Requests Commission Approval to Publish Proposed Rule in Fr That Would Amend 10CFR55 to Require Power Reactor Facility Licensees to Perpare Entire Initial Exam for ROs & SROs & to Proctor & Grade Written Portion of Exam
ML20216F518
Person / Time
Issue date: 04/08/1997
From: Callan L
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To:
Shared Package
ML20216F483 List:
References
FRN-62FR42426, RULE-PR-55 AF62-1-006, AF62-1-6, SECY-97-079, SECY-97-079-01, SECY-97-079-R, SECY-97-79, SECY-97-79-1, SECY-97-79-R, NUDOCS 9709120013
Download: ML20216F518 (49)


Text

b 4 'T8 - I l

g....g f

\\

Pox e....

RULEMAKING ISSUE (Notation Vote)

April 8. 1997 sECY-97-079 E.03:

The Comissioners ifE:

L. Joseph Callan Executive Director for Operations

SUBJECT:

PROPOSED RULE INITIAL LICENSED OPERATOR EXAMINATION REQUIREMENTS PURPOSE:

To obtain Comission approval to aublish a proposed rule in the,Federa' Reaister that would amend 10 CFR 3 art 55 to require power reactor faci'ity licensees to prepare the entire initial examination for reactor operators (R0s) and senior reactor operators (SR0s) and to proctor and grade the written portion of the examination. This proposed rule would also retain NRC's authority to prepare, administer, proctor, and grade these tests and examinations to maintain its proficiency'in doing so and in the event that it loses cor.F.dence in a facility licensees ability to prepare acceptable tests and examinations, BACKGRQWiD:

On March 24,1995. SECY-95 075 " Proposed Changes to the NRC Operator Licensing Program," informed the Comission of the NRC staff's intent to revise the operator licensing program to allow greater partici)ation by facility licensees and to eliminate contractor assistance in t11s area, in a staff requirements memorandum (SRM) dated April 18, 1995, the Comission approved the staff's proposal to initiate a transition process to revise the operator licensing program and directed the staff to carefully consider experience from pilot examinations before fully implementing the changes. On August 15, 1995, the NRC staff issued Generic Letter (GL) 95-06 " Changes in the Operator Licensing Program " outlining the revised process for developing CONTACT:

NOTE: To BE MADE PUBLICLY AVAILABLE WHEN Siegfried Guenther NRR THE FINAL SRM IS MADE AVAILABLE (301) 415-1056 Harry S. Tovmassian, RES (301) 415-6231 91go13970904 55 62FR42426 PDR

The Comissioners examinations and soliciting volunteers to participate in pilot examinations to evaluate and refine the methodology.

Between October 1. 1995, and April 5, 1996, the NRC staff reviewed and approved 22 operator licensing examinations that had been prepared by. facility licensees in accordance with Revision 7 of NUREG 1021, " Operator Licensing Examiner Standards" (June 1994), as supplemented by guidance contained in GL 95 06. These examinations were then used to test 146 R0 and SR0 applicants.

The NRC staff documented the results of the pilot examinations in SECY-96 123,

  • Proposed Changes to the NRC Operator Licensing Program." and briefed the Commission on June 18, 1996.

In an SRM dated July 23, 1996, the Comission directed the staff to prepare a rulemaking plan to justify the changes to 10 CFR Part 55 and to provide additional information regarding a number of issues related to the revised examination process.

On September 25, 1996, the NRC staff issued SECY-96-206. "Rulemaking Plan for Amendments to 10 CFR Part 55 To Change Licensed Operator Examination Requirements." The Commission approved the rulemaking plan in an SRM dated December 17, 1996.

DISCUSSION:

Pursuant to the SRM of December 17, 1996, in February 1997, the NRC staff issued an interim version of Revision 8 of NUREG 1021, which has been retitled

" Operator Licensing Examination Standards for Power Reactors."

The NRC staff will implement the interim revision on a voluntary basis until the rulemaking is complete. NUREG 1021 was updated to incorporate lessons learned during the pilot examination program and will be further revised, as necessary, based on industry and public comments in response to ti e enclosed Federal Reaister notice. The NRC staff has also issued a supplement to GL 95 06 to inform

~

power reactor facility licensees of the results of the pilot examination' program and the NRC's decision to continue the )1 lot process on a voluntary basis using interim Revision 8 of NUREG 1021, w111e in parallel pursuing mandatory implementation by the industry.

As directed by the Commission, the Office of Nuclear Reactor Regulation (NRR) has continued to monitor the results of the facility prepared examinations for indications that might dissuade the Comission from approving the proposed rulemaking - As an extension of the original pilot program, NRR has asked the NRC examiners to respond to a survey on various aspects of the revised examination process. Furthermore, as noted in SECY-96-206, NRR will continue to audit and review the level of knowledge and the level of difficulty of selected written examinations and operating tests.

Between August 19, 1996, when the NRC staff resumed conducting pilot-style examinations, and the end of December 1996, the staff reviewed approved, and administered 12 examinations that were developed by facility licensees based

-on the guidance in GL 95-06. This raised the total number of examinations completed using the pilot process to 34, including the 22 examinations that were conducted under the original pilot program between October 1. 1995, and April 5, 1996.

Facility prepared examinations were administered to 84 R0 1

l The Comissioners ;

applicants and 144 SR0 applicants during the pilot program through December 31, 1996. The results of these examinations are summarized belom T

the power reactor licensing examination results for fiscal year 1995 are 4

provided for comparison. The pass rates for the facility prepared examinations administered did not vary significantly from those prepared by the NRC.

Power Reactor Pass Rates I

Examinations R0 R0 R0 SRO SRO SR0 Written Operating Total Written Operating Total Facility Prepared 93%

955 88%

94%.

96%

911 Since October 1, 1995 Fiscal Year 1995 94%

98%

924 951

- 95%

92%

The most comon problem identified by the NRC examiners regarding the facilityorepared examinations was that the level of knowledge and difficulty of the su mitted examinations did not consistently discriminate at the appropriate level and that considerable effort was required to work with the facility licensee to revise the examinations to correct this condition.

As noted in SECY-96 206. NUREG 1021 has been modified to establish a standard 4

that at least half of the examination questions be written at the i

comprehension or analysis level. This criterion will take effect when Revision 8 of NUREG 1021 is implemented and should help improve the level of knowledge tested by the submitted examinations.

Although NUREG 1021 contains criteria that should help establish an appropriate level of difficulty for the examinations, the personal experience and judgment of the author and reviewer of the examination remain the most important factors in controlling the level of difficulty.

Traditionally, an NRC or contract examiner established the level of difficulty of the examination. The facility licensee was given an opportunity to review the examination before it was administered.

In most cases, the review with the facility licensee focused on technical issues which the NRC examiner and facility reviewer could easily resolve. On occasion, the facility reviewers have complained that an examination was too difficult.

However reviewers seldom recomended changes that would increase the difficulty of the examination if it was wrceived to be easier than normal.

Under the revised examination process, t1e facility licensee would establish the level of difficulty of the examination. The NRC examiner would work with the facility author to make whatever changes are necessary to ensure that the examination discriminates at the appropriate level. Consequently, the facility r.'epared examinations are generally more difficult to finalize because of the facility licensees' tendency to resist the NRC examiners' efforts to make the examinations more difficult. The revised examination process has

~

significantly changed the focus of the examiners

  • job from ensuring the technical accuracy of examinations prepared by the NRC or its contractors to the much more demanding task of ensuring that the facility licensees maintain the level of difficulty of the examinations that they submit to the NRC for review and approval.

Nevertheless, most NRC examiners who responded to the 1

+ - - -

-q

--r qia e.

-,,,.-e.

7 --

--e.,,.

w y,--4-m,

-.myw ymyy--,,.-y------9.-m,yw,--

--,--.--~--wr,

--.rp g

a y

.------y,.yy--

g w.

',-y,Ar-,m----y

.t The Comissioners 4-NRR survey continue to believe that the revised examination process is as effective as the traditional method.

Pursuant to its audit and review function, NRR has determined that 1 of the 12 pilot style examinations conducted since resuming the program in August 1996 discriminated at a lower level than is currently the norm for NRC or facility prepared examinations. NRR concluded that the examination still provided an adequate basis for licensing the applicants but that the review conducted by the NRC Regional Office was weak and failed to identify and correct a number of test items that were too simplistic for use on a licensing examination..The region is implementing a corrective action plan, with Furthermore, in response to the SRM of December 17, 1996, oversight by NRR.

NRR has issued a memorandum to the Regional Administrators emphasizing-the importance of assigning adequate resources to carry out the operator licensing task, completing a thorough review of every facility prepared examination, and not giving any examination that does not meet NRC standards f leve of difficulty.

is not new to the pilot examination process and that similar deficiencies have been noted in the past on examinations prepared by NRC examiners or contractors.

As noted in SECY 96 206, another problem that surfaced during the pilot examination 3rogram involved an unexplained increase in the number of The staff has not applicants W10 appealed their examination failures.

questioned the applicants about their reasons for challenging the examination results, but it sumises that the pilot examination applicants may feel compelled to contest their failures when they perceive that their facility licensee is not sufficiently assertive in getting the NRC to delete questions or accept additional answers, which would reflect badly on the quality of the In an effort to address this examination that the facility prepared.

possibility the staff has recomended in Revision 8 of NOREG 1021 that facility licensees solicit and address concerns from the individual license Another a>plicants during the process of grading the written examinations.

t1eory regarding the increase la a> peals is unrelated to the r.ilot process and maintains that facility licensees lave generally become more cost-conscious and less willing to give applicants a second chance to pass the NRC licensing examination, so the applicants have nothing to lose by filing an appeal, Regardless of the cause for the incr6ase. NRR has revised the guidance in NUREG 1021 to afford the staff the option of resolving selected appeals internally without convening a panel of examiners.

COORDINATION:

The Office of the The Office of the General Counsel has no legal objection.

Chief financial Officer has no objection to the resource estimates contained The Office of the Chief Information Officer concurs that there in this paper.

The ACRS and CRGR have been will be no information technology impacts.

g contacted and have deferred-review until the public coments are available for p

final-rulemaking..

3

The Commissioners RESOURCES:

Resources to develop this rulemaking are included in the current budget and are estimated to be 0.5 FTE. This proposed action would allow the staff to eliminate between $3 million and $4 million in contractor support for operator licensing program. The FY 1997 and FY 1998 budget request.has been developed to be consistent with this proposal and reflects the anticipated reduction and elimination of contractor support for the operator licensing program.

If the Comission decides not to amend 10 CFR Part 55 as proposed by the NRC staff, it would require agency resources to be reprogramed to increase the contract sup> ort for the operator licensing program or the direct examiner resources in eac t regional office to satisfy the demand for initial licensing examinations.

SCHEDULING:

g The staff requests that the Comission provide its approval of this proposed rulemaking by April 18, 1997.

This request is made to avoid a potential budgetary problem at the beginning of FY 1998.

If the final rule is not effective by that time and a need arises for additional NRC prepared examinations in the interim, it is anticipated that NRR will need to divert staff from other planned activities or reprogram contractual resources to meet this obligation.

Ef, COMMENDATION:

That the Comission:

1.

Acorove the notice of proposed rulemaking (Enclosure 1) for publication in the Federal Reaister, 2.

Certify that this rule, if promulgated, would not have a significant economic impact on a substantial number of small entities to satisfy the requirements of the Regulatory Flexibility Act, 5 U.S.C. 605(b).

3.

Determine that the backfit rule 10 CFR 50.109 does not apply to this proposed rule.

4.

DelRCming that neither an environmental impact statement nor an environmental assessment has been prepared because this aroposed rule is eligible for a categorical exclusion as defined in 10 CF1 51.22(c)(1).

5.

No.te:

a.

This proposed rulemaking will be published in the Federal Reaister for a 75 day public coment period:

b.

The Chief Counsel for Advocacy of the Small Business Administration will be informed of the certification regarding economic impact on small entities and the reasons for it as required by the Regulatory Flexibility Act:

i l

The Comissioners The proposed rule contains information collection requirements that C.

are subject ~to review by the Office of Management and Budget (OMB):

d.

A regulatory analysis has been prepared (Enclosure 2):

The appropriate Congressional comittees will be informed e.

(Enclo:ure 3):

f. A public announcement will be issued (Enclosure 4); and Copies of the notice of proposed rulemaking will be distributed to 9

all licensees. The notice will be sent to other interested parties upon request.

L.

.p Callan Exec Ive Director for Operations

Enclosures:

As stated (4)

Comunissioners' comments or consent should be provided directly to the office of the Secretary by cob Friday. April 18, 1997.

Comunission Staf f of fice comuments, if any, should be submitted to the Commissioners NLT April 14, 1997, with an information copy to the office of the Secretary.

If the paper is af such a nature that it requires additional review and comment, the Cossaissioners and the Secretariat should be apprised of when comuments may be expected.

l-DISTRIBUTION:

Comunissioners oGC oCAA l

oIG l

oPA

(

oCA l

CIo CFo EDo l

SECY

,v-+

-v-

---~wa

-n-~


x

---+---

a-se=.e w

o d_4 o

-ws.a n--m-64-=/..m.--a

,.um. n.4,A_2sg,,,,__AssA_._E.ps__,,_.,,4mMm&

4=

6,- s A s & S ma.4mmaA&W.,W4maa-am,,k+n,,,Ame,.,a_,s,,B l

4 6

e i

(

a i

b i

i 4

0 e

ENCLOSUR.E 1 l

FEDERAL REGISTER NOTICE I

e 1

e 4

0

.2

..ms--,

.-w,-

e_w,.

_y-.-,,

7

_,w,-

-,,.,.s-

..,.y..-.,,_,_ -,, _ _,.,ep,ym,...

7.,.,

,.mw_,_,,,,,_.%_

i

[7590-01-P]

NUCLEAR REGULATORY COPMISSION 4

10 CFR Part 55 t

f RIN 3150-AF62

-Initial Licensed 0perator Examination Requirements 1

i AGENCYt Nuclear Regulatory Commission.

P ACTION: Proposed rule.

SulMARY: The Nuclear Regulatory Commission (NRC) is proposing to amend its l

regulations to require all nuclear power facility licensees to prepare, proctor, and grade the written examinations and prepare the operating tests that the NRC, currently uses to evaluate the competence of individuals applying for operator licenses at those plants. The proposed amendment would require the licensee to submit each examination and test for the NRC's review and l

approval and would preserve the NRC's authority to prepare the. examinations l

}

I and tests, as necessary, if it loses confidence'in a licensee's ability to l'

' prepare these examinations acceptably.

In addition, the NRC would periodically invoke this authority in order to maintain the proficiency of its own license examiners.

1 DATES: Submit comments by (Insert the date 75 days after publication in the e

Federal Register]. Comments received after this date will be considered if it is practical to do so, but the Cosnission is able to assure consideration only for comments received on or before this date.

!~

L

~

I

=

_ = _ = = -

=

1

4 ADDRESSES: ' Comments may be sent to: Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555. Attn: Docketing and Service 3 ranch.

Hand deliver comments-to 11545 Rockville Pike, Rockville, Maryland, between 7:30 an and 4:15 pm on Federal workdays.

For infomation on submitting comments electron.ically, see the ' discussion under Electronic Access in the 1

Supplementary Information section.

Single copies of this proposed rulemaking may be obtained by written requestortelefax((301)415-2260) from Harry S. Tovmassian, Office of Nuclear Regulatory Research, U.S. Nuclear Regulatory Commission, Washington DC 20555. Certain documents related to this rulemaking, including comments received, may be examined at the NRC Public. Document Room, 2120 L Street NW

~(LowerLevel), Washington,DC. These same documents may also be viewed and i

downloaded electronically via the Electronic Bulletin Board estabitshed by NRC for this rulemaking as indicated in the Supplementary Infomation section.

