Text
i
2 1986
.
i
In Reply Refer To:
Docket:
50-285/86-26
Omaha Public Power District
ATTN:
R. L. Andrews, Division Manager-
Nuclear Production
1623 Hirney Street
Omaha, Nebraska 68102
Gentlemen:
This refers to the inspection conducted by Mr. James A. F. Kelly of this office
during the period September 15-19, 1986, of activities authorized by NRC
Operating License DPR-40 for Fort Calhoun Station, and to the discussion of our
findings with you and other members of your staff at the conclusion of the
inspection.
Areas examined during the inspection included management effectiveness,
security organization, security program audits, compensatory measures, security
system power supply, access control-vehicles, and security plan and
implementing procedures. Within these areas, the inspection consisted of
selective examination of procedures and representative records, interviews with
personnel, and observations by the inspector.
The inspection findings are
documented in the enclosed report.
During this inspection, it was found that certain of your activities were in
violation of NRC requirements.
Normally, you are required to respond to these
violations, in writing, in accordance with the provisions of Section 2.201 of
the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.
Your response during the inspection, which included an admission of the alleged
violation, an explanation of the causes, corrective steps which have been taken
with the immediate results, and the outlined corrective steps which will be
taken to avoid further violations, was based on the specifics contained in the
Notice of Violation enclosed with this letter.
Therefore, no written response
to this violation is required.
We have also examined actions you have taken with regard to previously
identified inspection findings.
The status of these items is identified in
paragraph 2 of the enclosed report.
>
r
I
AIWEP&SPS
C:EP&SFks
C:R&SP l
C:RPD/
C:RPB
JEGagl
ed'
JAFKelly/tw
LAYandeTl-
WLFishd@
DgHur't
f1///g/o
l
f,[/86
gl/p/86
IL/pi/86
\\/O /86
i
0612090300 061202
,
1
ADOCK 05000205
G
LNCLOSURE CottTAING
SAFEGUARDS INFORMATION.
,
l
4 god h
l
UPON SEPARATION lun
'
e w is er w n.ep
__ -__ __ -_____ _
.
Omaha Public Power District
-2-
The material enclosed herewith contains Safeguards Information as defined by
10 CFR Part 73.21 and its disclosure to unauthorized individuals is prohibited
by Section 147 of the Atomic Energy Act of 1954, as amended.
Therefore, the
material, with the exception of the report cover page, which is an inspection
summary, will not be placed in the Public Document Room.
Should you have any questions concerning this inspection, we will be pleased to
discuss them with you.
Sincerely,
ORIGINAL SIGNED BY:
J. E. Gagliardo, Chief
Reactor Projects Branch
Enclosures:
1.
Appendix A - Notice of Violation
t
2.
Appendix B - NRC Inspection Report
50-285/86-26
cc w/ summary page only:
W. G. Gates, Manager
Fort Calhoun Station
P. O. Box 399
Fort Calhoun, Nebraska 68023
Harry H. Voigt, Esq.
LeBoeuf, Lamb, Leiby & MacRae
1333 New Hampshire Avenue, NW
20036
Kansas Radiation Control Program Director
Nebraska Radiation Control Program Director
bec:
Copy of entire report:
RIV Security File
G. McCorkle, HMSS
J. Gibson, SSPD/NRR
IE File
Resident Inspector
R. D. Martin, RA
Security Inspector
Chief, EP&SPS
0. A. Powers, E0
R. L. Bangart, DRS&S
bec:
RIV - Letter and Inspection Summary only w/766:
RPB
D. Weiss, LFMB (AR-2015)
Section Chief (RPB/B)
RIV File
MIS
W. L. Fisher, RtSPB
RSTS Operator
R&SPB
bec:
RIV - Letter and Inspection Summary only w/out 766:
v0MB - IE04
E. H. Johnson, DRS&P
SAFEGUARDS lf4FORMATl0ft.
UP0t1 SEPARATl0tl THIS
PAGE IS DEC0t4 TROLLED.