Discusses Arrangements Made During 980407 Telcon Between Laeng & M Bielby for Administration of Licensing Exams at Davis Besse During Wk of 980803.Requests Exam Outlines by 980603
ML20216B924
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 04/08/1998
From: Leach M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Jeffery Wood
CENTERIOR ENERGY
References
NUDOCS 9804140189
Download: ML20216B924 (3)


Text

s

' $l g.

J' Mr. John K. Wood

-Vice President - Nuclear

. Davis-Besse Nuclear Power Station Centerior Service Company -

L 5501 North State Route 2 Oak Harbor, OH 43449

Dear Mr. Wood:

In a telephone conversation on April'7,1998, between Mr. Steve Laeng, Operations Training Staff and Mr. Michael Bielby, NRC, arrangements were made for the administration of licensing -

examinations at the Davis Besse Nuclear Power Station the week of August 3,1998. In addition, the NRC will make an examination validation visit to your facility the week of July 20, 1998.-

As agreed lduring 'the telephone conversation, your staff will prepare the examinations based on

~

the guidelines in Interim Revision 8, of NUREG-1021, " Operator Licensing Examination Standards for Power Reactors.".The NRC regional office will discuss with your staff any.'

i changes that might be necessary before the' examinations are administered.

To meet the above schedule, it will be necessary for your staff to fumish the examination -

outlines by June 3,1998. The written' examinations, operating tests,~ and the supporting

- reference materials identified in Attachment 2 of ES-201 will be due by July 3,'1998. Any delay

. In receiving the required examination and reference materials, or the submittal of inadequate or

incomplete materials, may cause the examinations to be rescheduled.

'l in order to conduct the requested written examinations and operating tests, it will be necessary -

- for your staff to provide adequate space and accommodations in accordance with ES-402, and to make the simulation facility available on the dates noted above. In accordance with ES-302, your staff should retain the original simulator performance data (e.g.', system pressures, j

temperatures, and levels) generated during the dynamic operating tests until the examination results are final.

l Appendix E of NUREG-1021 contains a number of NRC policies and guidelines that will be in effect while the written examinations and operating tests are being administered.

'i To permit timely NRC review and evaluation, your staff should submit preliminary reactor -

' operator and senior reactor operator license applications (Office of Management and Budget (OMB) approval number 3150-0090), medical certifications (OMB approval number 3150-0024),

- and waiver requests (if any) (OMB approval number 3150-0090) at least 30 days before the first examination date.L If the applications are not received at least 30 days before the examination.

date, a postponement may be necessary. Signed applications certifying that all training has been completed should be submitted at least 14 days before the first examination date.

\\

O 9004140189 990408 PDR ADOCK 05000346 I"[

V PDR

n.

-J. Wood 2

April 8, 1998 This letter contains information collections that are subject to the Paperwork Reduction Act of 1995 (44 U.S.C. 3501 et seq.). These information collections were approved by the Office of Management and Budget, approval number 3150-0101, which expires on April 30, 2000..

The public reporting burden for this collection is estimated to average 500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> per response, including the time for reviewing instructions, gathering and maintaining the data needed, writing the examinations, and completing and reviewing the collection of information. Send comments on any aspect of this collection of information, including suggestion 3 for reducing the burden, to the information and Records Management Branch (T-6 F33), U.S. Nuclear Regulatory Commission, Washington, D.C. 20555-0001, or by Intemet electronic mail at BJS1@NRC. GOV; and to ti;s Desk Officer, Office of Information and Regulatory Affairs, NEOB-10202, (3150-0101), Office of Management and Budget, Washington, D.C. 20503.

The NRC may not conduct or sponsor, and a person is not required to respond to, a collection of information unless it displays a currently valid OMB control number.

Thank you for your coopera" sn in this matter. Mr. Laeng has been advised of the policies and guidelines referenced in this letter. If you have any questions regarding the NRC's examination procedures and guidelines, please contact Michael Bielby at 630-829-9762, or me at 630-829-9705.

Sincerely, Original Signed by Dell R. McNeil (for)

Melvyn N. Leach, Chief Operator Licensing Branch i

Docket No. 50-346 cc:

John P. Stetz, Senior Vice President-Nuclear

- J. H. Lash, Plant Manager

'J. L. Freels, Manager Regulatory Affairs i

State Liaison Officer, State of Ohio Robert E. Owen, Ohio Department of Health C ' A. Glazer, State of Ohio, Public Utilities Commission -

R. A. Simpkins, Training Department -

DOCUMENT NAME: G:DRS\\DAV04018.DRS r.

., w a

w c c.--v.new.

r eme ev.ncio.u. v = em OFFICE.

Rill l4 Rill 4

l l

NAME MBielby:Jp mg6 MLeach k~IfrA DATE 04/2/98 04/6f98 OFRCIAL RECORD COPY

i

?

Distnbution-Docket File '

EPURUCI,ilE427 DRS Rill, PRR

SRI, Davis Besse

- R. M. Gallo, NRR/HOLB -

T. J. Kozak, DRP A. G. Hansen, LPM, NRR M. A. Bies, DRS 130n'7 4

.