FOR FURTHER INFORMATION CONTACT: Harry S. Tovmassian, Office of Nuclear i

Regulatory Research, U.S'. Nuclear Regulatory Commission, Washington, DC 20555, j

1 telephone (301) 415-6231; e-mail hst9nrc. gov.

t SUPPLEMENTARY JNFORMATION:

Background

Section107oftheAtomicEnergyAct(AEA)of1954,asamended, requires the NRC to detemine the qualifications of individuals applying for an Loperator license, to prescribe uniform. conditions for licensing such 2-

- + + - -

--s-

d individuals, and to issue licenses as appropriate.

Pursuant to the AEA, f

10 CFR Part 55 requires applicants for operator licenses to pass an 1

examination that satisfies the basic content requirements specified in the regulation. Although neither the AEA nor Part 55 specifies who must prepare,-

proctor, or grade these examinations, the NRC has traditionally performed

-those tasks itself or through its contract examiners.

In accordance with f

10 CFR 170(1), NRC staff and contractual costs are recovered from facility i

4 licensees who receive examination services. The NRC and its contract 1

1 examiners have used the guidance in NUREG-1021, ' Operator Licensing i

Examination Standards for Power Reactors,' to prepare the initial operator licensing examinations. This document has been revised as experience has been acquired in preparing these examinations. 'The current version is designated I

Interin Revision 8.'

i The intended modifications to 10 CFR Part 55 would allow facility i

licensees to have greater participation in the initial operator licensing process and enable the NRC to eliminate contractor assistance in this area.

Between $3 million and $4 million in contractor support for the preparation l

and administration of the initial operator licensing examinations and for f

i On support of requalification program inspections would be eliminated.

l April 18, 1995, the Commission approved the NRC staff's proposal to initiate a transition process to revise the operator licensing program and directed the NRC staff to carefully consider experience from pilot examinations before fully implementing the changes. C'n August 15, 1995, the NRC staff issued

' Copies are available for inspection or copying for a fee from the NRC l

l Public Document Room at 2120 L Street NW., Washin ton, DC 20555; the PDR's 634-3273: fax (202) 634-l mailing address is Nail Stop LL-6; telephone (202 3343. -Interia; Revision 8 is also available for d wnloading from the Internet at'"http://www.nrc. gov."

3 1

=~

-,,-w

.,,-,,,,-4--

m.w-e,

,. -,., - -.s-w-w,-ww...,-gw-.-.-.-+%-,---..r,----e e,ow...w-*_

~

--<r-+.,-

v.,-s.

Generic letter (GL) 95-06, ' Changes in the Operator Licensing Program,

outlining the revised examination development process and soliciting volunteers to participate in pilot examinations to evaluate and refine the methodology.

Between October 1, 1995, and April 5, 1996, the NRC staff reviewed and approved 22 operator licensing examinations, including both the written examinations and the operating tests, prepared by facility licensees as pcrt of a pilot program. These examinations were prepared using the guidance in Revision 7 (Supplement 1) of NUREG-10218 and the additionti guidance in GL 95-06.'

These examinations were used to test 146 reactor operator (RO) and senior reactor operator (SRO) applicants.

The results of the pilot examinations were discussed in SECY-96-123,

" Proposed Changes to the NRC Operator Licensing Program," dated June 10, 1996.

Based on the results of the pilot program, the staff recomended that the Comission approve the implementation of the new examination process on a voluntary basis until rulemaking could be completed to require all power l

reactor facility licensees to prepare the entire initial examination for l

reactor operators and senior reactor operators and to proctor the written i

portion of the examination. On July 23, 1996, the Comission authorized the staff to continue the pilot examination process on a voluntary basis and requested the staff to develop a detailed rulemaking plan to justify the changes that may be necessary to 10 CFR Part 55. The Comission also directed the staff to address a number of additional items (e.g., pros, cons,-and l

' Copies are available for, inspection or copying for a fee from the NRC Public Document Room at 2120 L Street NW., Washington, DC 20555; the PDR's l

l mailing address is Mail Stop LL-6,; te, ephone (202) 634-3273; fax (202) 634-l 3343.

l 4

t l*

4 vulnerabilities) regarding the revised examination process to facilitate a i

Commission decision on whether to implement the revised process on an industry-wide basis.

On September 25, 1996, the staff forwarded the requested rulemaking plan f

and a response to the additional items to the Commission in SECY-96-206, "Rulemaking Plan For Amendments to 10 CFR Part 55 to Change Licensed Operator Examination Requirements." On December 17, 1996, the Comission directed the staff to proceed with the proposed rulemaking.

With Commission approval, the staff resumed conducting pilot-style examinations on August 19, 1996, and by the end of December 1996 had reviewed, approved, and administered 12 additional examinations that were developed by facility licensees based on the guidance in GL 95-06. Thi's raised the total number of examinations completed using the pilot process to 34 and the number of applicants tested to 84 R0s and 144 SR0s.

Discussion The pilot program demonstrated that the revised process, using licensee Comments from developed examinations, can be both effective and efficient.

the NRC staff and industry personnel who participated in the pilot examinations were generally favorable. The quality of the licensee-developed examinat' ions (as modified by the NRC) was generally comparable to the examinations prepared by the NRC staff or its contractors. All of the licensee-developed examinations required some modifications subsequent to NRC review; however, several of these examinations required significant rework, indicating that some licensees did not fully understand the criteria for 5

_.u

- i

e preparing examinations which meet NRC standards. With training and experience, it is expected that the industry would gain proficiency in preparing the examinations. The monitoring and assessment of this voluntary pilot program has demonstrated that facility licensee developed examinations, as modified by the NRC, are comparable in terms of their quality to those prepared by the NRC and its contract examiners under the existing process; therefore, the safe operation of the facility in question is in no way compromised. The fact that the pass / fail results on the 34 pilot examinations administered to the 84 R0s and 144 SR0s through the end of December 1996 were comparable to the power reactor licensing examination results during Fiscal Year 1995, when all the examinationr were prepared by the NRC or its contractors, supperts this conclusion. The provisions of the proposed rule in i 55.40(a)(2), which require NRC staff review and approval of facility licensee developed te.sts and examinations, should facilitate the monitoring of the quality of the submittals and the modification of those which do not meet NRC standards.

Availability of Guidance Document for License Examination Preparation Although 10 CFR Part 55 does not specify who will prepare, administer, and grade the written examinations and operating tests for reactor operator and senior reactor operator licenses, the NRC or its contract examiners have traditionally performed these tasks. As a consequence of performing the tasks associated with preparing and administering the initial licensing examinations, the NRC has developed a substantial body of guidance, which has been, published in various versions of NUREG-1021 to aid both NRC and its 6

contract examiners. The latest version of NUREG-1021 (Interim Revision 8) incorporates the pilot exarination criteria in GL 95-06, lessons learned during the pilot examinations, an'd a number of refinements prompted by the comments submitted in response to the federal Register notice dated February 22,1996 (61 FR 6869), which solicited public comments on the proposed NUREG changes. A copy of Interim Revision 8 of NUREG-1021 has been mailed to each facility licensee. Copies may be inspected and/or copied for a fee at the NRC's Public Document Room, 2120 L Street NW (Lower Level),

Washington, DC. NUREG-1021 is also electronically available for downloading from the 1.2ternet at "http://www.nrc. gov." All interested parties are invited to comment on Interim Revision 8 of NUREG-1021 in addition to the proposed rule. These public comments will be addressed, and Revision 8 will be published as a final NUREG document.

The NRC plans to prepare, administer, and grade initial operator licensing examinations at least four times per year, using NUREG-1021 as guidance.

Licensees would also be expected to use the guidance contained in i

NUREG-1021 to prepare the licensing examinations. The NRC staff would review and approve any deviations from this guidance. The NRC will not approve any deviation that would compromise its statutory responsibility of prescribing uniform conditions for.the operator licensing examinations.

Examples of unacceptable deviations include, but are not limited to, the use of essay questions in place of multiple choice questions and the administration of open book examinations.

7 O

m v w w

--,,.a

-,v.

-,,-e,--v

,e-

,,e---

,,wI-w w

-e m-

--*-,-w

Proposed Rule This proposed regulation would add a new section, 5 55.40, f

Implementation," to Subpart' E of 10 CFR Part 55 which would require power reactor facility licenstes to prepare the written examinations and operating tests, to submit them to the NRC for review and approval, and to proctor and grade the written examinations. These requirements would be contained in il 55.40(a)(1), (2), and (3), respectively.-

Each power reactor facility licensee would be required to prepare and submit the proposed examinations (including the written examination, the walk-through, and the dynamic simulator tests) to the NRC consistent with the guidance contained in NUREG-1021. The NRC staff would review the entire examination and direct whatever changes are necessary to ensure that adequate levels of _ quality, difficulty, and consistency are maintained._ Af ter the NRC staff reviews and approves an examination, the facility licensee would proctor t

The and grade the written portion consistent with the guidance in NUREG-1021.

4 NRC staff would continue to independently administer and grade the operating

- tests, review and approve the written examination results, and make the final licensing decisions. The facility licensee would not conduct parallel t

operator evaluations during the dynamic simulator or the walk-through' tests.

Pursuant to proposed requirements in i 55.40(b), the NRC staff would maintain the authority to prepare the examinations and tests and to proctor and grade the site-specific written examinations. This proposed rule would allow NRC-to maintain _its-staff capability to perform these activities. Also,

[

if the NRC has reason to question a licensee's ability to prepare an v

8 4.i..

4

~,..-,o

,_.4E1.---

,,,-,,,-e,.---.m--r-.

,. ~..,---.,c.

,.yt.y

,n.

.. - m 2

l j

acceptable examination, 6 55.40 (b) provides the NRC authority to prepare and administer the examinations and tests.

J Paragraph (c) of 6 55.40 reasserts that the NRC would continue to prepare and administer the written examinations and operating tests at non-power reactor facilities.

The NRC has taken this position because the non-power reactor community does not have an accreditation process for training and qualification or the resources to prepare the examinations.

However, the process will be implemented using only NRC examiners, thereby allowing the elimination of all routine contract assistance in that area.

Electronic Access Comments may be submitted electronically, in either ASCll text or Wordperfect format (version 5.1 or later), by calling the NRC Electronic Bulletin Board (BBS) on FedWorld. The bulletin board may be accessed using a personal computer, a modem, and one of the commonly available communications software packages, or directly via Internet.

Background documents on the rulemaking are also available~, as practical, for downloading and viewing on the bulletin board.

If using a personal computer and modem, the NRC rulemaking subsystem on fedWorld can be accessed directly by dialing the toll free number (800) 303-9672.

Communication software parameters should be set as follows:

parity to none, data bits to 8, and stop bits to 1 (N,8,1). Using ANSI or VT-100 terminal emulation, the NRC rulemaking subsystem can then be accessed by selecting the " Rules Menu" option from the "NRC Main Menu." Users will find the "fedWorld Online User's Guides" particularly helpful. Many NRC subsystems 9

m. _ _ _ _ _

and data bases also have a " Help /Information Center" option that is tailored i

to the particular subsystem.

The NRC subsystem on FedWorld can also be accessed by a direct dial phone number for the main FedWorld 885, (703) 321-3339,'or by using Telnet via.

Internet: fedworld. gov.

If using (703) 321-3339 to contact fedWorld, the NRC subsystem will be accessed from the main FedWorld menu by selecting the

" Regulatory, Government Administration and State Systems," then selecting

" Regulatory Information Mall." -At that point, a menu will be displayed that has an option "U.S. Nuclear Regulatory Commission" that will take you to the NRC Online main menu. The NRC Online area also can be accessed directly by typing */go nrc" at a FedWorld conmand line., If you access NRC from FedWorld's main menu, you may return to FedWorld by selecting the " Return to FedWorld" option from the NRC Online Main Menu. However, if you access NRC at FedWorld by using NRC's toll-free number, you will have full access to all NRC systems, but you will not have access to the main FedWorld system.

if you contact FedWorld using Telnet, you will see the NRC area and menus, including the Rules Menu. Although you will be able to download documents and leave messages, you will not be able to write comments or upload files (comments).

If you contact FedWorld using FTP, all files can be accessed and downloaded but uploids are not allowed; all you will see is a list of files without descriptions (normal Gopher look). An index file listing all files within a subdirectory, with descriptions, is available.

There is a 15-minute time limit for FTP access.

Although FedWorld also can be accessed through the World Wide Web, like FTP that mode only provides access for downloading files and does not display the NRC Rules Menu.

10

For more information on NRC bulletin boards call Mr. Arthur Davis, j

Systems Integration and Development Branch, NRC, Washington, DC 20555, telephone (301) 415-5780; e-mati axd39nrc. gov.

I Environmental Impact: Categorical Exclusion l

The NRC has determined that this proposed rule is the type of action described as a categorical exclusion in 10 CFR 51.22(c)(1).

Therefore, neither an environmental impact statement nor an environmental assessment has been prepared for this proposed regulation.

Paperwork Reduction Act Statement 4

This proposed rule amends information collection requirements that are subject to the Paperwork Reduction Act of 1995(44U.S.C.3501etseq). This j

rule has been submitted to the Office of Management and Budget for review and approval of the information collection requirements.

The public reporting burden for this' collection of information is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information (i.e.,

preparing the examinations). The U. S. Nuclear Regulatory Commission h seeking public comment on the potential impact of the collection of

- information contained in the proposed rule and on the following issuas:

11 I

- ~...

_ = _ - - _ _ - -

l 1.

Is the proposed collection of information necessary for the proper performance of the functions of the NRC, including whetther the information will have practical utility?

2.

Is the estimate of burden accurate?

3.

Is there a way to enhance the quality, utility, and clarity of the information to be collected?

4.

How can the burden of the collection of information be minimized, including the use of aut.omated collection techniques?

Send coments on any aspect. of this proposed collectiem of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6F-33), U.S. Nuclear Regulatory Comission, Washington, DC 20555-0001, or by Internet electronic mail at bjs19nrc. gov; and to the Desk Officer, Office of Inform 1 tion and Regulatory Affairs, NE08-10202 (3150-0018,and3150-0101), Office of Management and Budget, Washington, DC 20503.

Coments to OMB on the co11setions of information or on the above issues should be submitted by [ insert date 30 days after publication 4. the federal Register).

Coments received after this date will be considered if it is practical to do so, but assurance of consideration cannot be given to coments received after this date.

12

Public Protection Notification j

i The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of Information unless it displays a currently valid OMB control number.

I Regulatory Analysis The Comission has prepared a draft regulatory analysis on this proposed regulation. - The analysis examines the costs and benefits of the alternatives considered by the Comission.

The draft analysis is available for inspection in the NRC Public Document Room, 2120 L Street NW (Lower Level), Washington, DC.

Single copies of the analysis may be obtained from Harry S. Tovmassian at (301) 415-6231.

The Commission requests public coment on the draft regulatory analysis.

Connents on the draft analysis may be submitted to the NRC as indicated under the ADDRESSES heading.

Regulatory Flexibility certification in accordance with the Regulatory Flexibility Act of 1980, (5 U.S.C.

605(b)), the Commission certifies that this rule will not, if promulgated, have a significant economic impact on a substantial number of small entities.

This proposed rule affects only the licensing and operation of nuclear power plants. The companies that own these plants do not fall within the scope of the definition of "small entities" set forth in the Regulatory Flexibility Act 13 4

-m y,-

..,w,-

e.v.

nwm. - - -

.-w y-...

