ML20215G980
| ML20215G980 | |
| Person / Time | |
|---|---|
| Site: | Fort Calhoun |
| Issue date: | 10/09/1986 |
| From: | Andrews R OMAHA PUBLIC POWER DISTRICT |
| To: | Martin R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| LIC-86-484, NUDOCS 8610210200 | |
| Download: ML20215G980 (1) | |
Text
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
DFF. GUARDS IMf0 MAT 10H g 96 Omaha Public Power District 1623 Harney Omaha. Nebraska 68102-2247 glf @
402/536 4000 October 9, 1986 I.
LIC-86-484 e
ENCL
. W5
=
R. D. Martin S AFEGU ARDS IMOR"ATION.
Regional Administrator
" US U. S. Nuclear Regulatory Commission iD Region IV 6112 Ryan Plaza Drive, Suite 1000 l
Arlington, Tx. 76011 1
References:
1.
Docket No. 50-285 2.
Letter, OPPD (R. L. Andrews) to NRC (J. E. Gagliardo, dated August 13, 1986 (LIC-86-376)
Dear Mr. Martin:
Transmittal of Fort Calhoun Station Security Plan Revision The purpose of this letter is to submit changes to the Fort Calhoun Site Security Plan regarding CAS and SAS designations in accordance with 10 CFR 50.54(p).
Please find enclosed revision 20 changes to the Fort Calhoun Station Site Security Plan, to be included in your controlled copy No. 6.
These changes are related to security building modification project described in Reference 2.
The specifics of the requested change are discussed in the attach-ment to this letter.
OPPD considers the described CAS/SAS changes effective immediately based on discussion with your inspector, Mr. Jim Kelly.
Since ely, R. L. Andrews Division Manager Nuclear Production RLA/me l
Enclosure cc w/o enclosure:
LeBoeuf, Lamb, Leiby & MacRae 1333 New Hampshire Ave., N.W.
Washington, DC 20036 Mr. D. E. Sells, NRC Project Manager Mr. P. H. Harrell, NRC Senior Resident Inspector cc w/: Copy No. 7 Harold R. Denton, NRC Director, Office of Nuclear Reactor Regulation 8610210200 061009
,y, MCI D
~"
F ih PDR ADOCK 0500 5
e,,y,
q<
j w,o. m.m