ML20215J616
| ML20215J616 | |
| Person / Time | |
|---|---|
| Site: | Limerick |
| Issue date: | 05/22/1987 |
| From: | Gallo R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | Gallagher J PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| Shared Package | |
| ML20215J619 | List: |
| References | |
| NUDOCS 8706250058 | |
| Download: ML20215J616 (2) | |
See also: IR 05000352/1987007
Text
i'
'
,
,
,
.
MAY 2 P,1987
)
Docket No. 50-352
Philadelphia Electric Company
ATTN: Mr. J. W. Gallagher
i
Vice President
Nuclear Operations
j
2301 Market Street
'
Philadelphia, Pennsylvania 19101
Gentlemen:
Subject:
REQUALIFICATION PROGRAM EVALUATION REPORT NO. 50-352/87-07 (OL)
f
,
During the period of March 9, 1987 through March 25, 1987, the NRC audited the
1
administration of the annual requalification written and operating examinations
i
at your Limerick Generating Station. At the exit interview held on
March 25, 1987 the preliminary results of these evaluations were discussed.
l
Areas examined during this evaluation are described in the Region I evaluation
report which is enclosed with this letter. Within the scope of this
l
evaluation the requalification training program was found to be marginal. A
marginal evaluation is the criteria established for those programs falling
between satisfactory and unsatisfactory. Therefore, we request that you
review the enclosed evaluation report and inform me within 30 days of the date
of this letter of your proposed corrective actions and schedule for resolving
the identified deficiencies.
A followup audit will be scheduled for November, 1987 to ensure that effective
I
corrective-actions have been implemented. Operator and Senior Operator
l
license renewal applications will continue to be processed if corrective
actions identified are being implemented to the extent and in conformance with
your established schedule.
'
In accordance with Examiner Standard 601, Section G (NUREG-1021), documentation
of remedial training for those identified deficiencies shall be provided on all
license application renewals until such time as your Requalification Training
Program is evaluated as satisfactory.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter and the enclosure will be placed in the NRC Public Document Room.
1
This request for information was approved by the Office of Management and
{
Budget under Clearance Number 3150-0101, which expires May 31, 1989.
Comments
1
on burden and duplication may be directed to the Office of Management and
'
Budget, Reports Management Room 3208, New Executive Office Building,
Washington, D.C. 20503.
8706250058 870522
ADOCK 0500G352
V
k
ZEM
0FFICIAL RECORD COPY
05/22/87
n
f
'
t,
\\
-.
--
--
j
!:
1
.'
.
Philadelphia Electric Company
2
i
Should you have any questions concerning this report, please contact us.
Sincerely,
!
l
cvisical sinned 87
l
!
'
Robert M. Gallo, Chief
Projects Branch No. 2A
Division of Reactor Projects
Enclosure:
Requalification Evaluation Report No. 50-352/87-07
cc w/ encl:
John S. Kemper, Senior Vice President, Engineering and Production
G. Leitch, Nuclear Generation Manager
1
J. Franz, Manager Limerick Generating Station
j
E. Firth, Training Manager
'
Troy B. Conner, Jr. , Esquire
,
Eugene J. Bradley, Esquire, Assistant General Counsel
l
W. M. Alden, Engineer in Charge, Licensing Section
l
Public Document Room (PDR)
Local Public Document Room (LPDR)
i
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
l
Commonwealth of Pennsylvania
l
bcc w/ encl:
Region I Docket Room (with concurrences)
,
Management Assistant, DRMA (w/o encl)
!
Section Chief, DRP
!
D. Lange, Examiner
OL Plant File
MASTER FILE {WITH ALL ATTACHMENTS)
Chief, OLB, DLPQE, NRR
i
l
l
l
'
RI:DRP
RI:DRP
I RP
RI D P
-
Lange/mlb
Kell
1 fi's
Li ville
o
.
dh*f'
4
5
7
l
5/\\ /87
5/lf/87
5/p'/87
5//h/87
l
l
OFFICIAL RECORD COPY
1
05/I3/87
j
!
d