,-.-w,

- - ~,.

~

m

or the Small Business Size Standards set out in regulations issued by the Small Business Administration at 13 CFR Part 121.

Backfit Analysis The Commission has concluded that requiring the facility licensees to prepare the initial operator licensing examinations is not a backfit pursuant to 10 CFR 50.109.

The proposed change does not result in a modification of or an addition to systems, structures, components, or the design of a facility. The change does not affect the design approval or manufacturing license for a facility.

The procedures required to design or operate a facility would not be affected by the proposed change.

The proposed change would require each nuclear power plant licensee to develop the tests that are used to qualify, in accordance with the requirements of 10 CFR Part 55, those nuclear power plant operators whom the nuclear power plant licensee wishes to employ.

Development of such tests are not considered to be " procedures... required to... operate a facility." Any procedure necessary to develop the test would not be useful in actually " operating" the facility, even if one broadly interprets " operating" as including any action.necessary to comply with the Commission's regulations with respect to operation. The organization required to design or operate a facility would not be affected because all facility licensees already have a training staff to train and evaluate applicants for operator licenses and to train other members of the plant staff, as required by 10 CFR Part 55 and by

-10 CFR 50.120.

9 14 G

_m_--

)

List of Subjects in 10 CFR Part 55 Criminal penalties, Mar. power training programs, Nuclear power plants and reactors, Reporting and recordkeeping requirements.

For the reasons set out in the preamble and under the authority of the Atomic Energy Act of 1954, as amended; the Energy Reorganization Act of 1974, as amended; and 5 U.S.C. 553; the NRC proposes to adopt the following amendments to 10 CFR Part 55.

PART 55--OPERATOR'S LICENSES 1.

The authority citation for Part 55 continues to read as follows:

AUTHORITY: Secs. 107, 161, 182, 68 Stat. 939, 948, 953, as amended, sec. 234, 83 Stat. 444, as amended (42 U.S.C. 2137, 2201, 2232, 2282),; secs, 201, as amended, 202, 88 Stat. 1242, as amended, 1244 (42 U.S.C. 5841, 5842).

s Sections 55.41, 55.43, 55.45, and 55.59 also issued under sec. 306, Pub.

L.97-425, 96 Stat. 2262 (42 U.S.C.10226). Section 55.61 also issued under secs. 186, 187, 68 Stat. 955 (42 U.S.C. 2236, 2237).

s 2.

In i S5.8 paragraph (b) is revised to read as follows:

i 55.8 Information Collection Reauirements: OM8 Approval.

(b) The approved information collection requirements contained in this part appear in il 55.40, 55.45, 55.53, and 55.59.

15

3.

A new i 55.40 is added to read as follows:

E 55.40 lmolement ation.

(a)

Power reactor facility licensees shall --

(1) Prepare the required site-specific written examinations and operating tests; (2)

Submit the written examinations and operating tests to the Comission for review and approval; and (3) Proctor and grade the NRC-approved site-specific written examinations.

(b)

In lieu of requiring a specific power reactor facility licensee to prepare the examinations and tests or to proctor and grade the site-specific written examinations, the Comission may elect to perform those tasks.

(c) The Comission will prepare and administer the written examinations and operating tests at non-power reactor facilities.

Dated at Rockville. Maryland, this day of

, 1997.

For the Nuclear Regulatory Comission.

John C. Hoyle, Secretary of the Comission.

16

k e

9 e

a G

ENCLOSURE 2 9

REGULATORY ANALYSIS

' )

e e

1 PROPOSED REGULATORY ANALYSIS FOR PULEMAKING ON REQUIREMENTS FOR INITIAL LICENSED OPERATOR EXAMINATIONS 1.

Statement of Problem and Objective Section 107 of the Atomic Energy Act of 1954 (AEA), as amended, requires the NRC to determine the qualifications of individuals applying for an operator license, to prescribe uniform conditions for licensing such individuals, and to issue licenses as appropriate.

To implement this statutory" mandate, operator license applicants are required by 10 CFR Part 55. Operators' Licenses " to pass a written examination and an operating test. The written examination must satisfy the basic content requirements that are specified in the regulation.

Although neither the AEA nor Part 55 specifies who must prepare, administer, or grade these examinations, the NRC has traditionally performed those tasks itself or Because this has been a costly process through its contract examiners.

in terms of NRC staff manpower and contractual support, the NRC staff has evaluated an alternative approach which would require nuclear power plant licensecs to prepare the examinations and submit them to the NRC for review and approval. This approach has been tested and assessed through a voluntar'y pilot program and has been deemed by the NRC staff to be feasible. The monitoring and assessment of this voluntary pilot program has demonstrated that facility licensee prepared examinations, as modified by the NRC. are comparable in terms of their quality to those prepared by the NRC and its contrac* examiners under the existing process, therefore. the safe operation of the facility in question is Thus, the NRC is proposing to amend 10 CFR Part 55 to not compromised.

require nuclear power plant licensees to prepare these examinations and has published Interim Revision 8 of NUREG-1021, ' Operator Licensing Examination Standards for Power Reactors," as guidance.

This proposed action would eliminate the need for $3 million to $4 million in contractual support to the NRC. The FY 1997 and FY 1998 budget request is consistent with this proposal and reflects the elimination of contract support for the operator licensing program.

The NRC staff's primary objective in shifting responsibility for preparing the initial operator licensing examinations to the power reactor facility licensees is to reduce the amount of NRC resources used in this area.

This change in policy is part of the NRC's continuing effort to streamline the functions of the Federal Government consistent with the Administration's initiatives and to accommodate NRC resource reductions.

Pursuant to the provisions of the AEA, the NRC will ensure that the quality of the operator licensing examinations, and the effectiveness of the operator licensing program are maintained. These changes are not intended to affect the format content, length, and level of difficulty of the examinations, thereby minimizing the impact,

of the rule change on the operato,r license applicants.

1

===2.

Background===

10 CFR 55.31(a)(3) requires the applicant for an operator's license to submit a written request from an authorized representative of the facility licensee that the written examination and the operating test be administered to the applicant.

Furthermore. 10 CFR 55.33(a)(2) states that the Commission will approve an initial application for a license if it finds that the applicant has passed the requisite written examination and operating test in accordance with il 55.41 and 55.45 or 55.43 and 55.45. These written examinations and o>erating tests determine whether the applicant for an operator's license las learned to operate a facility competently and safely, and additionally, in the case of a senior operator, whether the applicant has learned to direct the licensed activities of licensed operators competently and safely.

As stated above, the NRC or its contract examiners have traditionally prepared, administered, and graded the written examinations and operating tests. In recent years, the NRC has spent between $3 million and $4 million per year to retain contractor support for the 03erator licensing program.

In accordance with 10 CFR 170.12(1), the NRC' staff and contractual costs are recovered from the facility licensees that receive examination services.

The proposed rule would change the current practice in which the NRC prepares and proctors the initial examination for reactor operators and senior reactor operators and, instead, would require each power reactor facility licensee to prepare the entire examination and proctor the written portion of the initial examination. This action does not constitute a backfit pursu3nt to 10 CFR 50.109.

3.

Identification and Preliminary Analysis of Alternative Approaches 3.1 Alternative 1 Take No Action As discussed in SECY-96 206, the proposed change would allow the NRC staff to eliminate between $3 million and $4 million in contractor support for examination preparation and administration and for insoection support. The budget request for Fiscal Years (FYs) 1997 and 1993 is consistent with this proposal and reflects the current reduction (due to savings made possible by the ongoing pilot program) and eventual elimination of contract sup) ort.

If the Comission decides not to amend 10 CFR Part 55 as proposed )y the NRC staff, it would require agency resources to be reprogrammed to increase the contract support for the operator licensing program or the direct examiner resources in each regional office to satisfy the demand for initial licensing examinations and to conduct the licensed operator requalification inspections.

2

3.2 Alternative 2 Provide Regulatory Guidance This alternative was rejected because the NRC staf f considers implementation of the new process on a voluntary basis alone unworkable over the long term.

If the NRC does not require facility licensees to prepare the initial operator licensing examinations, there would be no guarantee that each licensee would elect to prepare these examinations.

With the elimination of contractor support and the increased uncertainty 3

about examinatioh quality, the NRC staff may no longer have sufficient g;

examiner resources to prepare examinations consistent with the

}

scheduling needs of facility licensees. This resource problem is fu de compounded by the unpredictable nature of the examination workl e and by other unanticipated demands on the examiner work force, such as the increase in the number of examination appeals during the pilot examin.ition program.

/

3.3 Alteuative 3 Asend 10 CFR Part 55 This alternative would require every power reactor u cility licensee to preparc +.he initial operator licensing cxaminations and to proctor the e4 written portion of the examination. This would enable the NRC to eliminate the use of contractors in the operator licensing program (with the exception of the generic fundamentals examinations) and result in an estimated savings of $3 million to $4 million per year. Under this alternative, the NRC staff would undertake other tasks that are currently performed by contractors, including examination administration and inspections of licensee administration of requalification programs.

4.

Regulatory Impact - Qualitative Costs and Benefits Facility Licensees The NRC currently depcods on NRC employees and contractors to prepare and administer the initial operater m;enting examinations required by 10 CFR Part 55.

NRC contractors also assist in the inspection of facility licensee administration of requalification examinations.

In accordance with 10 CFR 170.12(1). the cost of NRC time spent end any related contractual costs art billed directly to the facility licenscas that receive the examination services.

Under the proposed change, each power reactor facility licensee would assume responsibility for preparing the site-specific initial o]erator licensing examinations at its facilities, thereby allowing the 4RC to discontinue the use of contract erwiners for that purpose.

Facility licensees would bc expected to prepare and submit proposed examinations (including the written examination, the walk-through, and the dynamic simulator tests) to the NRC based on the guidance contained in NUREG-1021.

The training staffs at power reactor facilities already have the basic knowledge, skills, and abilities necessary to evaluate operator performance and develop test nems for the initial licensing 3

i

examination.

During the mid-to-late-1980s, the industry's emphasis in the training area increased significantly. All power reactor licensees established formal training programs that were based on a systems approach to training (SAT) and accredited by the National Academy for Nuclear Training.

Pursuant to 10 CFR 50.120 and 55.4. SAi-based training programs must include the evaluation of the trainee's mastery NRC ins)ections of licensee requalification of training objectives.

programs for licensed operators lave also found that training staffs generally possess the skills need7 to evaluate the trainee's knowledge.

1 The NRC would review and approve the facility prepared examinatior.3 consistent with the guidance provided in NUREG 1021. However, the NRC will not approve any examination which would have the effect of compromising its statutory responsibility of prescribing uniform conditions for these examinations.

Examples of unacceptable deviations include, but may not be limited to, the use of essay questions in lieu of multiple c.hoice end the administration of open-rather than closed-After the NRC reviews and a> proves an examination.

book examinations.

the facility licensee would proctor and grade t1e written portion based on the guidance contained in NUREG-1021. The NRC staff will continue to administer and gr ade the operating tests, review and approve the written examination results recomended by the facility licensee, and make the final licensing decisions, Feedback from the pilot examination program indicates that the average,

time spent by a facility licensee to prepare the written examination and o)erating tests was a) proximately 600 to 800 staff-hours.

A portion of tlat time (about 2001ours) would have been spent reviewing and assisting with the administration of NRC-developed examinations undr The the process now in place and should be subtracted from the total.

resulting average burden of a> proximately 400 to 600 staff-hours was somewhat higher than the 400 lours that NRC staff or its contract s

examiners typically take to prepare an examination. The extra burden is generally attributable to the facility licensees' lack of familiarity with specific NRC examination ex>ectations and to the additional administrative requirements, suc1 as documenting the source of the examination questions, that are required to maintain examination integrny.

It should be noted that some of the facility licensees that participated in the pilot program ex> ended less time than is comonly used by NRC contractors to prepare tie examinations.

Furthermore, in a few cases the examinations that facility licensees submitted for review and approval were. in the judgment of NRC chief examiners, as good as or better than those prepared by an NRC contractor.

The NRC staff expects that most fa:ility licensees will eventually be able to prepare quality examinations in less time than the NRC or a contractor because the facility employees have more detailed knowledge of their facility and easier access to the refererr.e materials required to prepare the examinations.

The fact that contract examiners will not b used by the NRC in the revised examination process will eliminate thc need for duplicate sets of reference materials to be provided to the NRC staff and to its 4

Feedback from the industry in contractors by facility licensees.

response to the NRC staff's solicitation of public comments on the draft revision of NUREG-1021 indicated that facility licensees had been spending an additional 80 to 160 hours0.00185 days <br />0.0444 hours <br />2.645503e-4 weeks <br />6.088e-5 months <br /> to prepare and ship the reference Under the. proposed materials under the existing examination process.

process. the facility licensee would generally submit only materials which are needed to verify the accuracy of the examination questions.

This is considered to be a significant reduction but has not been quanttfied in this analysis.

The additional burden of having to prepare the site-specific initial operator licensing examinations is expected to be offset by reductions in 10 CFR Part 55 review fees billed to the facility licensees pursuant Each facility licensee would be billed only for to 10 CFR 170.12(1).

the time that the NRC staff spends to review the examination prepared by the facility licensee and to rework the examination, as necessary. to Although several of the draft pilot bring it up to NRC standards.

examinations were of poor quality and took the NRC staff more time than expected to review and rework. the staff believes that additional cost reductions would be realized as facility licensees gain experience with the NRC examination requirements and the quality of the facility developed examinations improves.

This rule change would give facility licensees more control over the cost 01 their examination services because they would be in a position The to manage the quality of the prodt.ct that is submitted to the NRC.

higher the quality of the examination that the facility licensee submits, the lower the resulting charges.

Under the existing examination process, facility licensees are responsible for the entire cust of preparing the examination. even if the NRC contractor's submittal is of poor quality and requires significant rework by the NRC staff before it can be administered.

Facility licensees would have the option of retaining the services of a contractor to prepare the license examination as the NRC often does' under the current examination arocess. The NRC staff understands that NRC's examination contractors lave expressed an interest in providing their services directly to facility licensees.

In suninary, the present system for developing licensing examinations

-elies primarily on NRC contractors to develop the examinations, with These particular examinations the cost then billed to the licensees.

are highly plant-specific. requiring time for familiarization with plant procedures and equipment. and for the collection and transfer of information (library of procedures and documents) to enable this process Hence, to appropriately prepare and administer the to occur.

examinations, the'NRC staff and contmctors must learn the details of the operation of each specific plant.

In effect, this necessitates that the examining staff duplicate expertise already resident et each site Clearly, efficiency could be gained simply to prepare the examinations.

5 if the NRC efforts were focused on the appropriate scope and depth of the examinations, leaving the preparation of the detailed material to 5-

\\

l The proposed rule would eliminate these inefficiencies by l

the licensee.

placing the responsibility for preparing the examinations upon each licensee. Licensees would still have the option of using contractor assistance in preparing the examinations. There may be an initial period of inefficiency while licensees learn.the process for )reparing these er.aminations. However, this period is expected to be s1 ort as the practice of relying c;1 licensee personnel or their contractors to prep 6re this highly technical, plant-specific examination becomes

routine, it is expected that with experience the facility licensee would be preparing cuality examinations requiring less NRC review resources to be usec with a larger potential savings to the licensee.

