Proposed Tech Specs,Requesting NRC Exercise Discretion Re Compliance W/Srs 4.8.1.1.2.g.2)c)2,4.8.1.1.2.g.3)d) & 4.8.1.1.2.g.4)d)
ML20216F691
Person / Time
Site: Wolf Creek Wolf Creek Nuclear Operating Corporation icon.png
Issue date: 09/05/1997
From:
WOLF CREEK NUCLEAR OPERATING CORP.
To:
Shared Package
ML20216F677 List:
References
NUDOCS 9709120074
Download: ML20216F691 (2)


Text

_ _._ _ _ _.

o 4 -

Attachment to WO 97-0093 j

L

- Page. 7 of 8-ELECTRICAL POWER SYSTEMS

-l SURVEILLANCE REQUIREMENTS (Continued)

d. By verifying fuel oil properties -

of new fuel oil are tested in accordance with, and maintained within the hmits of, the Diesel Fuel Oil Testing Program.

e. By verifying fuel oil properties of stored fuel oil are tested in accordance with, and maintained within the limits of, the Diesel Fuel Oil Testing Program.

?

4

f. At least once per 184 days venfy each diesel generator starts from standby conditions
  • and achieves in less than or eqi v to 12 seconds, a voltage of 4160 + 160 420 volts, and a frequency of 6011.2 Hz using one of the following signals:
1) Manual,or
2) Simulated loss of-offsite power by itself, or
3) Safety injection test signal.

_ g. At least once per 18 months, during shutdown, by:

1) Verifying each diesel generator operating at a power factor between 0.8 and 0 9 does not trip on overspeed and voltage does not exceed 4784 volts and frequency does not exceed 65.4 Hz following a load rejection of 5580 to 6201 kW,"
2) Venfying on an actual or simulated loss-of offsite power signal (LOOP)";

4 a) De-energina.on of emergency buses; b) Load shedding of emergency buses; 4

c) The diesel generator auto-starts from standby conditions"* and:

1) energizes permanently connected loads within 12
seconds,
2) energizes the auto-connected shutdown loads through the shutdown sequencer,*"*
3) maintains steady state voltage at 4160 + 160 420
volts, i

1

  • This test shall be preceded by an engine prelube period so that the mechanical stress and wear on the diesel engine is minimized.

" This surveillance shall not be performed in Modes 1 or 2 and credit may be taken for unplanned events that satisfy this requirement.

"* This test shall be preceded by an engine prelube period and/or other warmup procedures recommended by the manufacturer so that the mechanical stress and wear on the diesel engine is minimized.

'"One-time testing of the blocking / time delay contacts associated with relays K1102, K4102, K1117, K4117,

. K1118, and K4118 at power is permitted. The provisions of Technical Specification 4.0.3 to complete -

. testing within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is extended to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to permit completion of the testing of tiwse contacts by 1906 hours0.0221 days <br />0.529 hours <br />0.00315 weeks <br />7.25233e-4 months <br /> on September 6,1997, i

t WOLF CREEK UNIT 1 3/4 8-4 Amendment No.,101 i

9709120074 970905

~

PDR ADOCK 05000482-P PDR 1

-.n

-.-w-,

-. ~.

e Attachment to WO 97-0093 Page 8 of 8 ELECTRICAL POWER SYSTEMS StJRVEILLANCE REOUIREMENTS (Continued)

4) maintains steady state frequency at 60 t 1.2 Hz, and
5) operates for greater than or equal to 5 minutes while the generator is loaded with the shutdown loads.
3) Verifying on an actual or simulated Safety injection Actuation Signal (SlAS)" that each diesel generator auto-starts from the standby condition
  • and:

a) achieves a voltage of 4160 + 160 420 volts in less than or equal to 12 seconds after the auto-start signal; b) achieves a frequency of 6011.2 Hz in less than or equal to 12 seconds after the auto-start signal; c) operates on standby for greater than or equal to 5 minutes; d) the offsite power source energizes the auto-connected (accident) loads through the LOCA sequencer?"

4) Verifying on a simulated loss-of offsite power in conjunction with a similated Safety injection Actuation Signal (SlAS)"

that each diesel generator auto-starts from the standby condition

  • and; a) achieves a voltage of 4160 + 160 420 volts in less than or equal to 12 seconds after the auto-start signal; b) achieves a frequency of 6011.2 Hz in less than or equal to 12 seconds after the auto-stari signal; c) de-energization of the emergency busses and load shedding from the emergency busses; d) energizes the ssmergency busses with permanently connected loads within 12 seconds, energizes the auto-connected emergency (accident) bads through the LOCA sequencer;"*

e) operates for greater than or equal to 5 minutes while its generator is loaded with emergency loads.

  • 1his test shall be preceded by an engine prelube period and/or other warmup procedures recommended by the manufacturer so that the mechanical stress and wear on the diesel engine is minimized.

" This surveillance shalt not be performed in Modes 1 or 2 and credit may be taken for unplanned events that satisfy this requirement.

'"One-time testing of the blocking / time delay contacts associated with relays K1102, K4102, K1117, K4117, K1118, and K4118 at power is permitted. The provisions of Technical Specification 4.0.3 to complete testing within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> is extended to 48 hours5.555556e-4 days <br />0.0133 hours <br />7.936508e-5 weeks <br />1.8264e-5 months <br /> to permit completion of the testing of these contacts by 1906 hours0.0221 days <br />0.529 hours <br />0.00315 weeks <br />7.25233e-4 months <br /> on September 6,1997, WOLF CREEK - UNIT 1 3/4 8-5 Amendment No.,101