Bowman TVA Ron Cox TVA Yan Peng Member of the public (China Institute of Atomic Energy)