An accurate cost savings to the industry is difficult to quantify because the NRC does not have a basis to estimate the magnitude of the efficiencies that might be gained by having the licensee and/or its contractors prepare the examinations. However if it is assumed that the facility licensees can pr pare the examinations in the same amount of time that the NRC currenti allots its contract examiners to perform the task (i.e., approximatel 400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />) and that the time would be equally distributed between contractors and the licensee's own in-house staff at an incremental cost of $120 per hour and 160 per hour, respectively, it would translate into an annual industry burden of $2.16 This would be roughly the million, assuming 60 examinations per year.

same cost if the NRC were to prepare the examinations relying equally on in-house and contractor staff efforts. Assuming that the facility licensees will be able to avail themselves of the aforementioned efficiencies and that a 10% reduction in thc burden is attained, there would be a small industry-wide savings of about $0.22 million per year.

The staff also anticipates that a small savings may accrue because of the reduced need for the facility licensee to prepare and ship a large amount of reference materials to the NRC to enable the Commission and/or its contractors to prepare the examinations.

Ooerator License Acolicants The format. content. length, and level of difficulty of the examinations would remain unchanged, thereby minimizing the impact of the rule change on the operator license applicants.

NRC examiners would continue to review and approve every written examination and operating test before it is administered. The examiners would work with the facility licensee's staff to modify the submitted examinations, as necessary, based on the guidance contained in NUREG-1021 in order to maintain consistency with prior licensing examinations at both that facility as well as among all other facilities.

If the NRC decides to preaare the examination in lieu of accepting an examination prepared by t1e facility licensee, the NRC examiners would use the snie procedures and guidance (i.e., NUREG-1021) that the facility licensee would have used to prepare the examinatice..

I NRC Staff As noted in SECY-96-123. the NRC examiners required an average of about 350 hours0.00405 days <br />0.0972 hours <br />5.787037e-4 weeks <br />1.33175e-4 months <br /> to review, prepare for, administer, grade, and document each of the 22 pilot examinations. Assuming the same resource utilization rate and a stable examination workload, the NRC staff should be able to implement the new examination process and the requalification inspection program at all power reactor facilities with the same level of direct NRC resources as is currently allotted to the operator licensing program; no contractor support should be required (with the exception of the generic fundamentals examinations).

The variable nature of the examination workload was evident during the pilot examination program, when the number of examination appeals increased unexpectedly, thereby placing a significant burden on the examiner work force to review and resolve the applica!ts' concerns.

Gefore starting the pilot examination transition process, the examiners

  • workload was shared approximately equally between the NRC staff and its contractors. Therefore, discontinuance of operator licensing contracts could limit the NRC staff's ability to assign personnel to meet peaks in facility licensee requests for examinations. The impact of the loss of examiners due to reassignments. transfers, promotions and other personnel actions will have a greater impact without the contract examiners available to offset the loss.

Furthermore, if the quality of an exam: nation prepared by a facility licensee is significantly deficient it will be difficult to predict the amount of time necessary to' review or modify the examination so that it meets NRC standards.

This was the case with several of the pilot examinations, and the staff s

expects that this problem may ex)and as more facility-prepared examinations are submitted for NRC review. This uncertainty in the examination review process could increase the risk of broken examination comitments.

To address this issue, the NRC plans to have a larger pool of examiners available at each regional office. The exact number of examiners has not yet been determined and will vary from region to region depending on the number and major type of reactors involved.

However, it is 3

anticipated that an approximate increase of 10-20 percent in the number of examiners may be necessary. This would be accomplished by training other staff members performing inspection activities to also be qualified as examiners. As mentioned above although the overall expenditure of NRC resources in this area should remain about the same, having additional qualified examiners would help to alleviate peaks in scheduling.

This rulemaking is expected to take approximately 0.5 NRC staff years to complete and needs no contractor 1upport.

5.

Decision Rationale The proposed amendments to 10 CFR Part 55 would require power reactor facility licensees to prepare the entire initial operator licensing 7

examinations and proctor and grsde the written portion of the examinations. The qualitative assessment of costs and benefits

' discussed above, leads the NRC to the conclusion that the overall impact.

of the rulemaking would not significantly increase licensee costs and-could result in a savings -to licensees over time as they become more familiar with the NRC examination guidelines. The imrovements in efficiency would be primarily due to the facility employees' better understanding of the plant design and operating characteristics and their reedy access to the reference materials required to prepare and validate the examinations.

Based on the fact that this action has the potential-to provide a cost savings to facility licensees as they become proficient in preparing the examinations, has negligible impact upon o>erator license applicants, provides a substantial cost savings to the NRC. and has no effect on safety. Alternative 3 has been selected as the preferred alternative.

6.

Implementation 6.1 Schedule No implementation problems are expected. No effect on other schedules is anticipated, l

)

1 l

8

i........

i O

t 4

4 8

ENCLOSURE 3 CONGRESSIONAL LETTERS 6

C e

i '

+

1

88*og I

UNITED STATES

[

]

NUCLEAR REGULATORY COMMISSION wAsm woTou,o.c.su m m g

The Honorable Dan Schaefer, Chairman Subcommittee on Energy and Power Committee on Commerce United States House of Representatives Washington, DC 20515

Dear Mr. Chairiiian:

The NRC has sent the enclosed proposed amendments to the Commission's rules in This

'10 CFR Part 55 to the Office of the Federal Register for publication.

rulemaking, if promulgated, would require facility licensees to prepare the entire initial examination for reactor operators and senior reactor operators and to proctor and grade the written portion of the examination.

Facility licensees would be required to submit the examinations and tests to the NRC for review and approval. This rulemaking would preserve the NRC's authority Historically, the NRC

~to prepare the examinations and tests, as necessary.

has spent between $3 million and $4 million annually on contractor support for the operator licensing program.

Section 107 of the Atomic Energy Act of 1954 (AEA), as amended, requires the NRC to detaintne the qualifications of individuals. applying for an operator license, to prescribe uniform conditions for licensing such individuals, and to issue licenses as appropriate. Operator license applicants are required by 10 CFR Part 55, " Operators' Licenses," to pass an examination satisfying the basic content requirements that are also specified in the regulation.

Although the AEA is not. specific as to who will prepare and administer the examination, the NRC has traditionally performed these functions through its staff or contract examiners..

Sincerely, Dennis K. Rathbun, Director Office of Congressional Affairs

Enclosure:

Fedetsi Register Notice cc: Representative Ralph Hall 4

e

_._.-____m_____

^

l 1

The Hxorable Dan Schaefer, Chairman Subcowalttee on Energy and Power Committee on Commerce United States House of Representatives Washington, DC 20515

Dear Mr,

Chairman:

The NRC has sent the enclosed proposed amendments to the Commission's rules in 10 CFR Part 55 to the Office of the Federal Register for publication. This rulemaking,' if promulgated, would require facility licensees to prepare the entire initial examinatica for reactor operators and senior reactor operators and to proctor and grade the written portion of the examination.

Facility licensees would be required to submit the examinations and tests to the NRC for review and approval. This rulemaking would preserve the NRC's authority to prepare the examinations and tests, as necessary. Historically, the NRC has spent between $3 million and $4 million annually on contractor support for the operator licensing program.

Section 107 of the Atomic Energy Act of 1954 (AEA), as amended, requires the NRC to determine the qualifications of individuals applying for an operator license, to prescribe uniform conditions for licensing such individuals, and to issue licenses as appropriate. Operator license applicants are required by 10 CFR Part 55, " Operators' Licenses," to pass an examination sub sfying the basic content requirements that are also specified in the regulation.

Although the AEA is not specific as to who will prepare and administer the examination, the NRC has traditionally performed these functions through its staff or contract examiners.

Sincerely, Dennis K. Rathbun, Director-Office of Congressional Affairs

Enclosure:

Federal Register Notice cc:

Representative Ralph Hall Distribution:

RDB/Rdg/Subj/ central, RAuluck, EDO R/F DOCUMENT NAME:[0:\\TOVMASSl\\lL0E\\ CONGRESS \\LOE) n h.

,.s m. 4 w

h e 6.m c. c.,,.m.ui.u h nu.new.

r - co, wein.ti h ni/.nci.

n. w...,y s % -

n.

OFFICE RDB:DRA*

RDB:DRA*

D:DRA*

OCA l

NAME HTovmassian TMartin BMorris DKRathbun DATE 02/05/97 02/05/97 02/28/97

/ /97 0FFICIAL RECORD COPY (RES File Code) RES

sm ase

\\

UNITED STATES

)

.t

{

P; NUCLEAR REGULATORY COMMISSION WAaHINGToN, D.C. 3000Hett I

.o i

The Honorable James M. Inhofe, Chairman Subcommittee on Clean Air, Wetlands, Private Property and Nuclear Safety Committee on Environment and Public Works United States Senate Washington, DC 20510

Dear Mr. Chairman:

The NRC lias sent the enclosed pro)osed amendments to the Commission's rules in 10 CFp Part 55 to the Office of tie Federal Register for publication. This rulemaking, if promulgated, would require facility licensees to prepare the entire initial examination for reactor operators and senior reactor operators and to proctor and grade the written portion of the examination.

Facility licensees would be required to submit the examinations and tests to the NRC for review and approval. This rulemaking would preserve the NRC's authority to prepare the examinations and tests, as necessary. Historically, the NRC has spent between $3 million and $4 million annually on contractor support for the operator licensing program.

Section 107 of the Atomic Energy Act of 1954 (AEA), as amended, requires the NRC to determine the qualifications of individuals applying for an operator license, to prescribe uniform conditions for licensing such individuals, and to issue licenses cs appropriate. Operator license applicants are required by 10 CFR Part 55, Operators' Licenses," to pass an examination satisfying the basic content requirements that are also specified in the regulation.

Although the AEA is not specific as to who will prepare and administer the examination, the NRC has traditionally performed these functions through its staff or contract examiners.

Sincerely, Dennis K. Rathbun, Director Office of Congressional Affairs Enc'losure:

Federal Register Notice cc: Senator Bob Graham


._.~.______m._.__

The' Honorable James M.'Inhofe, Chairman

~ Subcommittee on Clean Air, Wetlands, Private-Property and Nuclear Safety Committee on Environment and Public Works United States Senate Washington, DC 20510

Dear Mr. Chaiman:

The'NRC has sent the enclosed preposed amendments to the Commission's rules In i

- 10 CFR Part 55 to the Office of the Federal Register for publication. This E

- rulemaking, if promulgated, would require facility licensees-to prepare the i

i entire inttial examination for reactor operators and senior reactor operators and to proctor and grade the written portion of the examinatita.

Facility licensees would bi required to submit the examinations and tests to the NRC for review:and approval. -This rulemaking_would preserve the NPC's authority to prepare the examinations and tests, as necessary. Historically, the NRC-has spent between $3 million and $4 million annually on contractor support for the operator licensing program.

- Section107oftheAtomicEnergyActof1954(AEA),asamended,requiresthe NRC to determine the qualifications of individuals applying for an operator license, to prescribe uniform conditions for licensing such individuals, and to issue licenses as appropriate. Operator _ license applicants are required by 10 CFR Part 55, ~" Operators' Licenses," to pass an examination satisfying the basic content requirements that are also specified in the regulation.

Although the AEA is not specific as to who will prepare and administer the examination, 'the NRC has traditionally performed these functions through its

[

staff or contract examiners.

4 Sincerely, f

a Dennis K. Rathbun, Director Office of Congressional Affairs

Enclosure:

Federal Register Notice

- cc:

Senator Bob Graham i -

Distributioni RDB/Rdg/Subj/ central, RAuluck, EDO R/F

- D0CLMENT NAME:[0:\\TOVMASSI\\IL0E\\ CONGRESS \\L0E)

. 72

h..m.eem - me mm. wi c.cm m.m.n e nu.a.m r -c y m.a nu.a.a m.w.

y s*_

0FFICE RDB:DRA*

RDB:DRK.*

I-D:DRA*

OCA l

NAME HTovmassian TMartin.

BMorris DKRathbun DATE 02/05/97:

02/05/97 02/28/97

/ /97 0FFICIA. RECORD COPY (RES File Code) RES' m

.- -, ~

w e

--v-

e 4

i i

e-e a

ki 4

ENCLOSURE 4 PUBLIC ANNOUNCEMENT s

a

COMISSION PUBLISHES PROPOSED RULE FOR UTILITY ROLE i

IN INITIAL REACTOR OPERATOR LICENSE EXAMINATIONS The Nuclear Regulatory Commission has published a proposed rule in the Federal Reaister which would require that all nuclear power plant licensees prepare, proctor, and grade their initial written reactor operator license examinations and prepare their operating tests subject to NRC approval. Until a final rule is adopted, applicants for operator licenses will continue to be examined by using either NRC-prepared tests or those prepared by utilities participating voluntarily in an NRC-supervised pilot program begun in 1995.

Reactor operator applicants seeking a license to manipulate the controls of a nuclear power plant must pass both a comprehensive, site-specific multiple-choice, written examination and a practical, hands-on operating test.

The generic fundamentals examination, a separate written test that each applicant must pass to be considered for the site-specific license examination, will continue to to written and administered by the NRC.

All examinations drafted by utilities would be subject to review, modification, and approval by NRC examiners before the tests are given.

If the submitted test or examination fails to meet NRC's qualit! dandards, the NRC would have the option of preparing the test or examination in lieu of accepting or modifying one prepared by a utility. The NRC will continue to administer and grade the operating portion of the test, including a control room simulator examination and a one-on-one demonstration.of specific operating tasks.

In order for the examinations to be approved by the NRC, they must comply with detailed NRC guidance which deals with matters such as the appropriate level of knowledge and difficulty, maintenance of examination security, and restrictions on test preparation by those significantly involved in training the license applicants.

" Operator Licensing Examination Standards for Power Reactors".(NUREG-1021) has been revised as guidance for implementation of the new process.

After the revised licensing examination process has become fully operational, the NRC staff will prepare at least one examination annually in each of the agency's four regions to ensure that proficiency in examination writing is maintained and to serve as a quality check on the process.

Historically, either NRC staff examiners or NRC contractors have prepared and administered all operator license tests.

In April 1995, the Commission approved an NRC staff proposal to begin a pilot program in which nuclear power plant licensees would prepare the te.:ts under NRC oversight.

The Commission took this action in recognition of the substantial improvements in industry training programs, to make the operator licensing program more efficient, and to realize budgetary savings.

The NRC staff solicited volunteers for a pilot program in a letter sent to all nuclear utilities in August 1995 and launched the program 2 months later. Between October 1995 and April 1996, the NRC staff reviewed and approved 22 operator licensing examinations prepared by utilities in 2

accordance with published NRC guidance. These examinations were used to test 146 applicants for r6 actor operator and senior reactor operator licensci.

l Based on information provided in an NRC staff briefing in June 1996 and the rulemaking plan in drafted September 1996, the Commission authorized continuation of the pilot program on a voluntary basis in December 1996 to provide time for the rulemaking process to be completed.

Historically the NRC has spent between $3 million sad $4 million annually on contractor support for the operator licensing program.

Licensing of operators for research and test reactors who will continue to be examined by the NRC would be unaffected by this proposed rui.e. The present system whereby utilities prepare and administer requalification examinations to licensed operators as part of an NRC-approved training program would also be unchanged.

I d

b 3

i

>O

[* "*%

RULEMAKING ISSUE (Notation Vote)

April 8, 1997 SEcY-97-079 EDB:

The Commissioners EBQM:

L. Joseph Callan Executive Director for Operations

SUBJECT:

PROPOSED RULE - INITIAL LICENSED OPERATOR EXAMINATION REQUIREMENTS PURPOSE:

To obtain Commission approval to l)ublish a proposed rule in the Federal Reaister that would amend 10 CFR Part 55 to require power react'or facility licensees to prepare the entire initial examination for reactor operators (R0s) and senior reactor operators (SR0s) and to proctor and grade the written portion of the examination. This proposed rule would also retain NRC's authority to prepare, administer, proctor, and grade these tests and examinations to maintain its proficiency in doing so and in the event that it loses confidence in a facility licensees' ability to prepare acceptable tests and examinations.

