ML20216E040
| ML20216E040 | |
| Person / Time | |
|---|---|
| Issue date: | 07/28/1999 |
| From: | Gilles N NRC (Affiliation Not Assigned) |
| To: | Beckner W NRC (Affiliation Not Assigned) |
| References | |
| NUDOCS 9908020033 | |
| Download: ML20216E040 (4) | |
Text
c
~
~
July 28, 1999 MEMORANDUM TO:
William D. Beckner, Chief Technical Specifications Branch Division of Regulatory improvement Programs, NRR FROM:
Nanette V. Gilles, Senior Operations Engineer Technical Specifications Branch Original Sigted By Division of Regulatory improvement Programs, NRR SUBJEC".
FORTHCOMING MEETING WITH COMBUSTION ENGINEERING OWNERS GROUP (CEOG) ON RISK-INFORMED TECHNICAL SPECIFICATIONS DATES & TIME:
August 5,1999 8:30 a.m. to 4:30 p.m.
August 6,1999 8:30 a.m. to 11:00 a.m.
LOCATION:
The Carriage House at the Park 233 Dyckman South Haven, Michigan 49090 PURPOSE:
To discuss the status of CEOG initiatives to develop risk-informed technical specification improvements.
PARTICIPANTS *:
NRC INDUSTRY Mark Rubin Alan Hackerott, OPPD (CEOG)
Millard Wohl Ray Schneider, ABB-CE Nanette Gilles Paul Hijeck, ABB-CE Other CEOG Representatives cc:
See attached.
CONTACT:
Nanette Gilles, NRR 301-415-1180
- Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetinos Opc a to the Public" 59 Federal Reaister 48340,9/20/94.
g DISTRIBUTION: See attached.
l -)
DOCUMENT NAME: G:VtTSBWILLESWITNCEoG080499WPD f
g} g)
C:RTSB. DRIP:NRR NAME NVGmesTil \\/M RLD M 5 #
WDBecknw lad 6, DATE 07/7 5 /99 07th/99 07ff M OFFICIAL RECORD COPY G-
), N gg1 y a k H g aa)
~
3001d 9908020033 990728 PDR TOPRP EMVC-E 97_/3/
[psCEltoq t
UNITED STATES g
j NUCLEAR REGULATORY COMMISSION t
WASHINGTON, D.C. 20086 0001 49,, g Julv 28, 1999 MEMORANDUM TO: William D. Beckner, Chief Technical Specifications Branch Division of Regulatory improvement Programs, NRR FROM:
Nanette V. Gilles, Senior Operations Engineer
({4tt Technical Specifications Branch Division of Regulatory improvement Programs, NRR
SUBJECT:
FORTHCOMING MEETING WITH COMB'JSTION ENGINEERING OWNERS GROUP (CEOG) ON RISK-INFORMED TECHNICAL SPECIFICATIONS DATES & TIME:
August 5,1999 8:30 a.m. to 4:30 p.m.
August 6,1999 8:30 a.m. to 11:00 a.m.
l OCATION:
The Carriage House at the Park 233 Dyckmen South Haven, Michigan 49090 PURPOSE:
To discuss the status of CEOG initiatives to develop risk-informed technical specification improvements.
PARTICIPANTS *:
NRC INDUSTRY Mark Rubin Alan Hackerott, OPPD (CEOG)
Millard Wohl
, Ray Schneider, ABB-CE Nanette Gilles Paul Hijeck, AB.B-CE Other CEOG Representatives I
cc:
See attached.
CONTACT:
Nanette Gilles, NRR 301-415-1180
- Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to " Commission Policy Statement on Staff Meetings Open to the Public" 59 Federal Reaister 48340,9/20/94.
n W. Beckner July 28, 1999 1
cc:
Mr. Gordon C. Bischoff Mr. Biff Bradley
- CEOG Project Manager Nuclear Energy Institute ABB Combustion Engineering Suite 400 M.S. 9615-1932 1776 l Street, NW Wash:ngton, DC 20006-2000 Day Hill Road 3708 Windsor, CT 06095 Mr. David Pilmer, Chairman CE Owners Group Southem Califomia Edison -
Inine Operations Center Room 109C23 Parker Street Irvine, CA 92718 Mr. Charles B. Brinkman, Director Nuclear Systems Licensing ABB-Combustion Engineering, Inc.
Pcst Office Box 500 2000 Day Hill Road Windsor, CT 06095 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations ABB-Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852.
Mr. Ray Schneider ABB Combustion Engineering, Inc.
1000 Prospect Hill Road P.O. Box 500 Windsor, CT 06095-0500 Mr. Paul Hijeck ABR Combustion Engineering, Inc.
1000 Prospect Hill Road
. P.O. Box 500 Windsor, CT 060w5-0500
. Mr. Alan Hackerott, Chairman Omaha Public Power District Ft. Calhoun Nuclear Station P.O. Box 399 Ft. Calhoun, NE 68023-0399
)
l
.c DISTRIQUTION:
July 28, 1999 E-Mail S. Collins /R. Zimmerman (SJC1/RPZ)
WFKane (WFK)
DBMatthews (DBM)
SFNewberry (SFN)
GMHolahan (GMH)
WDBeckner(WDB)
FMReinhart (FMR)
MRubin (MPR)
RJBarrett (RJB3) i MLWohl(MLW1)
PMNS (Meeting Announcemsnt Coordinator)
TSB Staff HARD COPY
'N FILE CENTER PUBLIC TSB R/F OGC ACRS l
I L
l I
L