BACKGRollND:

On March 24, 1995. SECY-95-075. " Proposed Changes to the NRC Operator Licensing Program." informed the Ocatiission of the NRC staff's intent to revise the operator licensing program to allow greater partici)ation by facility licensees and to eliminate contractor assistance in t11s area.

In a staff requirements memorandum (SRM) dated April 18, 1995, the Commission approved the staff's proposel to initiate a transition process to revise the operator licensing program and directed the staff to carefully consider experience from pilot examinations before fully implementing the changes. On August 15, 1995, the NRC staff issued Generic Letter (GL) 95-06. " Changes in the Operator Licensing Program." outlining the revised process for developing CONTACT:

NOTE: To BE MADE PUBLICLY AVAILABLE WHEN Siegfried Guenther. NRR THE FINAL SRM IS MADE AVAILABLE (301) 415-1056 Harry S. Tovmassian. RES (301) 415-6231 l

i O

The Comissioners examinations and soliciting volunteers to participate in pilot examinations to evaluate and refine the methodology.

Between October 1. 1995, and April 5. 1996, the NRC staff reviewed and approved 22 operator licensing examinations that had been prepared by facility licensees in accordance with Revision 7 of NUREG 1021. " Operator Licensing Examiner Standards" (June 1994), as supplemented by guidance contained in GL 95-06. These examinations were then used to test 146 R0 and SR0 applicants.

The NRC staff documented the results of the pilot examinations in SECY-96-123.

" Proposed Changes to the NRC Operator Licensing Program." and briefed the Commission on June 18, 1996.

In an SRM dated July 23, 1996, the Commission directed the staff to prepare a rulemaking plan to justify the changes to 10 CFR Part 55 and to provide additional information regarding a number of issues related to the revised examination process.

On September 25, 1996. the NRC staff issued SECY-96-206. "Rulemaking Plan for Amendments to 10 CFR Part 55 To Change Licensed Operator Examination Requirements." The Commission approved the rulemaking plan in an SRM dated December 17. 1996.

DISCUSSION:

Pursuant to the SRM of December 17. 1996, in February 1997, the NRC staff issued an interim version of Revision 8 of NUREG-1021. which has been retitled

" Operator Licensing Examination Standards for Power Reactors."

The NRC staff will implement the interim revision on a voluntary basis until the rulemaking is complete.

NUREG-1021 was updated to incorporate lessons learned during the pilot examination program and will be further revised, as necessary, based on industry and public coments in response to the enclosed Federal Reaister notice. The NRC staff has also issued a supplement to GL 95-06 to inform power reactor facility licensees of the results of the pilot examination' 3rogram and the NRC's decision to continue the 1110t process on a voluntary 3 asis using interim Revision 8 of NUREG-1021, w111e in parallel pursuing mandatory implement. tion by the industry.

As directed by the Commission, the Office of Nuclear Reactor Regulation (NRR) has continued to monitor the results of the facility-prepared examinations for indications that might dissuade the Commission from approving the proposed rulemaking. As an extensior, of the original pilot program. NRR has asked the NRC examiners to respond to a survey on various aspects of the revised examination process.

Furthermore, as noted in SECY-96-206. NRR will continue to audit and review the level of knowledge and the level of difficulty of selected written examinations and operating tests.

Between August 19, 1996, when the NRC staff resumed conducting pilot-style examinations, and the end of December 1996 the staff reviewed, approved, and administered 12 examinations that were developed by facility licensees based on the guidance in GL 95-06. This raised the total number of examinations completed using the pilot process to 14, including the 22 examinations that were conducted under the original pilot program between October 1. 1995, and April 5. 1996.

Facility-prepared examinations were administered to 84 R0

~

The Comissioners -applicants and 144 SR0 applicants during the pilot program through December 31, 1996. The results of these examinations are summarized below; the power reactor licensing examination results for fiscal year 1995 are provided for comparison.

The pass rates for the facility-prepared examinations administered did not vary signtficantly from those prepared by the NRC, Power Reactor Pass Rates Examinations R0 R0 R0 SR0 SR9 SR0 Written Operating Total Written Opera.:ing Total

' Facility-Prepared 93%

95%

88%

94%

96%

91%

Since October 1, 1995 Fiscal Year 1995 94%

98%

92%

95%

95%

92%

i The most common problem identifled by the NRC examiners regarding the facility-)repared examinations was that the level of knowledge and difficulty of the su)mitted examinations did not consistently discriminate at the appropriate level and that considerable effort was required to work with the facility licensee to revise the examinations to correct this condition. As noted in SECY-96-206 NUREG-1021 has been modified to establish a standard that at least half of the examination questions be written at the cnmprehension or analysis level. This criterion will take effect when Revision 8 of NUREG 1021 is implemented and should help improve the level of l

knowledge tested by the submitted examinations.

Although NUREG-1021 contains criteria that should help establish an appropriate level of difficulty for the examinations, the personal experience i

and judgment of the author and reviewer of the examination remain the most important factors in controlling the level of difficulty. Traditionally,.an s

NRC or contract examiner established the level of difficulty of the examination. The facility licensee was given an opportunity to review the

. examination before it was administered.

In most cases, the review with the facility' licensee focused on technical issues which the NRC examiner and facility reviewer could easily resolve. On occasion, the facility reviewers have complained that an examination was too difficult.

However reviewers seldom recommended changes that would increase the difficulty of the examination if it was aerceived to be easier than normal. Under the revised examination process, t1e facility licensee would establish the level of difficulty of the examination.

The NRC examiner would work with the facility author to make whatever changes are necessary to ensure that the examination discriminates at the appropriate-level. Consequently.-the facility-prepared i

examinations:are generally more difficult to finalize because of the facility licensees

  • tendency to resist the NRC examiners' efforts to make the examinations more difficult. The revised examination process has significantly changed the focus of the examiners' job from ensuring the technical accuracy of examinations prepared by the NRC or its contractors to i

the much more demanding task of ensuring that the facility licensees maintain the level of difficulty of the examinations that they submit to the NRC for i

review and approval.

Nevertheless, most NRC examiners who responded to the

--w

-+

}

l The Comissioners f NRR survey continue to believe that the revised examination process is as effective as the traditional method.

Pursuant to its audit and review function, NRR has determined that 1 of the 12 pilot-style examinations conducted since resuming the program in August 1996 discriminated at a lower level than is currently the norm for NRC-orNRR conclu facility-prepared examinations.

provided an adequate basis for licensing the applicants but that the review conducted by the NRC Regional Office was weak and failed to identify and correct a number of test items that were too simplistic for use on a licensing The region is implementing a corrective action plan, with Furthermore, in response to the SRM of December 17, 1996, examination.

oversight by NRR.

NRR has issued a memorandum to the Regional Administrators emphasizing the importance of assigning adequate resources to carry out the not giving any examination that does not meet NRC standards for q task level of difficulty.

is not new to the pilot examination process and that similar deficiencies have been noted in the past on examinations prepared by NRC examiners or contractors.

As noted in SECY-96-206, another problem that surfaced during the pilot examination arogram involved an unexplained increase in the number of The staff has not applicants w1o appealed their examination failures.

questioned the applicants about their reasons for challenging the examination results, but it surmises that the pilot examination applicants may feel compelled to contest their failures when they perceive that their facility licensee is not sufficiently assertive in getting the NRC to delete questions or accept additional answers, which would reflect badly on the quality of the In an effort to cddress this examination that the facility prepared.

possibility, the staff has recommended in Revision 8 of NUREG Ar.other a)plicants during the process of grading the written examinations maintains that facility licensees lave generally become more cost-conscious and less willing to give applicants a second chance to pass the NRC licensing examination, so the applicants have nothing to lose by filing an appeal.

Regardless of the cause for the increase, NRR has revised the guidance in NUREG-1021 to afforo the staff the option of resolving selected appeals internally without convening a panel of examiners.

COORDINATION:

The Office of the The Office of the General Counsel has no legal objection.

Chief Financial Officer has no objection to the resource Utimates contained The Office of the Chief Information Officer concurs that there in this paper.

The ACRS and CRGR have been will be no information technology impacts.

contacted and have deferred res %w until the public comments are available for 3

final rulemaking.

The Commissioners

  • RESOURCES:

Resources to develop this rulemaking are included in the current budget and are estimated to be 0.5 FTE. This proposed action would allow the staff to eliminate between $3 million and $4 million in contractor support for operator licensing program. The FY 1997 and FY 1998 budget request.has been developed to be consistent with this proposal and reflects the anticipated reduction and elimination of contractor support for the operator licensing program.

If the Commission decides not to amend 10 CFR Part 55 as proposed by the NRC staff, it would require agency resources to be reprogrammed to increase the contract s 6, ort for the operator licensing program or the direct examiner resources in each regional office to satisfy the demand for initial licensing examinations.

SCHEDULING:

The staf f requests that the Comission provide its approval of this proposed rulemaking by April 18, 1997. This reguest is made to avoid a potential budgetary problem at the beginning of FY 1998.

If the final rule is not effective by that time and a need arises for additional NRC prepared examinations in the interim. It is anticipated that NRR will need to divert staff from other planned activities or reprogram contractual resources to meet this obligation.

RECOMMENDATION:

That tha Commission:

1.

Acorove the notice of proposed rulemaking (Enclosure 1) for publication in the Federal Reaister.

2.

Certify that this rule, if promulgated, would not have a significant economic impact on a substantial number of small entities to satisfy the requirements of the Regulatcry Flexibility Act. 5 U.S.C. 605(b).

3.

Determine that the backfit rule 10 CFR 50.109 does not apply to this proposed rule.

4.

Determine that neither an environmental impact statement nor an environmental assessment has been prepared because this 3roposed rule is eligible for a categorical exclusion as defined in 10 CFR 51.22(c)(1).

5.

HOLT:

a.

This proposed rulemaking will be published in the Federal Reaister for a 75-day public coment period:

b.

The Chief Counsel for Advocacy of the Small Business Administration will be informed of the certification regarding economic impact on small entities and the reasons for it as required by the Regulatory Flexibility Act:

_ _ _. ~.

The Comissioners

-6 The proposed rule contains information collection recuirements that-C.

are subject to review by the Office of Management anc Budget (OMB):

d.

A regulatory analysis has been prepared (Enclosure 2) e.

The appropriate Congressional comittees will be informed (Enclosure 3):

fi. - A public announcement will be issued (Enclosure 4); and g.

Copies of the notice of proposed rulemaking will be distributed to all' licensees. The notice will be sent to other interested parties upon request.

L.

> p Callan-Exec ive Director for Operations

Enclosures:

As stated -(4)

Consaissioners' coussents or consent should be provided directly to the office of the Secretary by cob Friday, April 18, 1997.

Commission Staff office comments, if any, should be submitted to the Cossaissioners NLT April 14, 1997, with an information copy to the office of the Secretary.

If the paper is of such a nature that it requires additional review and cousment, the Commissioners and the Secretariat should be apprised of when comments may be expected.

DISTRIBUTION:

Commissioners oGC oCAA oIG oPA-oCA CIo

'CFo EDo SECY a

t e

.m-

,.,--,---n,

,p

- O,f-U.

4 i

. 8 A-m 4

4 G

B f

ENCLOSURE 1 FEDERAL REGISTER NOTICE O

e 4

4 d

O

_ _ _ _ _ _ _ _ _.. - _ ~._ _

/*

/'//) / / [,[8,#

Q

  • t IMAGE EVALUATION 4 )y g ( )

v TEST TARGET (MT-3) 4

%pf'

% k 2

' l.0 Em M 5!NE I.l l'*EE 1.8 e=es 1.25 1.4 1.6 4

150mm

  1. !$./zz'h f 4,; : h
  1. 3 4

7;a,=-

a#*!e@#

C#

o b

T#

IMAGE EVALUATION

//g'j g.d4 g)R>l<?

'%/,pg TEST TARGET (MT-3) f l.0 lf 52 m 5$ E i-l E m HM t.:

==ea

~ ~

1.25 1.4 1.6

=

4 150mm 4

  • d#%

/<f4%

+%,e.;

4Rp,f,,h//

__y==,, y__

4 m es g,

useo

4 9 0

O

+#** h '

////

gb

/

4 IMAGE EVAL.UATION

///

\\

TEST TARGET (MT-3) 1.0 52 BM y ll RE I,1

[5 He l28

~

l.25 1.4 1.6 4

150mm d*%zzzz

/f4%

v% y,,,,

__p;g<g__ +4}a 4 45 g) g ppp

""An7dia:"'"

/

+& &

O

////p

$b,

IMAGE EVAL.UATION 4

4)R>,/

%,)j[$[

,y +

TEST TARGET (MT-3) f 4

l.0

'f82 R4 yljEE i,i

[m lliln l4 l.25 1.4 1.6 4

150mm 4

6"

  1. 4 4$<$

4 4%

  • R,,,,,h ?

%, Y, WEBST R NE Y R 14580

l.

[7590-01-P]

NUCLEAR REGULATORY COP 911SSION 10 CFR Part 55 RIN 3150-AF62 Initial Licensed Operator Examination Requirements AGENCY: Nuclear Regulatory Commission.

ACTION:

Proposed rule.

SUMMARY

The Nuclear Re2ulatory Commission (NRC) is proposing to amend its regulations to require all nuclear power facility licensees to prepare, proctor, and grade the written ex.sminations and prepare the operating tests that the NRC, currently uses to evaluate the competence of individuals applying for operator licenses at those plants. The proposed amendment would require the licensee to submit each examination and' test for the NRC's review and approval and would preserve the NRC's authority to prepare the examinations and tests, as necessary, if it loses confidence in a licensee's ability to prepare these examinations acceptably.

In addition, the NRC would periodically invoke this authority in order *.o maintain the proficiency of its own license examiners.

DATES: Submit comments.by [ Insert the date 75 days after publication ~1n the Federal Register). Comments received after this date will be considered if it is practical to do so, but the Commission is able to assure consideration only for comments received on or before this date.

ADDRESSES:

Comments may be sent to: Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555. Attn: Docketing and Service Branch. Hand deliver comments to 11545 Rockville Pike, Rockville, Maryland, between 7:30 am and 4:15 pm on Federal workdays.

For information on submitting comments electronically, see the discussion under Electronic Access in the Supplementary Information section.

Single copies of this proposed rulemaking may be obtained by written request or telefax ((301) 415-2260) from Harry S. Tovmassian, Office of Nuclear Regulatory Research, U.S. Nuclear Regulatory Commission, Washington DC 20555. Certain documents related to this ralemaking, including comments received, may be examined at the NRC Public Document Room, 212,0 L Street NW (Lower Levei). Washington, DC. These same documents may also be viewed and downloaded electronically via the Electronic Bulletin Board established by NRC for this rulemaking as indicated in the Supplementary Information section.

FOR FURTHER INFORMATION CONTACT: Harry S. Tovmassian, Office of Nuclear Regulatory Research, U.S'. Nuclear Regulatory Commission, Washington, DC 20555, telephone (301) 415-6231; e-mail hstenrc. gov.

SUPPLEMENTARY INFORMATION:

Background

Section 107 of the Atomic Energy Act (AEA).of 1954, as amended, requires the NRC to determine the qualifications of individuals applying for an operator license, to prescribe unifor:..unditions for licensing such 2

individt als,- and to issue licenses as-appropriate.

Pursuant to the AEA, d

10 CFR Part 55 requires applicants for operator licenses to pass an examination that satisfies the basic content requirements specified in the-regulation. Although neither the AEA'nor Part 55 specifies who aust prepare, proctor. -or grade these examinations, the NRC has t'ditionally performed l

those tasks itself or through its contract examiners.

In accordance with 10 CFR 170(i). NRC staff and contractual costs are recovered from facility i

l_

licensees who receive examination services. The NRC and its contract examiners have used the guidance in NUREG-1021 " Operator Licensing Examination Standards for Power Reactors," to prepare the initial operator licensing examinations. This document has been revised as experience has been acquired in preparing these sxaminations. The current version is designated Interim Revision 8.8 The intended modifications to 10 CFR Part 55 would allow facility licensees to have greater participation in the initial operator licensing process and enable the NRC to eliminate contractor assistance in this area.

Between $3 million and $4 million in contractor support for the preparation and administration of the initial operator licensing examinations and for On support of requalification program inspections would be eliminated.

April 18, 1995, the Commission approved the NRC :;taff's proposal to initiate a transition process to revise the operator licensing program and directed the NRC staff to carefully consider experience from pilot examinations before fully implementing the changes.. On August 15, 1995, the NRC staff issued

' Copies are available for inspection or copy ng for a fee from the NRC i

Public Document Room at 2120 L Street NW., Washington, DC 20555; the PDR's fax (202) 634-mailing address is Mail Stop LL-6; telephone (202) 634-3273:

3343. - Interin Revision 8 is also available for downloading.from the Internet t

at "http://www.nrc. gov."

3 w

=.-e

--,-w w-e m.

s-

+4,-,..-----

Generic Letter:(GL) 95-06, " Changes in'the Operator Licensing Program,"'

outlining the revised examination development process and soliciting

- volunteers to participate in pilot examinations to evaluate and refine the 7

- methodology.-

Between October 1,-1995,_and April:5, 1996, the NRC: staff reviewed and approved 22 operator licensing examinations, including _both the written:

examinations and.the operating tests, prepared by facility licensees as part.

s These examinations were prepared using the guidance in of a pilot program.

Revision 7 (Supplement 1) of NUREG-1021 and the additional guidance in GL 95-8 1

06.' 'These examinations were used to test 146 reactor operator (RO) and senior reactor operator-(SRO) applicants, L

- The results of the pilot examinations were discussed in SECY-96-123, i

" Proposed Changes to the NRC Operator Licensing Program," dated June 10, 1996.

Based on the results of the pilot program, the staff recommended that the p

Commission app _ rove the implementation of the new examination process on a voluntary basis until rulemaking could be completed to require all power s

reactor facility licensees to prepare the entire initial examination for

-reactor operators and senior reactor operators and to proctor the written portion of-the examination. On July 23, 1996, the Commission authorized the b

staff to continue-the pilot examination process on a voluntary basis and requested the staff to develop a detailed rulemaking plan to justify the changes that_may be necessary to 10 CFR Part 55. The Commission also directed the 2taff-to address a number of additional items- (e.g., pros, cons, and

' Copies are available for. inspection or copying for a fee from the NRC Public Document Room at 2120 L. Street NW., Washington, DC 20555; the PDR's mailing address is Mail Stop LL-6,; telephone (202) 634-3273; fax (202) 634-

3343.-

4

,,..n

.v-

-- n

i f-l

- vulnerabilities) regarding the revised examination process to_ facilitate a Commission ~ decision on whether to implement the revised process on an industry-wide basis.

On September 25, 1996, the staff forwarded the requested rulemaking plan and a response to the additional items to the Connission in SECY-96-206, "Rulemaking Plan For Amendments to 10 CFR Part 55 to Change Licensed Operator Examination Requirements." On December 17, 1996, the Commission directed the staff to proceed with the proposed rulemaking.

With Commission approval, thr. staff resumed conducting pilot-style examinations on August 19, 1996, and by the end of December 1996 had reviewed, approved, and administered 12 additional examinations that were developed by facility licensees based on the guidance in GL 95-06. Thi's raised the total number of examinations completed using the pilot process to 34 and the number of-applicants tested to 84 Ros and 144 SR0s.

i Discussion The pilot program demonstrated that the revised process, using licensee developed examinations, can be both effective and efficiant. Comments from the NRC staff and industry personnel who participated in the pilot examination were generally favorable. The quality of the licensee-developed 4

s

-examinatlons (as modified by the NRC) was generally comparable to the examinations prepared by the NRC staff or its contractors. All of the licensee-developed examinations required some modifications subsequent to NRC-

[-

review; however,'several of these examinations required-significant rework, indicating that some licensees did not fully understand the criteria for 5

s

I preparing examinations which meet NRC standards. With training and experience, it is expected that the industry would gain proficiency in i

preparing the examinations. The monitoring and assessment of this voluntary pilot program has demonstrated that facility licensee developed examinations, as modified by the NRC, are comparable in terms of their quality to those prepared by tht: NRC and its contract examiners under the existing process; therefore, the. safe operation of the facility in question is in no way compromised.

The fact that the pass / fail results on the 34 pilot examinations administered to the 84 R0s and 144 SR0s through the end of December 1996 were amparable to the power reactor licensing examination results during Fiscal Yoar 1995, when all the examinations were prepared by the NRC or its contractors, supports this conclusion. The provisions of the proposed rule in i 55.40(a)(2), which require NRC staff review and approval of facility licensee developed teLsts and examinations, should facilitate the monitoring of the quality of the submittals and the modification of those which do not meet NRC standards.

Availability of Guidance Document for License Examination Preparation Although 10 CFR Part 55 does not specify who will prepare, administer, and grade the written examinations and operating tests for reactor operator and senior reactor operator licenses, the NRC or its contract examiners have traditionally performed these tasks.

As a consequence of performing the tasks associated with preparing and administering the initial licensing examinations, the NRC has developed a substantial body of guidance, which has been published in various versions of NUREG-1021 to aid both NRC and its 6

e contract examiners. The latest version of NUREG-1021 (Interim Revision 8) incorporates the pilot examination criteria in GL 95-06, lessons learned during the pilot examinations, and a number of refinements prompted by the comments submitted in response to the Federal Register notice dated February 22, 1996 (61 FR 6869), which solicited public comments on the proposed NUREG changes. A copy of Interim Revision 8 of NUREG-1021 has been mailed to each facility licensee. Copies may be inspected and/or copied for a fee at the NRC's Public Document Room, 2120 L Street NW (Lower Level),

Washington, DC.

NUREG-1021 is also electronically available for downloading from the Internet at "http://www.nrc. gov." All iaterested parties are invited to comment on Interim Revision 8 of NUREG-1021 in addition to the proposed rule. These public comments will be addressed, and Reviad 8 will be published as a final NUREG document.

The NRC plans to prepare, administer, and grade initial operator licensing examinations at least four times per year, using NUREG-1021 as guidance. Licensees would also be expected to use the guidance contained in NUREG-1021 to prepare the licensing examinations. The NRC staff would review and approve any deviations from this guidance. The NRC will not approve any deviation that would' compromise its statutory responsibility of prescribing uniform conditions for the operator licensing examinations.

Examples of unacceptable deviations include, but are not limited to, the use of essay questions in place of multiple choice questions and the administration of open book examinations.

7

Proposed Rule

-This proposed regulation would add a new section t 55.40,-

" Implementation, to Subpart E of 10 CFR Part 55 which would require power reactor facility licensees to prepare the written examinations and operating tests, to; submit' them to the NRC for review and approval, and to proctor and-grade-the written examinations. These requirements would be contained in il 55.40(a)(1), (2), and (3), respectively.

Each power reactorifacility licensee would be required to prepare and submit the-proposed examinations (including the written examination, the walk-through, and the dynamic simulator tests) to the NRC consOtent with the guidance contained in NUREG-1021. -The NRC staff would review the entire examination and direct whatever changes are necessary to ensure that adequate

. levels'of quality, difficulty, and consistency are maintained. After the hRC staff reviews and approves an examination, the facility licensee would proctor The and grade the written portion consistent with the guidance in NUREG-1021.

NRC staff would continue to independently administer and grade the operating tests, review and approve the written examination results, and make the final licensing decisions. The facility licensee would not conduct parallel operator evaluations during the dynamic simulator or the walk-through' tests.

Pursuant to proposed requirements in i 55.40(b), the NRC staff would maintain the authority to prepare the examinations and tests and to proctor and grade the site-specific' written examinations. This proposed rule would allow NRC to maintain its staff capability to perform these activities. Also, if..-the NRC has reason to question a licensee's ability to prepare an 8

l,.

w Un-

44-2wTN-6

++r e

eem4 e

ex--

?eMe+.,

++'.e-me-i+dI9-*

+We-

-rwr--n-

- - - * = - * -

--W

-+mwewe=

-pwww-w

- em w-

acceptable examination, 5 55.40 (b)-provides the NRC-authority to prepare and administer the examinations and tests.

Paragraph (c)Lofl-55.40 reasserts-thatthsNRCwouldcontinueto prepare and administer the written examinations and operating tests at non-.

power reactor facilities. The NRC has taken this position because the non-power-reactor community does not have an accreditation process for training and' qualification or the resources to prepare the examinations.- However, the process will be implemented using only NRC examiners, thereby allowing the

- elimination of all routine contract assistance in that area.

L Electronic Access Comments may be submitted electronically, in either ASCII text-or Wordperfect format-(version 5.1 or later), by calling the NRC Electronic -

I Bulletin Board (BBS) on FedWorld. The bulletin board may be accessed using a personal computer, a modes, and one of the commonly available communications software packages, or directly via Internet.

Background documents on the s

rulemaking are also available', as practical, for downloading and viewing on the bulletin board.

If.using a personal computer and modem, the NRC rulemaking subsystem on FedWorld can be accessed directly by dialing the toll free number (800) 303-9672.

Communication software parameters should be set as follows:

parity to none, data bits.to'8, and stop bits-to 1 (N,8,1). Using ANSI or VT-100 terminal. emulation, the NRC rulemaking subsystem can then-be accessed by selecting the " Rules Menu" option from the "NRC Main Menu." Users will find the' "FedWorld Online. User's Guides" particularly helpful. Nany NRC subsystems 9

y,-,r-.s-

,,..-,e.

e

~ -... -

4 anu data bases also have-a " Help /Information Center" option that is tailored to the particular subsystem.

The NRC subsystem on FedWorld can also be accessed by a direct dial phone number for the main FedWorld BBS, (703) 321-3339, or by using Telnet via.

Internet: fedworld. gov.

If using (703) 321-3339 to contact FedWorld, the NRC subsystem will be accessed from the main FedWorld menu by selecting the

" Regulatory, Government Administration and State Systems," then' selecting

" Regulatory Information Mall." At that point, a menu will be displayed that has an option "U.S. Nuclear Regulatory Commission" that will take you to the NRC Online main menu. The NRC Online area also can be accessed directly by typing "/go nrc" at a FedWorld command line.. If you access NRC from FedWorld's main menu, you may return to FedWorld by selecting the " Return to FedWorld" option from the NRC Online Main Menu. However, if you access NRC at i

FedWorld by using NRC's toll-free number, you will have full access to all NRC sys.tems, but you will.not have access to the main FedWorld system.

If you cor. tact FedWorld using Telnet, you will see the NRC area and menus, including the Rules Menu. Although you will be able to download documents and leave messages, you will not be able to write comments or upload files (comments).

If you contact FedWorld using FTP, all files can be accessed and downloaded but uploads are not allowed; all you will see is a list of files without descriptions (normal Gopher look). An index file listing all files within a subdirectory, with descriptions, is available.

There is a 15-minute time limit for FTP access.

Although FedWorld also can be accessed through the World Wide Web, like FTP that mode only provides access for downloading files and does not display the NRC Rules Menu, t

10

.i

For more:information.on NRC. bulletin boards call Mr. Arthur Davis,.

Systems Integration and Development Branch, NRC, Washington, DC 20555, telephone (301) 415-5780; e-mail axd39nrc. gov.

d Environmental Impact: ~ C'ategorical Exclusion The NRC has determined that this proposed rule is the type of action described as a categorical exclusion in 10 CFR 51.22(c)(1).

Therefore, neither an environmental impact statement nor an environmenta1' assessment has been prepared for.this proposed regulation.

2 Paperwork Reduction Act Statement This-proposed rule amends information collection requirements that are

. subject to the Paperwork. Reduction Act of 1995 (44 U.S.C.-3501.et seq). This rule has been submitted to the Office of Management and Budget for review and approval of the information collection requirements.

The public reporting burden for this collection of information s

.est mated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing i

instructions, searching-existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information (i.e.,

preparing the examinations). The U. S. Nuclear Regulatory Commission is seeking public comment on the potential impact of the collection of information contaitied in the proposed rule and on the following issues:

4 11 1

i..

,~

.. ~..

.r

1.

Is_the~ proposed collection of information necessary.for the proper

]

performance of the functions of the NRC, including whither the information will have practical uti1ity?.

~

'2.

Is the estimate of burden accurate?

3.- ;Is there a way to enhance the quality, utility, and clarity of the, information to be collected?

4.

How can the burden of the collection of information be minimized,

[

including the use of automated collection techniques?

Send comments on any aspect of this proposed collection of information, including suggestions for reducing the burden, to the Information and Records Management Branch (T-6F-33), U.S. ' Nuclear Regulatory Commission, Washington, DC 20555-0001, or-by Internet electronic mail at-bjs19nrc. gov; and to the Desk Officer, Office of Information and Regulatory Affairs, NE08-10202, (3150-0018,and 3150-0101), Office of Management _and Budget, Was'hington, DC 20503.

Comments to OMB on the collections of information or on the above issues should be ' submitted by-[ insert date 30 days after publication in the Federal Register).- Comments received after this date will be considered if it is practical to do so, but assurance of consideration cannot be given to comments received-after this date.

s s

12 a

- - + + -

'?#

Y

?'

)

Public Protection Notification-

' The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently' valid OMB control number.

Regulatory Analysis The Commission has prepared a draft regulatory analysis on this proposed regulation. The analysis examines the costs and benefits of the alternatives considered by the Commission.

The draft analysis is available for inspection in the NRC Public Document Room, 2120 L Street NW (Lower Level), Washington, e

DC. -Single copies of the analysis may be obtained from Harry S. Tovmassian at (301)415-6231.

i-The Commission requests public comment on the draft regulatory analysis.

Comments on the draft analysis may be submitted to the NRC as indicated under the ADDRESSES heading.

Regulatory Flexibility Certification In accordance with the Regulatory Flexibility Act of 1980. (5 U.S.C.

605(b)), the Commission certifies that this rule will not, if promulgated, have a significant economic iapact on a substantial number of small entities.

This proposed rule-affects only the licensing and-operation of nuclear power plants. The companies that own these plants do not fall within the scope of.

- the definition of "small entities" set forth in the Regulatory Flexibility Act 13 7

m

.r

]

4

- oritheSmallBusinessSizeStandardss'etoutinregulationslissuedbythe-Small Business' Administration at:13 CFR Part 121.-

Backfit Analysis The Commission has' concluded that requiring the facility licensees to prepare the initial operatur licensing examinations is not a backfit pursuant to 10 CFR 50.109.

-The proposed change does not result in a modification of or an addition L

l to-systems,. structures, components, or the design of a facility.. The change I

does not affect the design approval or manufacturing license for a facility.

The procedures requirmi to design or=cperate a facility would not be affected by the proposed change.- The proposed change would require each nuclear power I

plant licensee tu develop the. tests that are used to qualify, in accordance i

with the requirements of 10 CFR-Part 55, those-nuclear power plant operators whom the nuclear power plant licensee wishes to employ. Development of such tests are not considered to be " procedures... required to... operate a l

facility." Any procedure necessary to develop the test would not be useful in actually " operating" the facility, even if one broadly interprets " operating" 5

as including any action.necessary to comply with the Commission's regulations with respect to operation. The organization required to design or operate a c

facility _ would not' be affected because all facility licensees already have a training _ staff to train and'avaluate applicants for operator licenses and to

' train other members of the plant staff, as required by 10 CFR Part 55 and by

' 10 CFR 50.120.

14

+

9 4

fu

't-'

w gu a-'

M v

we-'

'es e

-+w-e-a w

--'m,w n

.w

List of Subjects in 10 CFR Part 55 Criminal penalties, Manpower training programs, Nuclear power plants hnd reactors, Reporting and recordkeeping requirements.

Fo'r the reasons set out in the preamble and under the authority of tha Atomic Energy Act of 1954, as amended; the Energy Reorganization Act of 1974, as amended; and 5 U.S.C. 553; the NRC proposes to adopt the following amendments to 10 CFR Part 55.

PART 55--OPERATOR'S LICENSES 1.

The authority citation for Part 55 continues to read as follows:

AUTHORITY: Secs. 107, 161, 182,-68 Stat. 939, 948, 953, as amended, sec. 234, 83 Stat. 444, as amended (42 U.S.C. 2137, 2201, 2232, 2282),; secs. 201, as amended, 202, 88 Stat. 1242, as amended, 1244 (42 U.S.C. 5841, 5842).

Sections 55.41, 55.43, 55.45, and 55.59 also issued under sec. 306, Pub.

c L.97-425, 96 Stat. 2262 (42 U.S.C.10226). Section 55.61 also issued under secs. 186, 187, 68 Stat. 955 (42 U.S.C. 2236, 2237).

2.

In i 55.8 paragraph (b) is revised to read as follows:

1_55.8 Information Coilection Reatirements: OMB Approval.

(b) The approved information collection recuirements contained in this part appear in il 55.40, f 5.45, $5.53, gnd 55.59.

15

3.

A new i 55.40 is added to rea'd as follows:

i 55.40 Implementation.

(a) - Power reactor facility licensees shall --

(1)_ Prepare the required sits-specific written examinations and operating tests; (2) Submit the written examinations and operating tests'to the Commission for review and approval; and (3) Proctor and grade the NRC-approved site-specific written examinations.

(b)

In lieu of requiring a specific power reactor facility licensee to prepare tne examinations and tests or to proctor and grade the site-specific written examinations, the Commission may elect to perform those tasks.

.(c) The Commission will prepare and ade.inister the written examinations and opera' ting tests at non-power reactor facilities.

Dated at Rockville, Maryland, this day of

__, 1997.

For the Nuclear Regulatory Commission.

John C. Hoyle, Secretary of the Commission.

16

1 9

d d

J l

I a

1 k

J 5

ENCLOSURE 2 1

s N

t l

REGULATORY ANALYSIS s

E 44 g

w a

I d

t k

d d

e

+.

4:

4 l

PROPOSED REGULATORY ANALYSIS FOR RULEMAKING ON REQUIREMENTS FOR INITIAL LICENSED OPERATOR EXAMINATIONS 1.

Statement of Problem and Objective Section 107 of the Atomic Energy Act of 1954 (AEA), as amended. requires the NRC to determine the qualifications of individuals applying for an operator license, to prescribe uniform conditions for lit.ensing such individuals, and to issue licenses as appropriate. To implement this statutory mandate, operator license applicants are required by 10 CFR Part 55, " Operators' Licenses." to pass a written examination and an operating test, The written examination must satisfy the basic content requirements that are specified in the regulation. Although neither the AEA nor Part 55 specifies who must prepare administer, or grade these examinations. the NRC has traditionally performeo those tasks itself or through its contract examiners.

Because this has been a costly pro ess in terms of NRC staff manpower and contractual support, the NRC staff has evaluated an alternative approach which would require nuclear power plant licensees to prepare the examinations and subiait them to the NRC for review and approval. This approach has been tested and assessed through a voluntary pilot program and has been deemed by the NRC staff to be feasible. The monitoring and assessment of this voluntary pilot program has demonstrated that facility licensee prepared examinations.

as modified by the NRC. are comparable in terms of their quality to those prepared by the NRC and its contract examiners under the existing process, therefore, the safe operation of the facility in question is Thus, the NRC is proposing to amend 10 CFR Part 55 to not compromised.

require nuclear power plant licensees to prepare these examinations and has published Interim Revision 8 of NUREG-1021. " Operator Licensing Examination Standards for Power Reactors," as guidance.

This proposed action would eliminate the need for $3 million to $4 million in contractual support to the NRC. The FY 1997 and FY 1998 budget request is consistent with this proposal and reflects the elimination of contract support for the operator licensing program.

The NRC staff's primary objective in shifting responsibility for preparing the initial operator licensing examinations to the power reactor facility licensees is to reduce the amount of NRC resources used in this area. This change in policy is part of the NRC's continuing effort to streamline the functions of the Federal Government consistent with the Administration's initiatives and to accoiir.cdate NRC resource reductions.

Pursuant to the provisions of the AEA. the NRC will ensure that the quality of the operator licensing examinations, and the Effectiveness of the operator licensing program are maintained. These Changes are not intended to affect the format, content, length, and level of difficulty of the examinations. thereby minimizing the impact.

of the rule change on the operator license applicants, i

1 n

2.

Background-10 CFR 55.31(a)(3) requires the applicant for an operator _'s.icense to submit a written request from an authorized representative of the facility licensee that the written examination and the operating test be administered to the applicant.

Furthermore, 10 CFR 55.33(a)(2) states-that the Comission will approve an initial application for a license i.f it finds that the applicant has passed the requisite written examination and operating test in accordance with il 55.41 and 55.45 or 55.43 and 55.45. These written examinations and operating tests determine whether the applicant for an operator's license has learned to operate a and additionally, in the case of a

. facility competently and safely,licant has learned to direct the senior operator, whether the app licensed activities of licensed operators competently and safely.

As stated above, the NRC or its contract examiners have traditionally prepared, administered and graded the. written examinations and operating tests. In recent years, the NRC has spent between $3 million and $4 million per year to retain contractor support for the o>erstor licensing program.

In accordance with 10 CFR 170.12(1), the NRC' staff and contractual costs are recovered from the facility licensees that receive examination services.

The proposed rule would change the current practice in which the NRC l

prepares and proctors the initial examination for rertor operators and senior reactor operators and, instead, would require teoch power reactor facility licensee to prepare the entire examination and proctor the written portion of the initial examination. This action does not constitute a backfit pursuant to 10 CFR 50.109.

3.

Identification and Preliminary Analysis of Alternative Approaches 3.1 Alternative 1 Take No Action As discussed in SECY-96-206, the proposed change would allow the NRC staff to eliminate between $3 million and $4 million in contractor support for examination preparation and administration and for inspection support. The budget request for Fiscal Years (FYs) 1997 and 1998 is consistent with this proposal and reflects the current reduction (due to savings made possible by the ongoing pilot program) and eventual elimination of contract support.

If the Commission decides not to amend 10 CFR Part 55 as proposed by the NRC staff, it would require agency resources to be reprogramed to increase the contract support for the operator licensing program or the direct examiner resources in each regional office to satisfy the demand for initial licensing examinations and to conduct the-licensed operator requalification inspections.

9 k

2

i 3.2 Alternative 2 Provide Regulatory Guidance This alternative was rejected because the NRC staff considers implement-tion of the new process on a voluntary basis alone unworkable over the long term.

If the NRC does not require facility licensees to prepare the initial operator licensing examinations, there would be no guarantee that each licensee would elect to prepare these examinations.

With the elimination of contractor support and the increased uncertainty about examination quality, the NRC staff may no longer have sufficient examiner resources to prepare examinations consistent with the scheduling needs of facility licensees. This resource problem is further compounded by the unpredictable nature of the examination workload and by other unanticipated demands on the examiner work force, such as the increase in the number of examination appeals during the pilot examination program.

3.3 Alternative 3 Amend 10 CFR Part 55 This alternative would require every power reactor facility licensee to prepare the initial operator licensing examinations and to 3roctor the written portion of the examination. This would enable the 1RC to eliminate the use of contractors in the operator licensing program (with the exception of the generic fundamentals examinations) and result in an estimatea savings of $3 million to $4 million per year. Under this alternative, the NRC staff would undertake other tasks that are currently performed by contractors, including examination administration and inspections of licensee administration of requalification programs.

4.

Regulatory Impact - Qualitative Costs and Benefits Facility ticensees The NRC currently depends on NRC employees and contractors to prepare and administer the initial operator licensing examinations required by 10 CFR Part 55.

NRC contractors also assist in the inspection of facility licensee administration of requalification examinations.

In accordance with 10 CFR 170.12(1). the cost of NRC time spent and any related contractual costs are billed directly to the facility licensees that receive the examination services.

Under the proposed change each power reactor facility licensee would assume responsibility for preparing the site-specific initial operator licensing examinations at its facilities, thereby allowing the NRC to discontinue the use of contract examiners for that purpose.

Facility licensees would be expected to prepare and submit proposed examinations (including the written examination, the walk-through, and the dynamic simulator tests) to the NRC based on the guidance contained in NUREG-1021.

The training staffs at power reactor facilities already have the basic knowledge, skills, and abilities necessary to evaluate operator performance and develop test items for the initial licensing 3

j examination. During the mid-to late-1980s, the industry's emphasis in the training area increased significantly. All power reactor licensees -

established formal training programs that were based on a systems approach to training (SAT) and accredited by the National Academy for Nuclear Training.- Pursuot to 10 CFR 50.120 and 55.4. SAT-based training programs must include the evaluation of the trainee's mastery oftrainingobjectives. NRC-ins)ections of licensee requalification

. programs for licensed o>erators lave also found that training staffs generally possess the s(ills needed to evaluate the trainee's knowledge.

The NRC would review and approve the facility prepared examinations consistent with the guidance provided in NUREG-1021.

However, the NRC will not approve any examination which would have the effect of compromising its statutory responsibility of prescribing uniform conditions for these examinations. Examples of unacceptable deviations include, but may not be limited to, the use of essay questions in lieu of multiple choice and the administration of open rather than closed-After the NRC reviews and a) proves an examination, book examinations.

the facility licensee would proctor and grade tie written portion based on the guidance contained in NUREG 1021. The NRC staff will continue to

-administer and grade the operating tests, review and approve the written examination results recommended by the facility licensee, and make the final licensing decisions.

Feedback from the pilot examination program indicates that the average time spent by a facility licensee to prepare the written examination and o)erating tests was approximately 600 to 800 staff-hours.

A portion of tlat time (about 200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br />) would have been spent reviewing and assisting with the. administration of NRC developed examinations under the process now in' place and should be subtracted from the total. The resulting average burden of a3 proximately 400 to 600 staff-hours was somewhat higher than the 400 :1ours that NRC staff or its contract examiners typically take to prepare an examination. The extrt burden is generally attributable to the facility' licensees' lack of familiarity with specific NRC examination ex)ectations and to the additional administrative requirements, suc1 as documenting the source of the examination questions, that are required to maintain examination integrity.

It should be noted that some of the facility licensees that participated in the pilot program ex> ended less time than is commonly used by NRC contractors to-prepare tie examinations.

Furthermore, in a few cases, the examinations that facility licensees submitted for review and approval were, in the judgment of NRC chief examiners, as good as or better than those prepared by an NRC contractor.

The NRC staff expects that most facility licensees will eventually be able to prepare quality examinations in less time than the NRC or a contractor because the facility employees have more detailed knowledge of their facility and easier access to the reference materials required to prepare the examinations.

I The fact that contract examiners will not be used by the NRC in the revised examination process will eliminate the need for duplicate sets of reference materials to be provided to the NRC staff and to its 4

Feedback from the industry in contractors by facility licensees.

response to the NRC staff's solicitation of public comments on the draft revision of-NUREG 1021 indicated that facility licensees had been spending an additional 80 to 160 hours0.00185 days <br />0.0444 hours <br />2.645503e-4 weeks <br />6.088e-5 months <br /> to prepare and ship the reference materials under ")e existing examination process. Under the proposed process, the facility licensee would generally submit only materials which are needed to verify the accuracy of the examination questions.

This is considered to be a significant reduction but has not been quantified in this analysis, The additional burden of having to prepare the site specific initial operator licensing examinations is expected to be offset by reductions in 10 CFR Part 55 review fees billed to the facility licensees pursuant Each facility licensee would be billed only for to 10 CFR 170.12(1).

the time that the NRC staff spends to review the examination prepared by the facility licensee and to rework the examination, as necessary. to Although several of the draft pilot bring it up to NRC standards.

examinations were of poor quality and took the NRC staff more time than expected to review and rework, the staff believes that additional cost reductions would be realized as facility licensees gain experience with the NRC examination requirements and the quality of the facility developed examinations improves.

This rule change would give facility licensees more control over the cost of their examination services because they would be in a position The to manage the quality of the product that is submitted to the N.RC.

higher the quality of the examination that the facility licensee submits the lower the resulting charges. Under the existing examination process. facility licensees are res>onsible for the entire cost of preparing the examination, even if the 4RC contractor's submittal is of poor quality and requires significant rework by the NRC staff before it can be administered.

Facility licensees would have the option of retaining the services of a contractor to prepare the license examination as the NRC often does' under the current examination arocess. The NRC staff understands that NRC's examination contractors lave expressed an interest in providing their services directly to facility licensees.

In summary, the present system for developing licensing examinations relies primarily on NRC contractors to develop the examinations. with the cost then billed to the licensees. These particular examinations are highly plant-specific, requiring time for familiarization with plant procedures and equipment, and for the collection and transfer of information (library of procedures and documents) to enable this process Hence, to appropriately prepare and administer the to occur.

examinations, the NRC staff and contractors must learn the details of the operation of each specific plant.

In effect, this necessitates that the examining staff duplicate expertise already resident at each site simply to prepare the examinations. Clearly, efficiency could be gained f

if the NRC efforts were focused on the appropriate scope and depth of -

the examinations, leaving the preparation of the detailed material to 5

4 the licensee. 'The proposed rule would eliminate these inefficiencies by responsibility for preparing the examinations upon each placing the licensee.

Licensees would still have the option of using contractor There may be an initial assistance in preparing the examinations.

period:of inefficiency while licensees learn.the process for 3reparing these examinations. However. this period is expected to be s1 ort as the practice of relying on licensee personnel or their contractors to prepare this highly technical, plant specific examination becomes routine.

It is expected that with experience the facility licensee would be preparing quality examinations requiring less WRC review resources to be used with a larger potential savings to the licensee.

An accurate cost savings to the industry is difficult to quantify

-because the NRC does not have a basis to estimate the magnitude of the

-efficiencies that might be gained by having the licensee and/or its contractors prepare the examinations. However, if it is assumed that the facility licensees can p pare the examinations in the same amount of time that the NRC current allots its contract examiners to perform the task (i.e., approximate 1 400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br />) and that the time would be equally distributed between contractors and the licensee's own in house staff at an incremental cost of $120 per hour and $60 per hour, respectively, it would translate into an annual industry burden of $2.16 This would be roughly the million, assuming 60 examinations per year.

same cost if the NRC were to prepare the examinations relying equally on in-house and contractor staff efforts. Assuming that the facility licensees will be able to avail themselves of the aforementioned efficiencies and that a 10% reduction in the burden is attained, there would be a small industry-wide savings of about $0.22 million per year.

The staff also anticipates that a small savings may accrue because of the reduced need for the facility licensee to prepare and ship a large amount of reference materials to the NRC to enable the Comission and/or its contractors to prepare the examinations.

Operator license Acolicants The format. content, length, and level-of' difficulty of the examinations would remain unchanged. thereby minimizing the impact of the rule change on the operator license applicants. NRC examiners would continue to review and approve every written examination and operating test before it is administered. The examiners would work with the facility licensee's staff to modify the submitted examinations, as necessary, based on the guidance contained in NUREG-1021 in order to maintain consistency with prior licensing examinations at both that facility as well as among all other facilities.

If the NRC decides to pre)are the examination in lieu of accepting an examination prepared by t1e facility licensee, the NRC examiners would use the same procedures and guidance (i.e.. NUREG-1021) that the facility licensee would have used to prepare the examination.

6

NRC Staff As noted in SECY-96-123. the NRC examiners required an average of about 350 hours0.00405 days <br />0.0972 hours <br />5.787037e-4 weeks <br />1.33175e-4 months <br /> to review, prer - for, administer, grade, and document each of the 22 pilot examinati u s.

Assuming the same resource utilization rate and a stable examination workload, the NRC staff should be able to implement the new examination process and the requalification inspection program at all power reactor facilities with the same level of direct NRC resources as is currently allotted to the operator licensing

-program; no contractor support should be required (with the exception of the generic fundamentals examinations).

The variable nature of the examination workload was evident during the pilot examination program, when the number of examination appeals increased unexpectedly, thereby placing a significant burden on the examiner work force to review and resolve the applicants' concerns.

Before starting the pilot examination transition process, the examiners' workload was shared approximately equally between the NRC staff and its contractors.

Therefore, discontinuance of operator licensing contracts could limit the NRC staff's ability to assign personnel to meet peaks in facility licensee requests for examinations.

The impact of the loss of examiners due to reassignments, transfers promotions and other personnel actions will have a greater impact without the contract examiners available to offset the loss.

Furthermore. if the quality of an examination prepared by a facility licensee is significantly deficient, it will be difficult to predict the amount of time necassary to review or modify the examination so that it meets NRC standards.

This was the case with several of the pilot examinations, and the staff expects that this problem may ex)and as more facility-prepared examinations are submitted for NRC review. This uncertainty in the examination review process could increase the risk of broken examination commitments.

To address this issue, the NRC plans to have a larger pool of examiners available at each regional office. The exact number of examiners has not yet been determined and will vary from region to region depending on the number and major type of reactors involved.

However, it is anticipated that an approximate increase of 10-20 percent in the number of examiners may be necessary. This would be accomplished by training other staff members performing inspection activities to also be qualified as examiners. As mentioned above, although the overall expenditure of NRC resources in this area should remain about the same, having additional qualified examiners would help to alleviate peaks in scheduling.

This rulemaking is expected to take approximately 0.5 NRC staff years to complete and needs no contractor support.

5.

Decision Rationale The proposed amendments to 10 CFR Part 55 would require power reactor facility licensees to prepare the entire initial operator licensing 7

o l-examinations and proctor and grade the written portion of the examinations. The qualitative assessment of costs and benefits discussed above, leads the NRC to the conclusion that the overall impact of:the rulemaking_would not significantly increase licensee costs and could resul+, in a savings to licensees over time as they become more familiar with the NRC examination guidelines. The improvements in efficiency would be primarily due to the facility employees' better understanding of the plant design and operating characteristics and

.their ready access to the reference materials required to prepare and validate the examinations.

Based on the fact that this action has the potential to provide a cost savings to facility licensees as they become proficient in preparing the examinations, has negligible impact upon o mrator license applicants, provides a substantial cost savings to the NRC, and has no effect on safety. Alternative 3 has been selected as the preferred alternative.

6.

Implementation

- 6.1 Schedule No implementacion problems are expected. No effect on other schedules is anticipated, 4

4 8

,4 m

man.-

d ed.

A, kg--s.--

b Gu-4.....

.a

,,a_e.,

_,_a k

n,,

y

.,,n,.

1 me-46 m

.a a

~~

s m nw.4au6-e l

h l

l l

l

  • l l

\\

l 4

I i

!t 4

4 4

8 6

f l

ENCLOSURE 3 CONGRESSIONAL LETTERS h

s d,

J 9

e i,

9

(

W e

p-w,.y m

a

y.y 1

UNITED STATES p

0

];

NUCLEAR REGULATORY COMMISSION O

WAeHINGTON, D.C 3e086-4001 e.

The lionorable Dan Schaefer, Chairman Subcommittee on Energy and Power Committee on Connerce United States House of Representatives Washingten. DC 20515

Dear Mr. Chairman:

The NRC has sent the enclosed proposed amendments to the Commission's rules in 13 CFR Part 55 to the Office of the Federal Register for publication. This rulemaking, if promulgated, would require facility licensees to prepare the entire initial examination for reactor operators and senior reactor operators and to proctor and grade the written portion of the examination.

Facility licensees would be required to submit the examinations and tests to the NRC for review and approval. This rulemaKing would preserve the NRC's authority to prepare the examinations and tests, as necessary. Historically, the NRC has spent between $3 million and $4 million annually on contractor support for tht aperator licensing program.

Section 107 of the Atomic Energy Act of 1954 (AEA), as amended, requires the NRC to determine the qualifications of individuals applying for an operator license, to prescribe uniform conditions for licensing such individuals, and Operator license applicants are required by to issue licenses as appropriate.

10 CFR Part 55, "Operatcrs' Licenses," to pass an examination satisfying the basic content requirements that are also specified in the regulation.

Although the AEA is not. specific as to who will prepare and administer the examination, the NRC has traditionally performed these functions through its staff or contract examiners..

Sincerely, Dennis K. Rathbun, Director Office of Congressional Affairs

Enclosure:

Federal Register Notice cc: Representative Ralph Hall e

i.

g 4

h'"

The Honorable Dan Schaefer, Chaiman 1-

-Subcounittee on Energy and Power

-Cossittee-on Commerce I

United States House of Representatives Washington, DC 20515 4

Dear Mr. Chairman:

+

The NRC has sent the enclosed pro ssed amendments to the Commission's rules in 10 CFR Part 55 to the Office of tte Federal Register for publication. -This rulemaking, if. promulgated, would require faci ity licensees to prepare the entire initial examination for reactor operators and senior reactor operators and to proctor and grade the written portion of the examination.

Facility licensees would-be required to submit the examinations and tests to the NRC for review and approval. - This rulemaking would preserve the NRC's authority to prepare the examinations and tests, as necessary. Historically, the NRC has spent between $3 million and $4 million annually on contractor support for the operator licensing program.

Section 107 of the Atomic Energy Act of 1954 (AEA), as amended requires the NRC to determine the qualifications of individuals applying for an operator license, to prescribe uniforia conditions for licensing such individuals, and to issue licenses as appropriate. Operator licens. applicants are required by 10_CFR Part 55, " Operators' Licenses,' to pass an examination satisfying the i-basic content requirements that are also specified in the regulation.

4 Although the AEA is not specific as to who will prepare and administer the L

examination, the NRC has traditionally performed these functions through its'

~

staff or contract examiners.

Sincerely, i

J

^

Dennis K. Rathbun, Director Office of Congressionel-Affairs

Enclosure:

Federal Register Notice i-cc:

Representative Ralph Hall Distribution:

RDB/Rdg/Subj/ central, RAuluck, EDO R/F DOCUMENT NAME:[0:\\TOVMASSI\\lL0E\\ CONGRESS \\LOE) n

.e ee.- me w

w c - em m m.m au.am r cm m.n au.am r - w..m 0FFICE RD8:DRA*

-l-RD8:DRA*

l-D:DRA*

OCA l

NAME HTovmassian' TMartin' BMorris DKRathbun DATE 02/05/97 02/05/97 02/28/97

/ /97 0FFICIA. RECORD COPY-(RES File Code) RES

-.:..=.-

j ja meeg g\\

UNITED STATES pN NUCLEAR REGULATORY COMMISSION s

WASHINGTON, D.C. SneeHeH

%,e...*

The Honorable James M. Inhofe, Chairman Subc4.mmittee on Clean Air, Wetlands, Private Property and Nuclear Safety Connittee on Environment and Publir Works United States Senate Washington, DC 20510

Dear Mr. Chairman:

The NRC has sent the enclosed pro)osed amendments to the Commission's rules in 10 CFR Part 55 to the Office of tie Federal Register for publication.

This rulemaking, if promulgated, would require facility licensees to prepare the entire inuttal examination for reactor operators and senior reactor operators and to proctor and grade the written portion of the examination.

Facility licensees would be requi.'ed to submit the examinations and tests to the NRC for review and approval. This rulemaking would preserve the NRC's authority to prepard the examinations and tests, as necessary. Historically, the NRC has spent between $3 million and $4 million annually on contractor support for the operator licensing program.

Section 107 of the A*cic Energy Act of 1954 (AEA), as amended, requires the NRC to determine tb,, alifications of individuals applying for an operator license, to prescrt 4 uniform conditions for licensing such individuals, and to issue licenses as appropriate. Operator license applicants are required by 10 CFR Part 55, ' Operators' Licenses,' to pass an examination satisfying the basic content requirements that are also specified in the regulation.

Although the AEA is not specific as to who will prepare and administer the examination, the NRC has traditionally performed these functions through its staff or contract examiners.

Sincerely, Dennis K. Rathbun, Director Office of Congressional Affairs

Enclosure:

Federal Register Notice cc:

Senator Bob Graham

4 The Honorable James M. Inhofe, Chainaan Subcommittee on Clean Air, WetlarAs, Private Property and Nuclear Safety Committee on Environment and Public Works United States Senate t

Washington, DC 20510 l

1-

Dear Mr. Chainsan:

The NRC has sent the enclosed proposed amendments to the Commission's rules 'in I

10 CFR Part 55 to the Office of the Federal Register for publication. This rulemaking, if promulgated, w3uld require facility licensees to prepare the entire in'tial examination for reactor operators and senior reactor operators d

l and to proctor and grade the written portion of the examination.

Facility licen wes would be required to submit the examinations and tests to the NRC

!l for review and approval. This rulemaking would preserve the NRC's authority to prepare the examinations and tests, as necessary. Historically, the NRC 4

has spent between $3 million and $4 million annually on contractor support for t

-the operator licensing program.

l Section 107 of the Atomic Energy Act of 1954 (AEA), as amended, requires the NRC to detemine the qualifications of individuals applying for an operator license; to prescribe uniform conditions for licensing such individuals and i

to issue licenses as appropriate. Operatorlicenseapplicantsareregulredby 10 CFR Part 55, " Operators' Licenses," to pass an examination satisfying the basic content requirements that are also specified in the regulation.

i Although the AEA is not specific as to who will prepare and administer the examination, 'the NRC has traditionally perfonned these functions through its staff or contract examiners.

Sincerely, d

Dennis K. Rathbun, Director Office of Congressional Affairs Enclosures i

Federal Register Notice cc: Senator Bob Graham Distribution:

RD8/Rdg/Sub.1/ central, RAuluck. EDO R/F "DOCLMDIT NAME:[0:\\T0VMAS$l\\IL0E\\CONGRES$\\L0E]

n h.o n.:en e mn.he m m.m.= c. c n ww en e==au.a.w

.. con wem n

  • n en wy

.e nu. m --

0FFICE RD8:DRA*

1 RDB:DRA*

0:DRA*

I OCA F

NAME HTovmassian TMartin BMorris DKRathbun DATE 02/05/g7 02/05/97 02/28/97

/ /97 OFFICIA. RECORD COPY (RES File Code) RES u,

.~...

m.

~ -.

  1. _,-a_a__e.

A...w4-_,s.

EL_.,,

_.m_,s_esA_a

. Mad..,au_,,a,__4.h4__%ed_g.4 4...h4.__a

.J,_A.a_.,4 w_ A% LA,.A_

an-mE4e h4.a,.a.m._ah4.-.. _ _

E

..mw,_m-swe ma. m a-,4edAL_,3.-

O e

e i

l i

i I

i I

I i

i I

1 l

ENCLOSURE 4 1

PUBLIC ANNOUNCEMENT Y

4 i

l 4

t J

l l

1 t

i

i COMISSION PUBLISHES PROPOSED RULE FOR UTILITY ROLE IN INITIAL REACTOR OPERATOR LICENSE EXANINATIONS The Nuclear Regulatory Commission has published a proposed rule in the Federal Renister which would require that all nuclear power plant licensees prepare, proctor, and grade their initial written reactor operator license examinations and prepare their operating tests subject to NRC approval.

Untti i

a final rule is adopted, applicants for operator licenses will continue to be examined by using either NRC-prepared tests or those prepared by utilities participating voluntarily in an NRC-supervised pilot program begun in 1995.

Reactor operator applicants seeking a license to manipulate the controls of a nuclear power plant must pass both a comprehensive, site-specific multiple-choice, written examination and a practical, hands-on operating test.

The generic fundamentals examination, a separate written test that each applicant must pass to be considered for the site-specific license examination, will continue to be written and administered by the NRC.

All examinations drafted by utilities would be subject to review, modification, and approval by NRC examiners before the tests are given.

If the submitted test or examination fails to meet NRC's quality standards, the NRC would have the option of preparing the test or examination in lieu of accepting or modifying one prepared by a utility. The NRC will continue to administer and grade the operating portion of the test, including a control room simulator examination and a one-on-one demonstration:of specific operating tasks.

In order for the examinations to be approved by the NRC, they must comply with detailed NRC guidance which deals with matters such as the appropriate level of knowledge and difficulty, maintenance of examination security, and restrictions on test preparation by those significantly tavolved in training the license applicants.

" Operator Licensing Examination Standards for Power Reactors' (NUREG-1021) has been revised as guidance for implementetton of the new process.

After the revised licensing examination process has become fully operational, the NRC staff will prepare at least one examination annually in each of the agency's four regions to ensure that proficiency in examination writing is maintained and to serve as a quality check on the process.

Historically, either NRC staff examiners or NRC contractors have prepared and administered all operator license tests.

In April 1995, the Commission approved an NRC staff proposal to begin a pilot program in which nuclear power plant licensees would prepare the tests under NRC oversight.

The Commission took this action in recognition of. the substantial improvements in industry training programs, to make the operator licensing program more efficient, and to realize budgetary savings.

The NRC staff solicited volunteers for a pilot prograic in a letter sent to all nuclear utilities in August 1995 and launched the program 2 months later.

Between October 1995 and April 1996, the NRC staff reviewed and approved 22 operator licensing examinations prepared by utilities in 2

e

.r

4 stscrdance with published NRC guidance. These examinations were used to test 146 app 1k ats for reactor operator and senior reactor operator licenses.

deswd on information provided in an NRC staff briefing in June 1996 and R

rulemaking plan in drafted September 1996, the Comission authorized continuation of the pilot program on a voluntary basis in December 1996 to provide time for the rulemaking process to be completed.

Historically the NRC has spent between $3 million and $4 million annually on contractor support for the operator licensing program.

Licensing of operators for research and test reactors uho will continue to be examined by the NRC would be unaffected by this proposed rule. The present system whereby utilities prepare and administer requalification examinations to licensed operators as part of an NRC-approved training program would also be unchanged.

3

-